Skip to content
cccskills
FreePublished on GitHub

daily-okr

Use when planning or closing a daily knowledge-compounding cycle across input, cognition, wiki, behavior, creativity, output, and feedback.

The English summary is being prepared. Showing the original description.

Mark393295827/third-brain-v7-skills141 stars(GitHub 141 + cccskills 0)

Run score Not tested

See how to install

Files included (1)

  • SKILL.md4.2 KB

SKILL.md (original)

Review the instructions the agent will receive before you install.

Daily OKR

<skill_contract> <input>Date, one priority objective, available time, active project, current inputs, and prior-day evidence.</input> <output>A seven-KR daily cycle linking input, cognition, wiki, behavior, creativity, output, and feedback.</output> <done>Each claimed KR has a durable receipt, and today's feedback changes one explicit next-day action or knowledge state.</done> <non_goals>Seven unrelated priorities, invented completion, activity counting without evidence, or treating scheduled notes as execution.</non_goals>

Run one daily objective through seven linked Key Results. The cycle compounds only when evidence from today changes tomorrow's behavior or knowledge state.

Usage Template

Provide: date, one objective, available time, active project, knowledge inputs, and yesterday's evidence. Optional: a scheduled knowledge-loop note; treat it as input, not proof of execution.

Workflow

<intake>
  1. Load the current daily state and any scheduled-loop proposal.
  2. Choose one objective tied to an active project or explicit learning goal.
  3. Set a total time budget and a minimum viable day.
  4. Carry forward only unresolved items with an owner or decision value.
</intake>

<unknowns_gate>

If priority, available time, or completion evidence is missing, return NEEDS_INPUT with one narrow probe. If the day is constrained, select the minimum cycle rather than fabricating seven completed results.

</unknowns_gate>

<execute>

Create seven causally linked KRs:

  1. Input: capture one high-value source or observation.
  2. Cognition: extract one mechanism, contradiction, or decision implication.
  3. Wiki: write or improve one durable note with provenance.
  4. Behavior: execute one minimum behavior linked to the objective.
  5. Creativity: produce one alternative or falsifiable experiment.
  6. Output: ship one reviewable artifact or project increment.
  7. Feedback: record evidence, error, and tomorrow's adjustment.

Each KR needs an artifact or receipt. Keep unfinished work visible; do not convert a scheduled trigger into a success claim.

</execute> <evaluate>

At close, mark each KR done, partial, blocked, or skipped from evidence. Check that at least one input became a durable wiki change and one observation changed a future action. Remove vanity metrics and report the bottleneck.

</evaluate>

<state_contract>

Persist {run_id, status, attempt, budget, evidence, unknowns, last_error, next_action} plus date, objective, seven KR statuses, artifact links, bottleneck, and tomorrow adjustment. Append receipts; never rewrite historical completion evidence.

</state_contract>

Failure Protocol

  • NEEDS_INPUT: no daily objective or time budget can be inferred safely.
  • BLOCKED_DEPENDENCY: a required source, project, or tool is unavailable; complete independent KRs and record the blocker.
  • VERIFY_FAILED: a KR has no artifact or receipt; mark it partial or skipped.
  • BUDGET_STOP: time is exhausted; close the state and select one next action.

Output Contract

Return status, result (objective plus seven KR states), evidence (artifact links or receipts), unknowns, and next_action for the next cycle.

Edge Cases

  • Only 15 minutes remain: perform Input -> Cognition -> Wiki as one atomic note, then record feedback; mark other KRs skipped.
  • A scheduled loop note exists but no command ran: record the trigger as proposed work, not execution evidence.

Success Metrics

  • One objective governs all seven KRs.
  • At least one source becomes a verified durable note.
  • The closing feedback changes a named next action.

Quality Gates

  • Every completed KR has evidence.
  • Scheduled and executed states are distinct.
  • Carry-forward work has decision value and an owner.
  • The minimum day respects the declared budget.

</skill_contract>

Reviews

No reviews yet. Tell others what you thought.

Comments

No login needed. Share how it worked for you, ask a question, or note where it did not run.

No comments yet. Be the first to write one.

Comments are published right away. Do not include personal information such as email addresses or phone numbers. Up to 2 URLs.

0 / 1,000 characters

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

More skills from this repository

Use when work has genuinely independent streams or distinct builder, evaluator, domain, and integration roles that require bounded multi-agent command scaled from 5 to 100+ agents.

The English summary is being prepared. Showing the original description.

Mark393295827/third-brain-v7-skills141Updated Sep 19, 2026

Use when designing or refactoring a model-native engineering workflow with bounded autonomy, probes, custom evaluation, durable state, and verified write-back.

The English summary is being prepared. Showing the original description.

Mark393295827/third-brain-v7-skills141Updated Sep 19, 2026

Use when property-service operations need an AI plus ontology plus DMAIC design for work orders, dispatch, quotes, evidence, CTQ metrics, and control dashboards.

The English summary is being prepared. Showing the original description.

Mark393295827/third-brain-v7-skills141Updated Sep 19, 2026

Use when a personal or team operating system needs a bounded redesign using Four-C, closed-loop controls, 70/30 allocation, 3B creativity, experiments, and prediction-error learning.

The English summary is being prepared. Showing the original description.

Mark393295827/third-brain-v7-skills141Updated Sep 19, 2026

Use when a goal must be converted into a repeatable behavior, cue, SOP, review cadence, and identity-aligned reinforcement.

The English summary is being prepared. Showing the original description.

Mark393295827/third-brain-v7-skills141Updated Sep 19, 2026

Use when source material must be transformed into a compact, evidence-aware model for learning, decisions, or an Obsidian concept note.

The English summary is being prepared. Showing the original description.

Mark393295827/third-brain-v7-skills141Updated Sep 19, 2026

See all skills by Mark393295827

Report a problem with this skill