Skip to content
cccskills
FreePublished on GitHub

pm

Inspect and maintain the repository's .pm workstreams, inbox notes, milestones, and tasks. Use when the user asks for PM board status or requests a supported board mutation such as creating, promoting, adding, or completing work.

The English summary is being prepared. Showing the original description.

bex-co/bex574 stars(GitHub 574 + cccskills 0)

Run score Not tested

See how to install

Files included (2)

  • SKILL.md9.5 KB
  • agents/openai.yaml179 B

SKILL.md (original)

Review the instructions the agent will receive before you install.

Task: Arrange the .pm board

/pm is the only skill that writes to .pm/. It arranges milestones and tasks under the conventions below. /pm-brainstorm proposes; /pm materializes. This file is the canonical definition of the board conventions — hierarchy, sizing rule, quality gate, standing closing tasks, templates. /pm-brainstorm reads it at runtime and must not restate or diverge from it. Parse the subcommand from $ARGUMENTS (default = status).

The .pm hierarchy

LevelPathMeaningEffort
WorkstreamwN/ (w1, w2, w3, …)a general-purpose worker queue; README.md + inbox notes—
Inbox notewN/NNN.md (w1/005.md)one idea or a sub-hour unit of work, plain markdown≤ ~1h
MilestonewN/mN/ (m1, m2, …)a shippable chunk: README.md + task files> ~1h, multiple tasks
TaskwN/mN/tNNN.mda single unittens of minutes

Rules (enforce every time)

  • Respect the anti-goals. Read .pm/DO_NOT_DO.md before proposing or materializing work. Do not create milestones/tasks that conflict with it.

  • Workers are general-purpose. Every wN may take work anywhere in the bex project. Workstream placement records scheduling and history, not a permanent mission, specialty, component boundary, or ownership claim. Do not assign themes or missions to workstreams, and do not use prior milestones to reject otherwise appropriate work.

  • Sizing rule. A milestone must be > ~1 hour of work across more than one task. If a chunk is ≤ ~1h (tens of minutes, a task or two), do NOT create an mN/ directory — record it as a loose inbox note wN/NNN.md. Tasks take tens of minutes; milestones take hours.

  • IDs must match the path. A task's id: wN/mN/tNNN frontmatter must equal the directory it lives in. Never create a milestone dir whose path disagrees with the IDs inside it; if you find existing drift, flag and repair it.

  • Keep status in sync across all three places it lives: the workstream README.md milestone checkbox, the milestone README.md **Status:** line + the — DONE marker in the task table, and each task's status: frontmatter.

  • Numbering: next free zero-padded 3-digit for inbox notes (NNN) and tasks (tNNN); next free wN / mN. Scan the tree first; don't reuse a number.

  • Use worker: worker1 unless the workstream README names another worker.

  • Milestones must be meaningful. Every milestone must include direct project-goal linkage, an observable expected outcome, and why this work matters now (dependency/risk/sequence rationale).

  • Every board item briefly explains why. Milestones carry it in the milestone README.md (## Source + Goal linkage). Single tasks — inbox notes wN/NNN.md — carry it in the note itself: a one-line Why: … directly under the title (a sentence on the motivation/payoff is enough).

  • Every milestone ends with standing closing tasks, appended after the implementation tasks whenever a milestone is materialized:

    1. Render parity — only when the milestone is feature development or a fix that touches a user/tenant-facing surface. Check that the change is consistent across every surface it exposes: REST, GraphQL, and MCP in lego/backend/ (same fields, semantics, error shapes — bex-api is meant to be Render-compatible, see docs/ADR006-bex-api.md) and the dashboard/ UI (dashboard/AGENTS.md). Compare against the equivalent render.com behavior/API and flag any drift as follow-up work rather than silently diverging. Omit this task only for milestones with no REST/GraphQL/MCP/UI surface change (pure infra, operator-internal mechanism, docs, etc.) — note why it was omitted in the milestone's ## Source + Goal linkage.
    2. Simplify — run /simplify over the code this milestone changed (reuse / simplification / efficiency; behavior-preserving).
    3. Test coverage — add meaningful tests for the behavior this milestone shipped. Tests must assert real behavior and failure modes; never game coverage with trivial, tautological, or snapshot-everything tests.
    4. Closeout — the final task, added last. When the milestone's other tasks are all complete and its definition of done is actually met, close the milestone: set every remaining task's status: done, move each tNNN.md to wN/mN/done/, mark every row — **DONE** and set **Status:** done in the milestone README.md, move the whole wN/mN/ directory to wN/done/mN/, and check - [x] in the workstream README.md. Completing this task is the move — running /pm done <wN/mN/tNNN> on it last triggers the milestone move (the done subcommand's step 4). Do not run it until the DoD holds: a milestone lands in done/ when its observable end state is real, not merely when the code is written.

    Each depends_on the last implementation task(s) (Simplify and Test coverage depend on Render parity when it's present; Closeout depends on Test coverage) and all count toward the (N tasks) total. add-task inserts new work before these (before Closeout) and updates their depends_on.

  • After editing any .md, run npx prettier@3.4.2 --write "**/*.md" (repo rule).

Subcommands

status (default)

Read the tree (find .pm -type f -name '*.md', skipping done/) and .pm/DO_NOT_DO.md. Print, per open workstream: its milestones with **Status:**, and the next actionable task per milestone — the first non-done task whose depends_on are all satisfied. Also list open inbox notes. Then run a lightweight validation pass and flag:

  • items conflicting with .pm/DO_NOT_DO.md,
  • milestones missing ## Source + Goal linkage,
  • milestones whose definition of done is vague/non-testable,
  • inbox notes missing a Why: line.

Touch no files.

new workstream

Create the next free wN/ with a role-neutral README.md from the workstream template below.

add <wN> <idea…>

Create the next free inbox note wN/NNN.md with the idea as plain terse markdown (no frontmatter), with a one-line Why: … directly under the title. This is the default home for sub-hour work.

promote <wN/NNN> / new milestone <wN> <title>

Apply the sizing rule first.

  • If the work is > ~1h and splits into more than one task: create wN/mN/ with README.md (milestone template) + one tNNN.md per task (task template) + the standing closing tasks (Render parity when it's feature dev/a fix touching REST/GraphQL/MCP/UI, then Simplify, then Test coverage, then Closeout), add the - [ ] **mN** — … line to the workstream README.md, and fill ## Source + Goal linkage with source + goal linkage + expected outcome + why-now rationale (note there why Render parity was included or omitted).
  • If it is ≤ ~1h: do NOT create a milestone. Keep/append it as an inbox note wN/NNN.md (with its one-line Why: …) and tell the user why (too small for a milestone).

add-task <wN/mN> <title>

Create the next tNNN.md from the task template and add its row to the milestone README.md table before the standing closing tasks, updating their depends_on to include it. Update the (N tasks) count in the workstream README.

done <wN/mN/tNNN>

  1. Set the task's frontmatter status: done.
  2. In the milestone README.md: mark the row — **DONE** and update the **Status:** line (e.g. todo (t001 done)).
  3. Move the file to wN/mN/done/tNNN.md.
  4. If no open tasks remain in the milestone, move the whole milestone to wN/done/mN/ and check its box (- [x]) in the workstream README.md.

Show the intended moves before mutating if the user passed DRY_RUN=1.

Templates

Workstream README.md

# wN — project workstream (<worker>)

**Worker:** <worker>. This is a general-purpose bex workstream. It may take work anywhere in the project; the milestones below are scheduled work and historical records, not a permanent purpose, specialty, or ownership boundary.

## Milestones

- [ ] **mN** — <title> (<N> tasks) ← from <source>

Milestone README.md

# wN · mN — <name>

**Worker:** <worker> **Goal:** <what shipping this achieves> **Status:** todo

## Tasks (in order)

| id   | title   | est | depends_on |
| ---- | ------- | --- | ---------- |
| t001 | <title> | 30m | —          |

## Definition of done

<observable, testable end state>

## Source + Goal linkage

- **Source:** <pointer to the inbox note / brainstorm / docs this came from>
- **Goal linkage:** <which project goal / pillar this advances>
- **Expected outcome:** <observable impact after shipping>
- **Why now:** <dependency / risk / sequence rationale>

Task tNNN.md

---
id: wN/mN/tNNN
title: <title>
worker: <worker>
status: todo
estimate: 30m
depends_on: [wN/mN/tMMM]
---

## Objective

<one paragraph>

## Context

- <concrete paths / k8s resources / facts>

## Steps

1. <step>

## Files

- <paths to touch>

## Acceptance criteria

- [ ] <testable check>

## Out of scope

- <deferred adjacent work>

Inbox note wN/NNN.md

Plain terse markdown, no frontmatter — one idea or a sub-hour unit of work. Opens with, directly under the title:

Why: <one sentence — motivation / payoff>

Arguments

$ARGUMENTS

Reviews

No reviews yet. Tell others what you thought.

Comments

No login needed. Share how it worked for you, ask a question, or note where it did not run.

No comments yet. Be the first to write one.

Comments are published right away. Do not include personal information such as email addresses or phone numbers. Up to 2 URLs.

0 / 1,000 characters

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

More skills from this repository

Deploy a bex App to the current Kubernetes cluster and verify it reaches Ready. Use when the user asks to deploy a render.yaml (or legacy bex.yml) or the sample app and validate the rollout end to end. Optional argument: path to render.yaml.

The English summary is being prepared. Showing the original description.

bex-co/bex574Updated Oct 26, 2026

Deploy a local checkout to a production Hetzner App using the manual image-import runbook. Use when the user asks to ship local working-tree code to a live bex App rather than deploy from remote Git. Arguments are the local repo path and app name.

The English summary is being prepared. Showing the original description.

bex-co/bex574Updated Oct 26, 2026

loopx

Free

Autonomously drain a `.pm` workstream — triage every open item (milestone or inbox-note task), then work it to done, park it in `blocked/`, or delete it as invalid, until the workstream has no open items left. Use when the user asks to "loop", drain, or clear a whole workstream's backlog (e.g. `/loopx w1`). Sequential, not interval-based; for a timed poll use /loop.

The English summary is being prepared. Showing the original description.

bex-co/bex574Updated Oct 26, 2026

Create concise, syntax-verified Mermaid architecture diagrams. Use when the user asks to diagram a repository component, document, system, dependency flow, or supplied description in Mermaid.

The English summary is being prepared. Showing the original description.

bex-co/bex574Updated Oct 26, 2026

Stand up or scale the local CAPD mock cluster and deploy the bex operator into it. Use when the user asks to create, inspect, or resize the repository's local development cluster. Optional argument: scale N.

The English summary is being prepared. Showing the original description.

bex-co/bex574Updated Oct 26, 2026

Analyze and decompose a product topic into a text-only proposal for the repository's .pm board. Use when the user wants to pressure-test scope, size milestones, identify dependencies, or prepare exact PM board commands without writing board files.

The English summary is being prepared. Showing the original description.

bex-co/bex574Updated Oct 26, 2026

See all skills by bex-co

Report a problem with this skill