add-bead
FreeCapture free-text work as a tracked Beads issue. Use when the user runs /add-bead or wants to quickly file a Beads issue.
The English summary is being prepared. Showing the original description.
Deadline management and capacity planning across epics and PRs. Use when the user runs /triage or wants deadline/capacity triage.
The English summary is being prepared. Showing the original description.
See how to installReview the instructions the agent will receive before you install.
Classifies epics by deadline risk, reviews open PRs across repos, and creates bugs for failing CI.
/triage
/triage --epic EPIC-7 # Triage a single epic
bd ready --type epic 2>/dev/null
bd ready --status in_progress --type epic 2>/dev/null
For each epic: bd show <EPIC-ID> to get due date, task count, completed count.
For each epic, calculate:
Classify:
| Status | Criteria |
|---|---|
| OVERDUE | Due date has passed and epic is not closed |
| AT RISK | Due in <7 days with >30% tasks remaining, OR blocked tasks on critical path |
| ON TRACK | Due in ≥7 days with ≤30% remaining, OR no due date |
| COMPLETE | All tasks closed |
gh pr list --state open --json number,title,headRefName,statusCheckRollup,reviews,createdAt --limit 20
For each open PR, check:
Flag PRs that need attention:
For each PR with failing CI:
bd create \
--type bug \
--title "[<repo>] CI failing on PR #<n>: <pr title>" \
--priority 1 \
--acceptance "CI passes on PR #<n>"
bd comments add <new-bug-id> "design: CI failure detected by /triage. PR: #<n>. Failures: <ci check names>"
Priority policy: keep high for merge-blocking CI on important branches; use critical only when production or security is directly at risk. When re-ranking work, use .claude/skills/beads-priority-assignment/SKILL.md.
Only create if a bug for this PR doesn't already exist:
bd ready | grep -i "PR #<n>" # Skip if already filed
List all ready tasks by priority to help with planning:
bd ready | head -20
Count by priority:
Identify any tasks blocked for more than 3 days — flag them as potential abandonment candidates.
## Triage Report — <date>
### Epics
🔴 OVERDUE (1)
EPIC-3 "User permissions system" due 2026-04-05 (6 days overdue)
8/12 tasks complete → 4 tasks remain
🟠 AT RISK (1)
EPIC-5 "Dashboard redesign" due 2026-04-18 (7 days)
3/10 tasks complete → 7 tasks remain (needs ~1/day)
⚠ T-67 blocked (dependency on T-54)
🟢 ON TRACK (2)
EPIC-7 "Settings page" due 2026-04-25 (14 days)
5/8 tasks complete → 3 tasks remain
EPIC-9 "API rate limiting" no due date
1/4 tasks complete
---
### PR Health (4 open)
#17 feat(auth): refresh tokens CI: PASS ✓ Approved (2 days old)
#18 fix(dash): pagination CI: FAIL ← created T-71 bug
#16 chore: update deps CI: PENDING (in progress)
#15 feat(settings): user prefs CI: PASS ✗ Awaiting review (3 days)
Action: Assign reviewer to #15
---
### Capacity (ready tasks)
Critical: 1 High: 5 Medium: 8 Low: 3
Longest-blocked:
T-49 "Migrate to v2 API" blocked 5 days → consider deferring
---
### Actions Created
T-71 [bug/high] CI failing on PR #18: fix dashboard pagination
No reviews yet. Tell others what you thought.
No login needed. Share how it worked for you, ask a question, or note where it did not run.
No comments yet. Be the first to write one.
Capture free-text work as a tracked Beads issue. Use when the user runs /add-bead or wants to quickly file a Beads issue.
The English summary is being prepared. Showing the original description.
Register a new sub-repo in the knowledge base.
The English summary is being prepared. Showing the original description.
Add focused Bun unit tests for mission-critical behavior and edge cases — not blanket coverage.
The English summary is being prepared. Showing the original description.
Answer questions about the codebase from knowledge files. Use when the user runs /ask or asks a domain/knowledge question about the repos.
The English summary is being prepared. Showing the original description.
Meta-skill for creating Agent Forge skills under .claude/skills/ with SKILL.md, optional references/ and scripts/, and Bun scaffolds. Use when the user wants to add or author a skill, scaffold a new skill folder, or align skill docs with harness conventions (JSON script output, Beads for tasks).
The English summary is being prepared. Showing the original description.
Choose Beads issue priority (P0–P4, numeric, or named) from urgency, impact, and risk when creating or triaging work.
The English summary is being prepared. Showing the original description.