Plan and orchestrate authorized Nmap host discovery, port and service enumeration, NSE profiling, and reporting artifacts for in-scope targets.
The English summary is being prepared. Showing the original description.
1.1K skills · sorted by relevance
Plan and orchestrate authorized Nmap host discovery, port and service enumeration, NSE profiling, and reporting artifacts for in-scope targets.
The English summary is being prepared. Showing the original description.
Build incident response timelines and report packs from event logs. Use for detection-to-recovery reporting, phase tracking, and stakeholder-ready incident summaries.
The English summary is being prepared. Showing the original description.
Validate database schema, migrations, indexes, and query behavior with structured pass/fail reporting.
The English summary is being prepared. Showing the original description.
Prioritize vulnerability remediation using KEV-style exploitation context plus asset criticality. Use for CVE triage, patch order decisions, and remediation reporting.
The English summary is being prepared. Showing the original description.
Design, audit, harden, review, or upgrade MCP servers and MCP Apps with revision-aware protocol profiles, explicit HTTP/deployment boundaries, capability-centered validation, bilingual reporting, and reproducible evidence. Use for MCP server architecture, JSON-RPC or Streamable HTTP bugs, security hardening, protocol-version migration, MCP Apps widget boundaries, review reconciliation, test planning, and public engineering evidence.
The English summary is being prepared. Showing the original description.
What every Ollama timing field means and the arithmetic that turns it into a claim - tokens per second, time-to-first-token, why total_duration is not latency, why a second run is faster, what changes with context length, quantization, GPU offload and parallel requests - plus the reporting rules that make a benchmark a measurement instead of an anecdote.
The English summary is being prepared. Showing the original description.
Toolkit for styling artifacts with a theme. These artifacts can be slides, docs, reportings, HTML landing pages, etc. There are 10 pre-set themes with colors/fonts that you can apply to any artifact that has been creating, or can generate a new theme on-the-fly.
The English summary is being prepared. Showing the original description.
Updates Azure Verified Module (AVM) references in a Bicep file to their latest versions, applying only non-breaking changes and reporting the result as a table. Use when Bicep templates pin outdated AVM versions or before an infrastructure release.
The English summary is being prepared. Showing the original description.
Product leadership for scaling companies. Product vision, portfolio strategy, product-market fit, and product org design. Use when setting product vision, managing a product portfolio, measuring PMF, designing product teams, prioritizing at the portfolio level, reporting to the board on product, or when user mentions CPO, product strategy, product-market fit, product organization, portfolio prioritization, or roadmap strategy.
The English summary is being prepared. Showing the original description.
Choose the design and the numbers a research run can honestly claim — write the structured METHOD RECORD (databases, date of access, search string, criteria, screening counts) that r0 validates, pick the claim strength a design can actually carry, record a statistic as data rather than prose, route to the reporting guideline the design owes, and decide what to preregister. Use when a run's question, design, search or statistics have to be settled before the writing, or when a claim needs a strength or a number attached to it.
The English summary is being prepared. Showing the original description.
QA Engineer role in AID methodology. Use for test strategy, BDD scenarios, bug reporting, acceptance testing, flaky test prevention.
The English summary is being prepared. Showing the original description.
Generate strategic-consultant-grade meeting minutes from transcripts or notes in Japanese OR English (matching the source language), then run a self-review loop (max 3 iterations) that checks for internal contradictions, action-item omissions, speaker-name errors, and date/day-of-week mistakes before reporting completion. Use this skill whenever the user asks to draft meeting minutes, summarize a transcript, or document a meeting discussion — including Japanese-language transcripts (議事録 / 会議メモ / 文字起こし) and English-language transcripts.
The English summary is being prepared. Showing the original description.
XML-specified Android UI journey testing, interactive step execution, assertion verification, and JSON outcome reporting.
The English summary is being prepared. Showing the original description.
Conducts comprehensive network penetration tests against authorized target environments by performing host discovery, port scanning, service enumeration, vulnerability identification, and controlled exploitation to assess the security posture of network infrastructure. The tester follows PTES methodology from reconnaissance through post-exploitation and reporting. Activates for requests involving network pentest, infrastructure security assessment, internal network testing, or external perimeter testing.
The English summary is being prepared. Showing the original description.
This skill outlines methodologies for performing authorized penetration testing against AWS, Azure, and GCP cloud environments. It covers understanding the shared responsibility model for testing scope, leveraging cloud-specific attack tools like Pacu and ScoutSuite, exploiting IAM misconfigurations, testing for SSRF to cloud metadata services, and reporting findings aligned to MITRE ATT&CK Cloud matrix.
The English summary is being prepared. Showing the original description.
Builds real-time incident response dashboards in Splunk, Elastic, or Grafana to provide SOC analysts and leadership with situational awareness during active incidents, tracking affected systems, containment status, IOC spread, and response timeline. Use when IR teams need unified visibility during incident coordination and post-incident reporting.
The English summary is being prepared. Showing the original description.
Standard Operating Procedures for read-only codebase exploration, symbol search, dependency mapping, code tracing, code review, architecture analysis, technical research, source evaluation, and evidence-based reporting.
The English summary is being prepared. Showing the original description.
Run the Tamanu release-branch CUTOFF checks when preparing to cut a new release/X.YY branch: confirm the previous release's hotfixes are merged to main, reconcile the commits since the previous release against the "Merged to main" card list from Linear, and scan for data/reporting/schema changes. Use when the user is cutting a Tamanu release and wants to verify the codebase is ready, wants to check main against the previous release branch, or wants to reconcile commits with a Linear "Merged to main" column (they should paste the card list). Handles Tamanu's train-release model (release/X.YY branches vs vX.YY.Z patch tags) and the cherry-pick model where the same logical fix has different SHAs on different branches. Purely git-based — no live database or Canopy access needed. Not for verifying an existing release branch's hotfix integrity (see pre-release-checks) or for deciding which tests to run (see scope-tamanu-release-tests).
The English summary is being prepared. Showing the original description.
List incoming deliverables held in quarantine: fixes, scripts and tasks that arrived over file sync from an unverified source or without a signature and are not applied until the owner decides. Fail-closed by design. Triggers: "/quarantine", "what is quarantined", or a deploy check reporting held items.
The English summary is being prepared. Showing the original description.
Use when advising, planning, reviewing, reporting, operating, or improving CTO and technology leadership work across strategy, cybersecurity management, SME/COE, functional and technical requirements, framework selection, people, organization, delivery, risk, KPI, roadmap, budgeting, governance, audit, R&D, stakeholder communication, culture, politics, and sector-specific leadership.
The English summary is being prepared. Showing the original description.
Use when reporting build, test, or deploy results - enforces real tool output over plausible claims.
The English summary is being prepared. Showing the original description.
Knowledge base from the NASA Schedule Management Handbook (2024 edition, Revision 2). Use for program/project schedule management of aerospace and large engineering efforts: the five sub-functions (Planning, Development, Assessment & Analysis, Maintenance & Control, Documentation & Communication); the Integrated Master Schedule (IMS) and the WBS/OBS/CBS breakdown structures; the Schedule Management Plan (SMP) and Basis of Estimate (BoE); Critical Path Method, logic, durations, float and margin; tiered schedule assessment (Requirements/Health/Basis checks, the Shock Test) and the Dimensions of Schedule Reliability; Schedule Risk Analysis (SRA), Integrated Cost-Schedule Risk Analysis (ICSRA), Monte Carlo, correlation, merge bias, and the Joint Confidence Level (JCL); baselining, replan vs. rebaseline, EVM schedule metrics (SPI, BEI, CEI, HMI, Earned Schedule, CPLI), and status/progress/forecast reporting. This is NASA's scheduling doctrine grounded in NPR 7120.5 and the GAO Schedule Assessment Guide. Thin on the underlying mechanics of CPM, statistics, and EVM (it points to companion handbooks); aerospace/space-flight-centric; anchored to the 2024 second edition.
The English summary is being prepared. Showing the original description.
Knowledge base from MIL-STD-881F (13 May 2022), DoD Standard Practice for Work Breakdown Structures for Defense Materiel Items. Use for Program/Contract/Subcontract WBS construction, 100% rule and dictionary discipline, commodity appendices A–J, Common Elements (K), sustainment CES reporting (L), Government ST&E (M), and RFP/post-award implementation. Technical planning & WBS and PM/measurement focus—not a cost manual substitute for CAPE policy.
The English summary is being prepared. Showing the original description.
Knowledge base from OMB Circular A-94 (revised 2023-11-09) on guidelines and discount rates for benefit-cost and cost-effectiveness analysis of federal programs. Use for BCA principles, benefit/cost measurement, discount-rate policy, uncertainty/sensitivity, distributional incidence, and decision reporting. Rescoped at build to A-94 only (Army CBA Guide unreachable). Does not replace A-11 budget preparation detail, agency-specific statutory BCA rules, or Army CEAC process templates.
The English summary is being prepared. Showing the original description.