milestone-review

Review a development milestone using sprint reports, feature status, bugs, and risks. Summarize completion, quality, and delivery pace, then recommend whether to proceed, proceed with conditions, or stop, with scope choices and action items.

OriginalShow the original description

Milestone progress review — completeness, quality metrics, risk, go/no-go recommendation. At checkpoints or before a deadline.

See how to install

Good for

  • Reviewing progress before a milestone deadline
  • Identifying blockers and quality risks
  • Choosing features to protect or defer
  • Preparing a go/no-go recommendation and action items

Files included (1)

  • SKILL.md11.0 KB

SKILL.md (original)

Review the instructions the agent will receive before you install.

!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys review_mode,automation,workflow

Resolved above — use as-is; --review overrides review_mode for this run. No block → defaults in .claude/docs/config-resolution.md.

Milestone Review

Insufficient input — check this before producing any report

If the inputs this skill needs do not exist, the answer is "could not run" — not a filled-in report. Check first, and stop if the check fails.

  1. List the inputs this skill reads (data files, prior reports, profiler output, test results, registries, source code).
  2. For each, record FOUND or ABSENT — not "assumed present".
  3. If any input required for a section is ABSENT, that section is NOT ASSESSED — NO DATA. Do not estimate it, do not infer it from an adjacent artifact, and do not leave a mandated cell to be filled by whoever reads the template next.
  4. If every required input is ABSENT, stop and report NOT ASSESSED — NO DATA as the whole verdict, naming what was missing and which skill produces it.

A verdict of NOT ASSESSED is a success. It is the correct, useful answer to "what does the data say?" when there is no data. The failure mode this prevents is specific: a report whose verdict enum has no "could not run" state produces false clean passes — an asset audit returning COMPLIANT on a project with no assets and no standards, or a performance profile reporting ">99% headroom against a 16.67ms budget" with zero profiler data and no budget ever set.

Absence of evidence is never evidence of absence. A scan that finds no matches because there are no files to scan has not verified anything. Say which of the two happened — a reader cannot tell from a green result.


Phase 0: Parse Arguments

Extract the milestone name (current or a specific name).

See .claude/docs/director-gates.md for the full check pattern. Individual gate definitions live in .claude/docs/director-gates/[gate-id].md — the spawned agent reads its own gate file; do not read it in the parent session.

Every AskUserQuestion call follows .claude/docs/automation-modes.md (collaborative asks always · guided major-only · autonomous logs and proceeds; automation_always_ask categories always prompt).


Phase 1: Load Milestone Data

Read the milestone definition from production/milestones/ if it exists. If the argument is current, use the most recently modified milestone file.

No skill writes production/milestones/ — definitions are authored by hand from .claude/docs/templates/milestone-definition.md, so most projects have none. When the directory is absent or empty, say so and review against the sprint reports alone; do not fabricate a definition. Take care with current: this skill writes its own output as [milestone-name]-review.md, so a most-recently-modified match can be a previous review rather than a definition. Skip files ending -review.md when selecting.

Gather the sprint reports for sprints within this milestone from production/sprints/. Establish the denominator (glob them, count N), then scan the sections a milestone review actually aggregates rather than reading each report whole:

Grep pattern="^## (Sprint Goal|Capacity|Tasks|Carryover|Risks|Progress|Burndown Assessment|Emerging Risks|Definition of Done)" glob="production/sprints/sprint-*.md" output_mode="content" -A 12

These alternates are copied from /sprint-plan's emitted headings — keep them in sync with it, not with what a milestone review wishes existed. The previous pattern asked for Summary|Goal|Velocity|Completed|Blockers| Retrospective, none of which /sprint-plan writes (it emits ## Sprint Goal, not ## Goal). Only Carryover matched — and that was the trap: a non-zero match count meant the zero-match escape hatch below could never fire, so every milestone review silently aggregated carryover tables and nothing else while reporting full coverage.

Full-read a single sprint report when its scanned sections point outside themselves, or when it matched nothing — a zero-match report predates the template and must be read, never silently dropped from the milestone's history. Report any sprint that contributed nothing: a milestone summary that quietly omits a sprint understates the work and the slippage both.

Blocked stories — the Blocked table and the blocked story count passed to PR-MILESTONE — are not in the sprint reports' scanned sections. Read them where they are recorded: the status: blocked stories in production/sprint-status.yaml (with their blocker field) and, for stories outside that sprint, one grep:

Grep pattern="^> \*\*Status\*\*: Blocked|BLOCKED:" glob="production/epics/**/story-*.md" output_mode="content"

Each blocked story goes in the Blocked table under the feature its epic folder implements, with its blocker (the yaml blocker field or the story's BLOCKED: note). With no story files and no sprint-status.yaml, the Blocked table and the blocked story count are NOT ASSESSED — NO DATA, not zero.


Phase 2: Scan Codebase Health

  • Scan for TODO, FIXME, HACK markers that indicate incomplete work
  • Count open bugs by severity for Quality Metrics from production/qa/bugs/ (one grep of the **Severity** and **Status** lines, as /bug-triage does); with no bug files, the bug lines are NOT ASSESSED — NO DATA, not zero
  • Check the risk register at production/risk-register/ if it exists (hand-authored from .claude/docs/templates/risk-register-entry.md; no skill writes it, so absence is normal — note it rather than skipping risk assessment silently)

Phase 3: Generate the Milestone Review

# Milestone Review: [Milestone Name]

## Overview
- **Target Date**: [Date]
- **Current Date**: [Today]
- **Days Remaining**: [N]
- **Sprints Completed**: [X/Y]

## Feature Completeness

### Fully Complete
Only a feature whose Status is `Complete` goes here or counts toward the completion percentage; a Deferred feature stays in its denominator, named with the milestone it moved to.

| Feature | Acceptance Criteria | Test Status |
|---------|-------------------|-------------|

### Partially Complete
| Feature | % Done | Remaining Work | Risk to Milestone |
|---------|--------|---------------|------------------|

### Blocked
A started feature whose stories are Blocked goes here, not under Partially
Complete — name the blocker, so the review says why it stalled, not only that
the count moved.

| Feature | Blocked Stories | Blocker | Next Action / Owner |
|---------|----------------|---------|---------------------|

### Not Started
| Feature | Priority | Can Cut? | Impact of Cutting |
|---------|----------|----------|------------------|

## Quality Metrics
- **Open S1 Bugs**: [N] -- [List]
- **Open S2 Bugs**: [N]
- **Open S3 Bugs**: [N]
- **Test Coverage**: [X%]
- **Performance**: [Within budget? Details]

## Code Health
- **TODO count**: [N across codebase]
- **FIXME count**: [N]
- **HACK count**: [N]
- **Technical debt items**: [List critical ones]

## Risk Assessment
| Risk | Status | Impact if Realized | Mitigation Status |
|------|--------|-------------------|------------------|

## Velocity Analysis
- **Planned vs Completed** (across all sprints): [X/Y tasks = Z%]
- **Trend**: [Improving / Stable / Declining]
- **Adjusted estimate for remaining work**: [Days needed at current velocity]

## Scope Recommendations
### Protect (Must ship with milestone)
- [Feature and why]

### At Risk (May need to cut or simplify)
- [Feature and risk]

### Cut Candidates (Can defer without compromising milestone)
- [Feature and impact of cutting]

## Go/No-Go Assessment

**Recommendation**: [NOT ASSESSED / GO / CONDITIONAL GO / NO-GO]

**Conditions** (if conditional):
- [Condition 1 that must be met]
- [Condition 2 that must be met]

**Rationale**: [Explanation of the recommendation]

## Action Items
| # | Action | Owner | Deadline |
|---|--------|-------|----------|

Phase 3b: Producer Risk Assessment

Review mode check — apply before spawning PR-MILESTONE:

  • solo → skip. Note: "PR-MILESTONE skipped — Solo mode." Present the Go/No-Go section without a producer verdict.
  • lean → skip (not a PHASE-GATE). Note: "PR-MILESTONE skipped — Lean mode." Present the Go/No-Go section without a producer verdict.
  • full → spawn as normal.

Before generating the Go/No-Go recommendation, spawn producer via Agent using gate PR-MILESTONE (.claude/docs/director-gates/pr-milestone.md).

Pass: milestone name and target date, current completion percentage, blocked story count, velocity data from sprint reports (if available), list of cut candidates.

Present the producer's assessment inline within the Go/No-Go section. The producer's verdict (ON TRACK / AT RISK / OFF TRACK) informs the overall recommendation.

If OFF TRACK, use AskUserQuestion before generating the recommendation:

  • Prompt: "Producer verdict: OFF TRACK. The milestone is in jeopardy. This review will recommend NO-GO. How do you want to proceed?"
  • Options:
    • [A] Accept NO-GO — generate the full review with that recommendation
    • [B] Override to CONDITIONAL GO — I'll document the accepted risks myself
    • [C] Stop — I want to address blockers before generating the review

If AT RISK, use AskUserQuestion:

  • Prompt: "Producer verdict: AT RISK. Milestone may slip. How should the Go/No-Go section be framed?"
  • Options:
    • [A] CONDITIONAL GO — include producer's conditions in the review
    • [B] NO-GO — conditions cannot be met in time
    • [C] GO — I accept the risk and want to proceed

If NOT ASSESSED: name the missing input — it is not ON TRACK, and never recommend GO on it. Supply the input and re-run PR-MILESTONE, or recommend NOT ASSESSED — or CONDITIONAL GO / NO-GO where the review's own findings call for one (the rank in .claude/docs/director-gates.md).

Do not issue a GO against an OFF TRACK verdict; issue CONDITIONAL GO only if the user explicitly selects [B] above.


Phase 4: Save Review

Present the review to the user.

Ask: "May I write this to production/milestones/[milestone-name]-review.md?"

If yes, write the file, creating the directory if needed. Verdict: COMPLETE — milestone review saved.

If no, stop here. Verdict: BLOCKED — user declined write.


Phase 5: Next Steps

  • Run /gate-check for a formal phase gate verdict if this milestone marks a development phase boundary.
  • Run /sprint-plan to adjust the next sprint based on the scope recommendations above (at workflow: minimal, which has no sprints, adjust the brief's build order instead).

Reviews

No reviews yet. Tell others what you thought.

Comments

No login needed. Share how it worked for you, ask a question, or note where it did not run.

No comments yet. Be the first to write one.

Comments are published right away. Do not include personal information such as email addresses or phone numbers. Up to 2 URLs.

0 / 1,000 characters

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

More skills from this repository

adopt

FreeSummary

Audit an existing project's design documents and supporting files to check whether their formats work with the template's skills. Get a numbered migration plan that prioritizes gaps and required changes, rather than simply listing what exists.

  • Checking existing documents before adopting a project template
  • Auditing game design documents or architecture decision records
  • Prioritizing gaps in project tracking and configuration files
Donchitos/Claude-Code-Game-Studios26.9KUpdated Oct 8, 2026

Document a technical decision in an architecture decision record, or ADR. Capture its context, alternatives, and consequences, assign a record number, and distinguish a proposed decision from an accepted one so dependent work reflects its actual status.

  • Recording the reasons behind a technical choice
  • Documenting alternatives and consequences of a design decision
  • Creating numbered records alongside existing architecture decisions
Donchitos/Claude-Code-Game-Studios26.9KUpdated Oct 8, 2026

Review whether game design requirements are covered by documented architecture decisions. Identify missing coverage, conflicting decisions, and engine compatibility concerns, with an optional matrix linking requirements to development stories and tests.

  • Find game requirements without architecture decisions
  • Check for conflicts between architecture decisions
  • Review compatibility with the pinned engine version
Donchitos/Claude-Code-Game-Studios26.9KUpdated Oct 8, 2026

art-bible

FreeSummary

Create a game's art direction document, defining its visual rules, mood, shapes, colors, and production standards. Review and approve sections individually, with guidance that connects character, environment, and interface design to the game's concept and technical constraints.

  • Defining a game's core visual identity before asset production
  • Documenting character, environment, and interface design rules
  • Aligning asset standards with engine and performance limits
Donchitos/Claude-Code-Game-Studios26.9KUpdated Oct 8, 2026

asset-audit

FreeSummary

Audit game asset files for naming rules, size limits, formats, and broken references. Receive a report of measured violations and suggested fixes, with clear explanations of checks that lack data or cannot be assessed for the engine.

  • Checking image and audio naming conventions
  • Finding files that exceed asset size limits
  • Investigating missing references and potentially unused assets
Donchitos/Claude-Code-Game-Studios26.9KUpdated Oct 8, 2026

asset-spec

FreeSummary

Turn game design documents and character profiles into asset specifications and image generation prompts. Define appearance, dimensions, file formats, and naming rules, then maintain an asset list that tracks progress and identifies shared assets.

  • List the visual assets needed for a game
  • Define consistent character and environment asset specifications
  • Prepare image generation prompts from an art direction guide
Donchitos/Claude-Code-Game-Studios26.9KUpdated Oct 8, 2026