activity-recap
FreeUse when the user needs a standup-ready summary of recent project activity from local evidence.
The English summary is being prepared. Showing the original description.
Use when broad work needs to be broken into small verifiable slices.
The English summary is being prepared. Showing the original description.
See how to installReview the instructions the agent will receive before you install.
Lifecycle stage: PLAN
Use after a brief/design is accepted and before build.
Do not use when this trigger is absent; choose the command or skill that owns the requested state, artifact, and verification gate.
| Shortcut | Rebuttal |
|---|---|
| "This is obvious." | Write the assumption and evidence. If you cannot, it is not obvious. |
| "We can do this later." | If the missing step changes the decision, do it now or state the risk. |
| "The user wants speed." | Reduce scope; do not skip the quality bar. |
| "This does not need verification." | Every important claim or behavior needs proof. |
Implementation Plan
Use templates/implementation-plan.md. The artifact should be concise, auditable, and include evidence, blockers, and next action so another agent can resume. Each slice should be independently runnable by another agent without private context.
Trigger: a broad plan needs a safe first slice. Action: split work into ordered slices that start with a validator, eval, or failing test where behavior changes. Output artifact: templates/implementation-plan.md with blockers and next action. Verification: each slice names acceptance checks, verification command, rollback, and artifact changed.
A brief requires a new adapter. Plan slices should start with a failing validator or smoke fixture for the adapter contract, then a docs/template update, then local validation and real-runtime smoke evidence. Each slice names acceptance checks, a verification command, rollback, and the artifact it updates.
No reviews yet. Tell others what you thought.
No login needed. Share how it worked for you, ask a question, or note where it did not run.
No comments yet. Be the first to write one.
Use when the user needs a standup-ready summary of recent project activity from local evidence.
The English summary is being prepared. Showing the original description.
Use when a command, adapter, or runtime smoke depends on proving an agent runtime's capabilities before trusting command routing, writes, shell access, or validation claims.
The English summary is being prepared. Showing the original description.
Use when agent-produced work needs a safety, evidence, and reliability check before handoff, merge, or trust.
The English summary is being prepared. Showing the original description.
Use when an output artifact, template, schema, example, or handoff field must stay aligned across commands, skills, docs, and validators.
The English summary is being prepared. Showing the original description.
Agent Brain /brain-brief: after intake, research, and grill have enough signal.
The English summary is being prepared. Showing the original description.
Agent Brain /brain-build: an implementation plan has a selected task and validation method.
The English summary is being prepared. Showing the original description.