add-bead
FreeCapture free-text work as a tracked Beads issue. Use when the user runs /add-bead or wants to quickly file a Beads issue.
The English summary is being prepared. Showing the original description.
Report git state, ready work, blocked items, and PR health. Use when the user runs /status or wants a workspace snapshot.
The English summary is being prepared. Showing the original description.
Review the instructions the agent will receive before you install.
Shows git state, ready work, blocked items, and PR health.
/status # Standard status view
/status --deep # Full triage (runs /triage)
git status --short
git log --oneline -5
git branch -vv
Show:
git stash listbd ready || echo "⚠ Beads unreachable — start the Dolt server: bd dolt start (then re-run /status)"
Display top 5 unblocked, unclaimed tasks sorted by priority. Format:
READY WORK
T-42 [high] Add refresh token rotation (feat)
T-45 [med] Update user profile UI (feat)
T-48 [low] Clean up unused imports (chore)
bd list --status=in_progress
Show tasks currently claimed/in-progress.
Identify blocked tasks (dependency not yet closed, or status: blocked):
bd blocked
For each blocked item, show what it's waiting on.
gh pr list --state open --json number,title,state,statusCheckRollup,baseRefName --limit 10
For each open PR:
Also check recently merged PRs:
gh pr list --state merged --limit 3 --json number,title,mergedAt
GIT STATE
Branch: feat/T-42-refresh-tokens → main (2 ahead, 0 behind)
Clean: yes
Last commit: abc1234 feat(auth): add token expiry check
READY WORK (3 tasks)
T-45 [high] Implement user settings page
T-48 [med] Fix pagination bug on dashboard
T-51 [low] Update API docs
IN PROGRESS (1 task)
T-42 [high] Add refresh token rotation (you)
BLOCKED (1 task)
T-49 waiting on T-45 (not started)
OPEN PRS (2)
#17 feat(auth): refresh tokens CI: PASS ← ready to merge
#15 fix(dash): pagination CI: FAIL ← needs attention
MERGED (last 3)
#14 chore: update deps (2 days ago)
#13 feat(api): rate limit (4 days ago)
#12 fix(auth): token exp (1 week ago)
--deep FlagWhen --deep is passed: run /triage for full deadline and capacity analysis.
bd errors (Dolt server down): surface it loudly and tell the user to run bd dolt start, then re-run /status. Do NOT silently skip Beads sections. Only if bd is genuinely not installed, note "(bd not installed)".gh is not installed: skip PR sections, note "(gh CLI not configured)"No reviews yet. Tell others what you thought.
No login needed. Share how it worked for you, ask a question, or note where it did not run.
No comments yet. Be the first to write one.
Capture free-text work as a tracked Beads issue. Use when the user runs /add-bead or wants to quickly file a Beads issue.
The English summary is being prepared. Showing the original description.
Register a new sub-repo in the knowledge base.
The English summary is being prepared. Showing the original description.
Add focused Bun unit tests for mission-critical behavior and edge cases — not blanket coverage.
The English summary is being prepared. Showing the original description.
Answer questions about the codebase from knowledge files. Use when the user runs /ask or asks a domain/knowledge question about the repos.
The English summary is being prepared. Showing the original description.
Meta-skill for creating Agent Forge skills under .claude/skills/ with SKILL.md, optional references/ and scripts/, and Bun scaffolds. Use when the user wants to add or author a skill, scaffold a new skill folder, or align skill docs with harness conventions (JSON script output, Beads for tasks).
The English summary is being prepared. Showing the original description.
Choose Beads issue priority (P0–P4, numeric, or named) from urgency, impact, and risk when creating or triaging work.
The English summary is being prepared. Showing the original description.