Audit UI code for WCAG compliance
The English summary is being prepared. Showing the original description.
Display project status, active tracks, and next actions
The English summary is being prepared. Showing the original description.
See how to installReview the instructions the agent will receive before you install.
Display the current status of the Conductor project, including overall progress, active tracks, and next actions.
Verify Conductor is initialized:
conductor/product.md existsconductor/tracks.md exists/conductor:setup firstCheck for any tracks:
conductor/tracks.mdRead conductor/product.md and extract:
Read conductor/tracks.md and parse:
[x])[~])[ ])For each track in conductor/tracks/:
Read conductor/tracks/{trackId}/plan.md:
- [x], - [~], - [ ] with Task prefix)[x])[~])[ ])Read conductor/tracks/{trackId}/metadata.json:
Read conductor/tracks/{trackId}/spec.md:
Scan for potential blockers:
BLOCKED: prefix================================================================================
PROJECT STATUS: {Project Name}
================================================================================
Last Updated: {current timestamp}
--------------------------------------------------------------------------------
OVERALL PROGRESS
--------------------------------------------------------------------------------
Tracks: {completed}/{total} completed ({percentage}%)
Tasks: {completed}/{total} completed ({percentage}%)
Progress: [##########..........] {percentage}%
--------------------------------------------------------------------------------
TRACK SUMMARY
--------------------------------------------------------------------------------
| Status | Track ID | Type | Tasks | Last Updated |
|--------|-------------------|---------|------------|--------------|
| [x] | auth_20250110 | feature | 12/12 (100%)| 2025-01-12 |
| [~] | dashboard_20250112| feature | 7/15 (47%) | 2025-01-15 |
| [ ] | nav-fix_20250114 | bug | 0/4 (0%) | 2025-01-14 |
--------------------------------------------------------------------------------
CURRENT FOCUS
--------------------------------------------------------------------------------
Active Track: dashboard_20250112 - Dashboard Feature
Current Phase: Phase 2: Core Components
Current Task: [~] Task 2.3: Implement chart rendering
Progress in Phase:
- [x] Task 2.1: Create dashboard layout
- [x] Task 2.2: Add data fetching hooks
- [~] Task 2.3: Implement chart rendering
- [ ] Task 2.4: Add filter controls
--------------------------------------------------------------------------------
NEXT ACTIONS
--------------------------------------------------------------------------------
1. Complete: Task 2.3 - Implement chart rendering (dashboard_20250112)
2. Then: Task 2.4 - Add filter controls (dashboard_20250112)
3. After Phase 2: Phase verification checkpoint
--------------------------------------------------------------------------------
BLOCKERS
--------------------------------------------------------------------------------
{If blockers found:}
! BLOCKED: Task 3.1 in dashboard_20250112 depends on api_20250111 (incomplete)
{If no blockers:}
No blockers identified.
================================================================================
Commands: /conductor:implement {trackId} | /conductor:new-track | /conductor:revert
================================================================================
================================================================================
TRACK STATUS: {Track Title}
================================================================================
Track ID: {trackId}
Type: {feature|bug|chore|refactor}
Status: {Pending|In Progress|Complete}
Created: {date}
Updated: {date}
--------------------------------------------------------------------------------
SPECIFICATION
--------------------------------------------------------------------------------
Summary: {brief summary from spec.md}
Acceptance Criteria:
- [x] {Criterion 1}
- [ ] {Criterion 2}
- [ ] {Criterion 3}
--------------------------------------------------------------------------------
IMPLEMENTATION
--------------------------------------------------------------------------------
Overall: {completed}/{total} tasks ({percentage}%)
Progress: [##########..........] {percentage}%
## Phase 1: {Phase Name} [COMPLETE]
- [x] Task 1.1: {description}
- [x] Task 1.2: {description}
- [x] Verification: {description}
## Phase 2: {Phase Name} [IN PROGRESS]
- [x] Task 2.1: {description}
- [~] Task 2.2: {description} <-- CURRENT
- [ ] Task 2.3: {description}
- [ ] Verification: {description}
## Phase 3: {Phase Name} [PENDING]
- [ ] Task 3.1: {description}
- [ ] Task 3.2: {description}
- [ ] Verification: {description}
--------------------------------------------------------------------------------
GIT HISTORY
--------------------------------------------------------------------------------
Related Commits:
abc1234 - feat: add login form ({trackId})
def5678 - feat: add password validation ({trackId})
ghi9012 - chore: mark task 1.2 complete ({trackId})
--------------------------------------------------------------------------------
NEXT STEPS
--------------------------------------------------------------------------------
1. Current: Task 2.2 - {description}
2. Next: Task 2.3 - {description}
3. Phase 2 verification pending
================================================================================
Commands: /conductor:implement {trackId} | /conductor:revert {trackId}
================================================================================
Display at bottom if helpful:
Legend:
[x] = Complete
[~] = In Progress
[ ] = Pending
[!] = Blocked
================================================================================
PROJECT STATUS: {Project Name}
================================================================================
Conductor is set up but no tracks have been created yet.
To get started:
/conductor:new-track "your feature description"
================================================================================
ERROR: Conductor not initialized
Could not find conductor/product.md
Run /conductor:setup to initialize Conductor for this project.
ERROR: Track not found: {argument}
Available tracks:
- auth_20250115
- dashboard_20250112
- nav-fix_20250114
Usage: /conductor:status [track-id]
For each plan.md:
- Complete: count lines matching /^- \[x\] Task/
- In Progress: count lines matching /^- \[~\] Task/
- Pending: count lines matching /^- \[ \] Task/
- Total: Complete + In Progress + Pending
Current phase = first phase header followed by any incomplete task ([ ] or [~])
filled = floor((completed / total) * 20)
empty = 20 - filled
bar = "[" + "#".repeat(filled) + ".".repeat(empty) + "]"
If invoked with --quick or -q:
{Project Name}: {completed}/{total} tasks ({percentage}%)
Active: {trackId} - Task {X.Y}
If invoked with --json:
{
"project": "{name}",
"timestamp": "ISO_TIMESTAMP",
"tracks": {
"total": N,
"completed": X,
"in_progress": Y,
"pending": Z
},
"tasks": {
"total": M,
"completed": A,
"in_progress": B,
"pending": C
},
"current": {
"track": "{trackId}",
"phase": N,
"task": "{X.Y}"
},
"blockers": []
}
<result>
<analysis>Brief analysis</analysis>
<solution>Implementation</solution>
<considerations>Trade-offs and notes</considerations>
</result>
No reviews yet. Tell others what you thought.
No login needed. Share how it worked for you, ask a question, or note where it did not run.
No comments yet. Be the first to write one.
Audit UI code for WCAG compliance
The English summary is being prepared. Showing the original description.
Expert accessibility specialist ensuring WCAG compliance, inclusive design, and assistive technology compatibility. Masters screen reader optimization, keyboard navigation, and a11y testing methodologies. Use PROACTIVELY when auditing accessibility, remediating a11y issues, building accessible components, or ensuring inclusive user experiences.
The English summary is being prepared. Showing the original description.
Skill for accessibility-patterns tasks.
The English summary is being prepared. Showing the original description.
Build AI assistant application with NLU, dialog management, and integrations
The English summary is being prepared. Showing the original description.
Build production-ready LLM applications, advanced RAG systems, and intelligent agents. Implements vector search, multimodal AI, agent orchestration, and enterprise AI integrations. Use PROACTIVELY for LLM features, chatbots, AI agents, or AI-powered applications.
The English summary is being prepared. Showing the original description.
You are an expert AI-powered code review specialist combining automated static analysis, intelligent pattern recognition, and modern DevOps practices. Leverage AI tools (GitHub Copilot, Qodo, GPT-5, Claude 4.5 Sonnet) with battle-tested platforms (SonarQube, CodeQL, Semgrep) to identify bugs, vulnerabilities, and performance issues.
The English summary is being prepared. Showing the original description.