Skip to content
cccskills
FreePublished on GitHub

schedule-extractor

Extract tabular schedule data from construction drawings — door, window, finish, fixture, panel schedules — and output to Excel. Triggers: 'door schedule', 'extract schedule', 'schedule to Excel', 'panel schedule'.

The English summary is being prepared. Showing the original description.

Works withExcel
See how to install

Files included (6)

  • SKILL.md20.8 KB
  • agents/openai.yaml268 B
  • scripts/agentcm_schedule.py9.4 KB
  • scripts/schedule_to_xlsx.py7.6 KB
  • scripts/shared.py554 B
  • scripts/xlsx_to_changeset.py12.6 KB

SKILL.md (original)

Review the instructions the agent will receive before you install.

Schedule Extractor

Extracts tabular schedule data embedded in drawing sheets or spec pages and outputs structured Excel files. Schedules are typically one element among many on a sheet — or the entire sheet may be a schedule.

First: the mode (both workflows)

Before extracting or reconciling, read .construction/project.yaml. Present and readable means AgentCM mode: note its contract_version and follow ${CLAUDE_PLUGIN_ROOT}/reference/agentcm-mode.md. Absent means flat-file mode. A listing that shows the file, or .construction/database.yaml alone, does not decide it: read the file.

Workflow

Extraction Progress:
- [ ] Step 1: Discover schedule locations
- [ ] Step 2: Isolate (crop) the schedule region
- [ ] Step 3: Extract structured data (pdfplumber + vision)
- [ ] Step 4: Validate and clean data
- [ ] Step 5: Output to Excel
- [ ] Step 6: Ingest to AgentCM (AgentCM mode)
- [ ] Step 7: Write a finding

Step 1: Discover Schedule Locations

Use a multi-source discovery approach, checking all available sources:

Source A — Sheet titles in sheet index (primary, most reliable)

Search .construction/index/sheet_index.yaml (or the sheet index you've built) for sheets with "SCHEDULE" in the title. Many important schedules occupy an entire sheet — the sheet title tells you exactly what it is:

  • "DOOR SCHEDULE" → entire sheet is a door schedule
  • "FINISH SCHEDULE" or "ROOM FINISH SCHEDULE" → entire sheet is finishes
  • "WINDOW SCHEDULE" → entire sheet is windows
  • "PANEL SCHEDULE" → electrical panel schedule
  • "FIXTURE SCHEDULE" → plumbing fixtures

For dedicated schedule sheets, the entire page is the extraction target — no need to crop.

Source B — AgentCM's tables (AgentCM mode)

In AgentCM mode (.construction/project.yaml exists; follow ${CLAUDE_PLUGIN_ROOT}/reference/agentcm-mode.md), .construction/INDEX.md's Schedules and legends table lists every table AgentCM found, each in its own .construction/schedules/<sheet>-<n>.tsv. The file's comment line gives the table's box on the sheet (x y w h, 0 to 1 from the top left) and, for a schedule already ingested, its schedule_id (none for a table read from the sheet's text alone). For embedded schedules on non-schedule sheets, that box is where to look: sh .construction/crop.sh <sheet> <x> <y> <w> <h>.

Note: A table read from the text is AgentCM's reading, and its box an estimate: treat both as leads, not definitive boundaries. Always verify with vision.

Source C — Discipline-based heuristics

Schedules appear on specific sheet types:

  • Door schedule → typically on A-0.XX or A-8.XX sheets, or a dedicated sheet
  • Window schedule → same sheets as door schedule, or separate
  • Room finish schedule → A-0.XX or interior sheets
  • Panel schedule → E-X.XX electrical sheets
  • Fixture schedule → P-X.XX plumbing sheets
  • Equipment schedule → M-X.XX mechanical sheets

Source D — Vision scan (fallback)

If no index or graph is available:

"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_PLUGIN_ROOT}/scripts/pdf/rasterize_page.py" "{pdf_path}" {page} --dpi 150 --output ".construction/skills/schedule-extractor/pages/full_sheet.png"

Use vision on the full sheet image: "Identify any tabular schedules on this drawing sheet. Report the approximate bounding box (top-left x,y and bottom-right x,y) as fractions of the image width and height between 0 and 1, the schedule type, and the column headers visible."

Step 2: Isolate the Schedule Region

For dedicated schedule sheets (entire page is a schedule): Skip cropping — use the full page.

For embedded schedules (schedule is one element on a larger sheet):

Crop the identified region with padding. The box is the 0–1 fractions from Step 1, so --normalized is required; without it the script reads the values as pixels and returns an empty crop:

"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_PLUGIN_ROOT}/scripts/pdf/crop_region.py" ".construction/skills/schedule-extractor/pages/full_sheet.png" \
  --box {x1},{y1},{x2},{y2} --normalized \
  --padding 20 \
  --output ".construction/skills/schedule-extractor/pages/schedule_crop.png"

Re-rasterize at higher DPI (300) for the cropped region to improve text clarity. rasterize_page.py --crop takes percentages, so multiply each fraction by 100 (0.62,0.08,0.98,0.45 becomes 62,8,98,45):

"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_PLUGIN_ROOT}/scripts/pdf/rasterize_page.py" "{pdf_path}" {page} \
  --dpi 300 \
  --crop {x1_pct},{y1_pct},{x2_pct},{y2_pct} \
  --output ".construction/skills/schedule-extractor/pages/schedule_hires.png"

Step 3: Extract Structured Data

In AgentCM mode — the table AgentCM read

A table INDEX.md lists under Schedules and legends is already read. Turn its file into the exporter's data with the reader, never with a converter of your own:

"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_SKILL_DIR}/scripts/agentcm_schedule.py" ".construction/schedules/<sheet>-<n>.tsv" \
  --type door_schedule --data ".construction/skills/schedule-extractor/<sheet>-<n>.json"

It prints the header row it took and what it left out. A table read from the sheet's text has its title and header rows at the top: when it took the wrong row, give --header-row <y> (the line's position, as the file prints it) and --header-rows <n> for a header on several lines. Then verify the table against the drawing with crop.sh and the box on the file's comment line (Source B). Where the drawing shows a different value, correct that cell in the data JSON with the Edit tool, and record the correction as ${CLAUDE_PLUGIN_ROOT}/reference/agentcm-mode.md says. Methods A to C below are for a table AgentCM did not find.

Otherwise use a try → validate → fallback approach:

Method A — pdfplumber table extraction (try first)

Extract the page's tables with the shared script (its JSON holds text and tables; add --bbox x1,y1,x2,y2 in PDF points to limit it to the schedule region):

"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_PLUGIN_ROOT}/scripts/pdf/extract_text_region.py" "{pdf_path}" {page} --output ".construction/skills/schedule-extractor/tables.json"

If multiple tables are found, select the largest one (most rows with the most columns — schedules are wide). The first row of the selected table contains headers; subsequent rows are data. If no tables are found or results look garbled, fall back to vision (Method B). Do not write pdfplumber code of your own.

Evaluate Method A — Quality Gate

Check these criteria before proceeding:

  1. Row count: Did pdfplumber extract at least 10 data rows? Most schedules have 20-200+ entries.
  2. Column consistency: Do ≥80% of rows have the same number of columns? Inconsistent columns = parsing error.
  3. Non-empty cells: Are >50% of cells non-empty? Mostly-empty extraction = parsing failed.
  4. First column validity: Does the first column contain recognizable IDs (door numbers, room numbers, equipment tags)?

Decision:

  • All 4 checks pass → Method A succeeded, proceed to Step 4
  • Any check fails → Method A failed, use Method B below
QUALITY GATE:
  extracted_rows >= 10?          YES → check next  |  NO → use Method B
  column_consistency >= 80%?     YES → check next  |  NO → use Method B
  non_empty_cells >= 50%?        YES → check next  |  NO → use Method B
  first_col_has_valid_ids?       YES → use Method A |  NO → use Method B

Method B — Vision extraction (fallback)

When pdfplumber fails (common with complex layouts, merged cells, non-standard table lines):

  1. Rasterize the sheet at 150 DPI for overview:
"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_PLUGIN_ROOT}/scripts/pdf/rasterize_page.py" "{pdf_path}" {page} --dpi 150 --output ".construction/skills/schedule-extractor/pages/full_sheet.png"
  1. Use vision on the full sheet image to read the schedule directly:

"This is a construction drawing sheet containing a schedule (tabular data). Extract ALL rows from the schedule as a JSON array of objects. The first row of the table contains column headers — use those as object keys. Each subsequent row is one entry. Preserve exact values including dimensions, abbreviations, and codes. If a cell is empty, use null."

  1. For dense schedules with small text, re-rasterize at 300 DPI and crop to just the schedule region:
"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_PLUGIN_ROOT}/scripts/pdf/rasterize_page.py" "{pdf_path}" {page} --dpi 300 --output ".construction/skills/schedule-extractor/pages/schedule_hires.png"

Method C — Hybrid (for maximum accuracy)

Run both methods and cross-validate:

  • pdfplumber gives exact text positioning and catches every character
  • Vision catches content pdfplumber misses (stamps, handwritten marks, non-standard table layouts)
  • Compare row counts: if they differ by >10%, investigate the discrepancy
  • Use vision results for rows that pdfplumber returned empty or garbled

Step 4: Validate and Clean

After extraction (by either method):

  • Row count check: Compare extracted count against what's visually present. If off by >10%, re-extract using the other method.
  • Column structure: Verify headers match expected schedule type (door schedule has MARK/SIZE/TYPE/FRAME/HARDWARE; finish schedule has RM.NO/NAME/FLOOR/BASE/WALLS/CLG)
  • Merged cell cleanup: Expand merged header cells (e.g., "WALLS" spanning A/B/C/D sub-columns)
  • Normalize dimensions: 3' - 0" → 3'-0" (remove spaces around dashes)
  • Flag revisions: Note any cells within revision clouds or delta markers
  • Cross-reference with AgentCM's identifiers: In AgentCM mode, check each room number and door mark against .construction/tags.tsv (kind room or door; the lines starting with the number and a tab). Not finding one there proves nothing (INDEX.md says when its room list is incomplete): report it as "not in AgentCM's index" and check the plan sheets' .construction/sheets/<sheet>.tsv.

Step 5: Output to Excel

"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_SKILL_DIR}/scripts/schedule_to_xlsx.py" \
  --data ".construction/skills/schedule-extractor/<sheet>-<n>.json" \
  --type door_schedule \
  --project "Project Name" \
  --sheet "A-0.01" \
  --output "Door_Schedule_A-0.01.xlsx"

The data JSON is working data: write it (with the Write tool, or the reader in AgentCM mode) under .construction/skills/schedule-extractor/, never in the project root or a folder of your own. The workbook is the deliverable: write it in the project folder as the command above shows, never under .construction/. For a table AgentCM has already ingested (schedule_id=<id> on its file's comment line), add --schedule-id <id> --sheet-id <the sheet's id> so the workbook can come back through the round trip.

The script creates a formatted Excel workbook with:

  • Header row with project info and source sheet
  • Auto-sized columns
  • Conditional formatting for empty/flagged cells
  • Source metadata in a separate tab

Step 6: Ingest to AgentCM (AgentCM mode)

After Excel output, send the extracted data to AgentCM's schedule ingest, which stores it and links its rows to rooms. The payload (below) goes in .construction/skills/schedule-extractor/outbox/schedules-ingest-<sheet>-<YYYYMMDD-HHMMSS>.json:

  • A table from schedules/ not yet ingested (schedule_id=none): the reader writes it. Run it again with --payload <that path> --sheet-id <id> --row-entity-type <type> --source-method hybrid --confidence <0 to 1> (hybrid: AgentCM's reading, checked by eye with crop.sh), and make any correction from Step 3 in the payload's cell too.
  • A table already ingested (schedule_id=<id>): nothing to ingest. The reader refuses, and the PE edits come back through the round trip below.
  • A table read by Methods A to C: write the payload with the Write tool. sourceMethod is one of pdfplumber, vision, hybrid or manual, and rowEntityType one of the types listed below.

Send it as ${CLAUDE_PLUGIN_ROOT}/reference/agentcm-mode.md says under Writing back; if AgentCM is closed, the payload waits there and the PE is told:

# api_url and project_id from .construction/database.yaml
curl -sS -X POST "{api_url}/projects/{project_id}/schedules/ingest" \
  -H "Content-Type: application/json" \
  -d @".construction/skills/schedule-extractor/outbox/schedules-ingest-<sheet>-<YYYYMMDD-HHMMSS>.json" \
  -w "\nHTTP %{http_code}\n"

The sheet's id. sheetId is the id of the entry in .construction/index/sheet_index.yaml whose sheet_number is the schedule's sheet. Never guess it from the number. If that file is missing, or its entries have no id (an older sheet-splitter wrote a pages: list with filename and page_index), say so and stop: do not ingest. The Excel workbook from Step 5 stands either way.

The ingest payload JSON follows this structure:

{
  "sheetId": "<uuid of the source sheet>",
  "scheduleType": "door",
  "title": "DOOR SCHEDULE",
  "rowEntityType": "door",
  "columns": [
    {"key": "MARK", "header": "MARK"},
    {"key": "WIDTH", "header": "WIDTH"},
    {"key": "HEIGHT", "header": "HEIGHT"},
    {"key": "TYPE", "header": "TYPE"},
    {"key": "FRAME", "header": "FRAME"},
    {"key": "HARDWARE_SET", "header": "HARDWARE SET"},
    {"key": "FIRE_RATING", "header": "FIRE RATING"}
  ],
  "rows": [
    {
      "entityIdentifier": "2.101A",
      "cells": {"MARK": "2.101A", "WIDTH": "3'-0\"", "HEIGHT": "7'-0\"", "TYPE": "A", "FRAME": "HM", "HARDWARE_SET": "HW-3", "FIRE_RATING": "1 HR"}
    }
  ],
  "sourceMethod": "pdfplumber",
  "confidence": 0.95
}

Schedule types and their rowEntityType:

  • Door schedule → "door" (room derived from door number: "2.101A" → Room 2.101)
  • Window schedule → "window" (room derived from window mark)
  • Finish schedule → "room" (entity identifier IS the room number)
  • Panel schedule → "equipment"
  • Fixture schedule → "fixture" (room linked spatially from plan tags)

The ingest endpoint automatically:

  1. Creates/updates the schedule record
  2. Inserts all rows with GIN-indexed jsonb cells
  3. Links rows to rooms (exact match, fuzzy match, or creates rooms from schedule data)
  4. Extracts finish/hardware codes into the code legends table
  5. Creates pending links for fixtures/equipment that need spatial resolution

Step 7: Write a Finding

In both modes, record the extraction in .construction/skills/schedule-extractor/findings/:

"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_PLUGIN_ROOT}/scripts/graph/write_finding.py" \
  --skill "schedule-extractor" --type "schedule_extracted" \
  --title "Door schedule extracted from A-0.01" \
  --source-sheet "A-0.01" \
  --output-file "Door_Schedule_A-0.01.xlsx" \
  --data '{"schedule_type": "door", "row_count": 45, "columns": ["MARK","SIZE","TYPE","FRAME","HARDWARE SET"]}'

Schedule Reconciliation (Excel → DB Round-Trip)

When a PE edits an exported Excel schedule and wants changes applied back to AgentCM:

Reconciliation Workflow

Reconciliation Progress:
- [ ] Step R1: Read metadata from edited Excel
- [ ] Step R2: Compute changeset (diff vs DB)
- [ ] Step R3: POST changeset to reconcile endpoint
- [ ] Step R4: Report summary to user

Step R1: Read Metadata from Edited Excel

Exported Excel files contain reconciliation anchors:

  • Hidden _agentcm_meta sheet with schedule_id, schedule_type, sheet_id
  • Hidden _row_key column A with entity identifiers (door numbers, room numbers, etc.)

If the Excel lacks _agentcm_meta, it was not exported by AgentCM — treat as a fresh import (re-run the extraction workflow above).

Step R2: Compute Changeset

Run the diff engine to compare the edited Excel against the rows AgentCM holds:

"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_SKILL_DIR}/scripts/xlsx_to_changeset.py" \
  --excel "edited_schedule.xlsx" \
  --output ".construction/skills/schedule-extractor/outbox/schedules-reconcile-<sheet>-<YYYYMMDD-HHMMSS>.json"

The script:

  1. Reads _agentcm_meta → extracts schedule_id. A table never ingested (schedule_id=none) has nothing to reconcile and is refused: ingest it first (Step 6)
  2. Reads data sheet → extracts _row_key column + all data columns
  3. Reads the schedule's stored rows from AgentCM, GET {api_url}/projects/{project_id}/schedules/{schedule_id}/rows, with project_id and api_url from .construction/database.yaml (nothing else in it)
  4. Computes diff: cell changes, new rows, deleted rows, new columns, hidden columns
  5. Outputs a structured JSON changeset, with sourceFile the edited Excel's name

It needs AgentCM running. If AgentCM does not answer, the script exits 3 and computes nothing: tell the PE to start AgentCM and rerun this step (the edited Excel is all it needs).

Step R3: POST Changeset to Reconcile Endpoint

Send the changeset R2 wrote to the outbox, as ${CLAUDE_PLUGIN_ROOT}/reference/agentcm-mode.md says under Writing back:

# api_url and project_id from .construction/database.yaml
curl -sS -X POST "{api_url}/projects/{project_id}/schedules/reconcile" \
  -H "Content-Type: application/json" \
  -d @".construction/skills/schedule-extractor/outbox/schedules-reconcile-<sheet>-<YYYYMMDD-HHMMSS>.json" \
  -w "\nHTTP %{http_code}\n"

The reconcile endpoint applies changes with:

  • Override protection: All user edits set isUserOverride=TRUE — future re-extractions will not overwrite them
  • Audit trail: Every cell edit, row add/delete, and column change is logged to schedule_change_log
  • Conflict detection: If a re-extraction later disagrees with a user override, a conflict is created (not silently overwritten)

Step R4: Report Summary

The endpoint returns an ExcelReconcileResult:

{
  "rowsUpdated": 3,
  "rowsAdded": 1,
  "rowsSoftDeleted": 0,
  "cellsChanged": 7,
  "conflictsCreated": 0,
  "columnsAdded": 0,
  "columnsHidden": 0,
  "errors": []
}

Report the summary to the user. If errors is non-empty, surface those for review.

Anchored Excel Export

When exporting schedules for PE review, always include reconciliation anchors:

"${CLAUDE_PLUGIN_ROOT}/bin/construction-python" "${CLAUDE_SKILL_DIR}/scripts/schedule_to_xlsx.py" \
  --data schedule_data.json \
  --type door_schedule \
  --project "Project Name" \
  --sheet "A-0.01" \
  --schedule-id "{schedule_uuid}" \
  --sheet-id "{sheet_uuid}" \
  --output "Door_Schedule_A-0.01.xlsx"

The --schedule-id and --sheet-id flags embed metadata in the hidden _agentcm_meta sheet, enabling the round-trip reconciliation workflow.

Schedule Type Reference

TypeCommon columnsNotes
DoorMark, Width, Height, Type, Frame, Hardware Set, Fire RatingCross-ref hardware sets with spec 08 71 00
WindowMark, Width, Height, Type, Glazing, Frame MaterialCheck for energy code compliance
Room FinishRoom #, Name, Floor, Base, North/South/East/West Walls, CeilingFinish codes defined in legend
PanelCircuit #, Description, Load (VA), Breaker Size, PhaseVerify total load vs panel capacity
Fixture (Plumbing)Mark, Description, Manufacturer, Model, ConnectionCross-ref with spec Division 22
Equipment (HVAC)Tag, Description, CFM/BTU, Voltage, WeightCross-ref with spec Division 23

File Safety

Never overwrite an existing schedule extraction. The export script uses safe_output_path() which appends _v2, _v3, etc. automatically.


Allowed Scripts

Allowed scripts — exhaustive list. Only execute these scripts during this skill:

  • ${CLAUDE_PLUGIN_ROOT}/scripts/pdf/extract_text_region.py — Method A table extraction (pdfplumber)
  • ${CLAUDE_PLUGIN_ROOT}/scripts/pdf/rasterize_page.py — rasterize PDF pages for vision extraction
  • ${CLAUDE_PLUGIN_ROOT}/scripts/pdf/crop_region.py — crop schedule region from full sheet image
  • scripts/agentcm_schedule.py — AgentCM mode: a table from .construction/schedules/ to the exporter's data and, for one not yet ingested, the ingest payload (Steps 3 and 6)
  • scripts/schedule_to_xlsx.py — Excel export with reconciliation anchors
  • scripts/xlsx_to_changeset.py — diff the edited Excel against AgentCM's stored rows (its rows endpoint) for reconciliation
  • ${CLAUDE_PLUGIN_ROOT}/scripts/graph/write_finding.py — record the extraction as a finding (Step 7)
  • ${CLAUDE_PLUGIN_ROOT}/scripts/corrections_append.py — AgentCM mode: record a correction of AgentCM's data (reference/agentcm-mode.md)

Reviews

No reviews yet. Tell others what you thought.

Comments

No login needed. Share how it worked for you, ask a question, or note where it did not run.

No comments yet. Be the first to write one.

Comments are published right away. Do not include personal information such as email addresses or phone numbers. Up to 2 URLs.

0 / 1,000 characters

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

More skills from this repository

Evaluate tabulated subcontractor bids against specs and drawings — scope gap analysis, exclusion risk scoring, award recommendation. Triggers: 'evaluate bids', 'bid evaluation', 'lowest responsible bidder'.

The English summary is being prepared. Showing the original description.

dleerdefi/claude-code-construction43Updated Oct 18, 2026

Extract data from subcontractor bid PDFs and produce a comparison spreadsheet. Feeds into /bid-evaluator. Triggers: 'tabulate bids', 'bid comparison', 'compare bids', 'buyout analysis', 'bid tab'.

The English summary is being prepared. Showing the original description.

dleerdefi/claude-code-construction43Updated Oct 18, 2026

Researches which building codes, accessibility standards and authority requirements (health department, fire marshal, state agency) apply to a scope or spec section, and which the project documents miss. Use for 'what codes apply', 'code check', 'ADA requirements', 'egress', 'health department'. Not for reading what the drawings or specs say (construction-guide).

The English summary is being prepared. Showing the original description.

dleerdefi/claude-code-construction43Updated Oct 18, 2026

Operating guide for construction project documents — load before reading drawings, specs, schedules, RFIs, submittals or bids. Data-access rules (never read PDFs directly; rasterize first), AgentCM graph-guided vision, drawing and cross-reference conventions, document precedence. Triggers: 'construction project', 'drawings', 'specs', 'sheet', 'RFI', 'submittal'.

The English summary is being prepared. Showing the original description.

dleerdefi/claude-code-construction43Updated Oct 18, 2026

Checks construction drawings and specs for what's missing, cross-trade coordination conflicts and scope gaps, with PE judgment. Use for 'what's missing', 'check coordination', 'scope gap', or researching an RFI before answering it. Not for drafting RFIs (rfi-drafter), code research (code-researcher) or reviewing a submittal package (the user runs /construction:submittal-review).

The English summary is being prepared. Showing the original description.

dleerdefi/claude-code-construction43Updated Oct 18, 2026

Set up a construction project — inventories files, classifies drawings/specs/schedules/registers and appends construction context to CLAUDE.md; in an AgentCM project, prints AgentCM's orientation instead. Triggers: 'set up project', 'construction setup', 'classify documents'.

The English summary is being prepared. Showing the original description.

dleerdefi/claude-code-construction43Updated Oct 18, 2026

See all skills by dleerdefi

Report a problem with this skill