Skip to content
cccskills
FreePublished on GitHub

editorial-calendar

When shaping cadence — evergreen / campaign / reactive split, beat-mapping across channel stages, content-debt management. Triggers on 'plan our content cadence', 'what should we publish'.

The English summary is being prepared. Showing the original description.

See how to install

Files included (3)

  • SKILL.md8.2 KB
  • evals/domain-truth.json1.0 KB
  • evals/evals.json747 B

SKILL.md (original)

Review the instructions the agent will receive before you install.

editorial-calendar

When to use

  • A content programme is producing assets in bursts (campaign-shaped only) and the cadence is brittle the quarter the campaign rests.
  • The team owes more drafts than it can ship and the backlog is functioning as content-debt rather than queue — surface and prioritise.
  • A new audience-by-message matrix exists and the team needs to translate it into a repeating cadence with beat-mapping across channel stages.

Do NOT use to draft the asset itself (downstream), pick channel- specific tactics like ad creative or email subject lines (out of scope — channel-agnostic skill), or sequence a one-off launch wave (route to gtm-launch).

Cognition cluster

  • Mental model 3 — Pareto principle (80/20). Roughly 20 % of the editorial beats produce 80 % of the audience pull. The calendar is the discipline of doubling down on the 20 % and letting the 80 % be reactive, not core. See docs/contracts/mental-models.md § 3.
  • Mental model 18 — Pull vs. push systems. Evergreen content is a pull system (the audience finds it); campaigns are a push system (we time the arrival). The calendar separates the two so campaign collapse does not collapse pull. See mental-models.md § 18.
  • Context-spine — product + customer-segment + channel-stage + funnel-stage. Read product for what is shippable as proof, customer-segment for who reads which beat, channel-stage for where the audience is in the awareness arc, and funnel-stage for whether a beat is top-of-funnel reach or mid-funnel proof. See context-spine.

Procedure

Step 0: Inherit the message stack and audience matrix

Identify the locked primary-message.md, supporting-proofs.md, and audience-matrix.md from messaging-architecture. The editorial calendar is a cadence translation of the matrix; without the matrix it is content-as-impulse, not content-as-system.

Step 1: Analyze the inherited cadence

Review existing surfaces: what has the team published in the last two quarters, what is its evergreen pull (organic traffic over time), and what was campaign-only (a single spike and decay). The output is two lists: load-bearing evergreen and campaign artefacts that have already paid back. Everything else is content debt — name it explicitly.

Step 2: Classify each beat — evergreen · campaign · reactive

Three buckets, never collapsed:

  • Evergreen. Beats that map to a load-bearing proof and a durable audience question. Authored once, refreshed quarterly. Pull system.
  • Campaign. Beats keyed to a wave (launch, event, season). Authored to a date. Push system. Decommissioned by name when the wave closes.
  • Reactive. Beats keyed to a market or competitor event. No pre-allocated slot; the calendar reserves capacity, not a topic.

Step 3: Beat-map across channel-stage × funnel-stage

For each audience in the matrix, plot one evergreen beat per (channel-stage, funnel-stage) cell that the audience actually lives in. Empty cells are explicit gaps; they do not auto-fill. Beats per cell beyond one are content noise, not coverage.

Step 4: Validate against the Pareto cut and the pull-vs-push line

Validate the calendar on three checks:

  1. Pareto cut. Identify the 20 % of beats that, if dropped, would visibly shrink audience pull. Verify exactly that 20 % has the highest authoring investment. If high investment is going into the 80 %, the calendar is upside-down — rebalance.
  2. Pull-vs-push separation. Confirm campaign collapse does not collapse evergreen — evergreen surfaces are not on the campaign author's critical path.
  3. Reactive capacity. Confirm reactive slots reserve hours, not topics. A reactive slot with a pre-decided topic is a campaign in disguise.

Step 5: Manage content debt explicitly

Inventory the debt list from Step 1. For each item: repay (refresh and republish), archive (remove from indexed surfaces), or retire (delete). Untouched debt compounds — it is not free to leave on the shelf.

Step 6: Hand back

Hand the artefacts to content-funnel-design for funnel-stage-to-shape mapping, and to release-comms when campaign waves land near a launch wave from gtm-launch.

Related Skills

WHEN to use this

  • The unit of work is the cadence (which beats repeat at which frequency on which surface), not a single asset.
  • A team is over-investing in campaigns and under-investing in evergreen pull.
  • A content-debt list is silently growing and needs explicit repay / archive / retire decisions.

WHEN NOT to use this

  • Mapping each funnel stage to a content shape (deep-dive, comparison, demo) — route to content-funnel-design.
  • Drafting voice attributes or tone-by-context matrix — route to voice-and-tone-design.
  • Sequencing a launch wave with gates and beats — route to gtm-launch.
  • Authoring the asset copy — out of scope here (downstream).

When the agent should load this

  • "Build us an editorial calendar for the next two quarters."
  • "Wir produzieren zu viele Kampagnen-Artefakte — wo ist die Evergreen-Linie?"
  • "Beat-map the cadence against the audience matrix."
  • "What is our content-debt list and what do we repay first?"
  • "Reactive capacity is full of pre-planned topics — fix the calendar."

Output

  1. cadence-classification.md — every active beat tagged evergreen · campaign · reactive · debt, with the Pareto-cut ranking inside the evergreen bucket.
  2. beat-map.md — audience × channel-stage × funnel-stage grid with one evergreen beat per occupied cell, empty cells explicitly named as gaps.
  3. content-debt-ledger.md — every debt item with a repay, archive, or retire decision and the date it lapses.

Gotcha

  • "We are evergreen-first" is the most common self-description and almost never true on the calendar — verify by authoring investment, not intent.
  • Reactive capacity that is full of pre-planned topics is campaign capacity wearing reactive clothing; the calendar will betray that mid-quarter.
  • Content debt with no archive / retire date is a roadmap pretending to be a queue. Refuse the open-ended "we will get to it" row.

Do NOT

  • Do NOT draft channel-specific tactics (subject lines, ad creative, video specs) — the calendar is channel-agnostic; tactics live with the channel owner.
  • Do NOT collapse campaign and evergreen on the same critical path — campaign delay should not stall evergreen publish.
  • Do NOT inflate beats past one per matrix cell; the cadence will not survive a quarter of vacation.

Runnable example

Mid-market HR analytics tool, audience matrix locked (HR director · CFO · IT-security):

  • Cadence classification — evergreen (4 beats, Pareto-cut top 2 carry pull); campaign (2 beats keyed to board-quarter launch wave); reactive (8 hours per fortnight reserved); debt (11 items: 5 repay, 4 archive, 2 retire).
  • Beat-map — HR director (mid-funnel proof): one cohort-retention deep-dive per quarter. CFO (decision-funnel proof): one ROI calculator refresh per board-quarter. IT-security (top-funnel awareness): one HRIS-integration architecture explainer evergreen.
  • Hand-off → content-funnel-design translates each beat into its content shape; release-comms co-schedules board-quarter campaign with launch waves.

→ Final prose pass for audience-facing output: humanizer — remove AI-writing tells before delivery.

Reviews

No reviews yet. Tell others what you thought.

Comments

No login needed. Share how it worked for you, ask a question, or note where it did not run.

No comments yet. Be the first to write one.

Comments are published right away. Do not include personal information such as email addresses or phone numbers. Up to 2 URLs.

0 / 1,000 characters

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

More skills from this repository

Use when reviewing UI for accessibility — WCAG 2.2 AA, keyboard nav, focus, ARIA, contrast, screen-reader semantics — even on 'is this a11y-OK?' or 'mach das barrierefrei'.

The English summary is being prepared. Showing the original description.

event4u-app/agent-config12Updated Oct 21, 2026

Use when defining or auditing the activation event — aha-moment selection, retention correlation, falsifiable definition. Triggers on 'what is our aha moment', 'redefine activation'.

The English summary is being prepared. Showing the original description.

event4u-app/agent-config12Updated Oct 21, 2026

Use when capturing an architectural decision — file naming, next ADR number, Status / Context / Decision / Consequences, index regen; fires even without saying 'ADR'.

The English summary is being prepared. Showing the original description.

event4u-app/agent-config12Updated Oct 21, 2026

Adversarial critique — devil's advocate, stress-test, honest teardown ('poke holes', 'be brutal', 'was hältst du davon'); explicit request only. Routine code or design review → code-review.

The English summary is being prepared. Showing the original description.

event4u-app/agent-config12Updated Oct 21, 2026

Use when reading, creating, or updating agent documentation, module docs, roadmaps, or AGENTS.md. Understands the full .augment/, agents/, and copilot-instructions structure.

The English summary is being prepared. Showing the original description.

event4u-app/agent-config12Updated Oct 21, 2026

Use for an adversarial red-team / blue-team / auditor review of an AI agent's CONFIG + behaviour (rules, skills, MCP, hooks, permissions) — attack-chain → defensive-gap list, not a code audit.

The English summary is being prepared. Showing the original description.

event4u-app/agent-config12Updated Oct 21, 2026

See all skills by event4u-app

Report a problem with this skill