construction-management-expert

Expert-level construction management covering project planning, scheduling, cost estimation, procurement, quality control, safety, and contract administration.

The English summary is being prepared. Showing the original description.

Run score Not tested

See how to install

Files included (2)

  • SKILL.md2.8 KB
  • .gitkeep0 B

SKILL.md (original)

Review the instructions the agent will receive before you install.

Construction Management Expert

Before Starting

  1. Which project phase? (planning, design, construction, closeout)
  2. Which delivery method? (DBB, DB, CM at risk, IPD)
  3. Which contract type? (lump sum, GMP, cost plus, unit price)

Core Expertise Areas

Project Scheduling

CPM: critical path method, network diagram, longest path determines project duration. Float: total float is time activity can be delayed without delaying project. Gantt chart: bar chart showing activities and durations, easy to communicate. Resource leveling: adjust schedule to smooth resource demand peaks. Schedule compression: fast-tracking and crashing to shorten project duration.

Cost Estimation

Conceptual estimate: order of magnitude, plus or minus 30 percent, early stage. Detailed estimate: quantity takeoff times unit prices, plus or minus 10 percent. Contingency: allowance for undefined scope, varies with project uncertainty. Earned value: planned vs actual cost and schedule performance metrics. CPI and SPI: cost and schedule performance indices, less than 1 means behind.

Procurement and Contracts

Design-bid-build: sequential design then competitive bid, owner assumes risk. Design-build: single entity designs and builds, faster delivery. GMP: guaranteed maximum price, contractor bears cost overrun risk. Change orders: formal process for scope changes, cost and time impact.

Quality and Safety

Quality plan: inspection and testing procedures for materials and workmanship. Submittal review: contractor submits shop drawings and product data for approval. OSHA standards: regulatory requirements for construction site safety. Incident rate: OSHA recordable incidents per 200,000 man hours worked.

Best Practices

  • Update schedule and cost monthly to detect trends early
  • Document all changes and verbal agreements in writing
  • Conduct pre-construction meetings with all subcontractors
  • Implement safety program before mobilization not after incidents

Common Pitfalls

PitfallFix
Schedule without resource loadingVerify resources available for each activity
Inadequate contingencyIncrease contingency for complex or first-of-kind projects
Late submittal review causing delaysFront-load submittals for long-lead items
Verbal change order agreementsAlways issue written change orders before proceeding

Related Skills

  • structural-engineering-expert
  • geotechnical-engineering-expert
  • transportation-engineering-expert

Reviews

No reviews yet. Tell others what you thought.

Comments

No login needed. Share how it worked for you, ask a question, or note where it did not run.

No comments yet. Be the first to write one.

Comments are published right away. Do not include personal information such as email addresses or phone numbers. Up to 2 URLs.

0 / 1,000 characters

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

More skills from this repository

Expert-level abstract algebra knowledge. Use when working with groups, rings, fields, modules, Galois theory, representation theory, or algebraic structures. Also use when the user mentions 'group', 'ring', 'field', 'homomorphism', 'isomorphism', 'normal subgroup', 'quotient group', 'Sylow theorem', 'Galois theory', 'polynomial ring', 'ideal', 'module', 'vector space', or 'representation theory'.

The English summary is being prepared. Showing the original description.

luokai0/ai-agent-skills-by-luo-kai13Updated May 6, 2026

Expert-level acoustics knowledge. Use when working with sound waves, acoustic propagation, resonance, standing waves, Doppler effect, room acoustics, ultrasound, noise control, musical acoustics, or architectural acoustics. Also use when the user mentions 'sound wave', 'decibel', 'frequency', 'resonance', 'standing wave', 'Doppler effect', 'acoustic impedance', 'reverberation', 'ultrasound', 'noise control', 'harmonics', or 'sound intensity'.

The English summary is being prepared. Showing the original description.

luokai0/ai-agent-skills-by-luo-kai13Updated May 6, 2026

Expert-level aerodynamics covering subsonic and supersonic flow, lift and drag, airfoil theory, boundary layers, compressible flow, and CFD methods.

The English summary is being prepared. Showing the original description.

luokai0/ai-agent-skills-by-luo-kai13Updated May 6, 2026

Expert-level air quality engineering covering pollutant sources, atmospheric dispersion, air quality standards, emission controls, and air quality modeling.

The English summary is being prepared. Showing the original description.

luokai0/ai-agent-skills-by-luo-kai13Updated May 6, 2026

Expert-level aircraft structures covering structural design philosophy, wing and fuselage analysis, fatigue and damage tolerance, composite structures, and certification.

The English summary is being prepared. Showing the original description.

luokai0/ai-agent-skills-by-luo-kai13Updated May 6, 2026

Expert-level algorithms and complexity theory covering sorting, searching, graph algorithms, dynamic programming, greedy algorithms, NP-completeness, and algorithm design paradigms.

The English summary is being prepared. Showing the original description.

luokai0/ai-agent-skills-by-luo-kai13Updated May 6, 2026

See all skills by luokai0

Report a problem with this skill