Skip to content
cccskills
FreePublished on GitHub

execute-plan

Execute a previously created implementation plan — implement, test, document, and close out. Use when a plan file exists and is ready for implementation.

The English summary is being prepared. Showing the original description.

See how to install

Files included (1)

  • SKILL.md2.5 KB

SKILL.md (original)

Review the instructions the agent will receive before you install.

Execute Implementation Plan

You have been given a plan file. Your job is to implement it fully — code, test, document, and close out.

Instructions

1. Read the Plan

  • Read the attached plan file completely.
  • Understand every section: Context, Current State, Target State, Implementation Steps, Testing Plan, Post-Implementation Checklist.
  • Note the gate structure.

2. Review Recent Context

  • Read latest task log(s) in docs/task/logs/.
  • Read docs/task/todo.md for conflicts.
  • Read docs/task/lessons.md for relevant lessons.
  • Read agent observation logs in docs/agent-observations/ for relevant unresolved items.

If the plan is stale or conflicts, STOP and tell the user.

3. Execute Implementation Steps

Work through each step in order:

  • Mark checkboxes as you complete them.
  • Follow exact file paths, line numbers, and descriptions.
  • If line numbers have drifted, locate by context.
  • If blocked or plan is wrong, STOP and tell the user.

4. Execute Testing Plan (BLOCKING)

After ALL implementation steps, execute the Testing Plan:

  1. Run every Automated Check.
  2. Execute every Browser Verification step using Chrome MCP tools. Log in at http://localhost:8080/wp-admin (admin/password). Resize to 1900×1200.
  3. Execute every Regression Check.
  4. Verify Edge Cases.

Reading code is not testing. You must use Chrome MCP tools for UI verification. If any test fails, fix and re-test.

5. Documentation & Logging (only after testing passes)

  1. Update affected documentation per the trigger map in AGENTS.md.
  2. Add task log entry to today's docs/task/logs/YYYY-MM-DD.md.
  3. Log observations to docs/agent-observations/. If none: "Observations: none."

6. Close Out

  1. Update plan status to Complete.
  2. Mark all Post-Implementation Checklist items checked.
  3. Remove task from docs/task/todo.md.
  4. Move plan file from draft/ to completed/.
  5. Confirm to user: what was done, what was tested, result.

Rules

  • Follow the plan exactly. No adding/skipping/reordering unless blocked.
  • Testing is not optional. Gate 2 must pass before Gate 3.
  • Do not ask the user to test. You are the tester.
  • If the plan is outdated, STOP and tell the user.
  • Do not close with undocumented observations.
  • No backup files in source directories.
  • Follow all rules in AGENTS.md.

Reviews

No reviews yet. Tell others what you thought.

Comments

No login needed. Share how it worked for you, ask a question, or note where it did not run.

No comments yet. Be the first to write one.

Comments are published right away. Do not include personal information such as email addresses or phone numbers. Up to 2 URLs.

0 / 1,000 characters

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

More skills from this repository

commit

Free

Stage, commit, and push code changes with branch safety and explicit staging. Use when ready to commit work. Invoked by saying "commit", "push", or "commit and push".

The English summary is being prepared. Showing the original description.

savedpixel/ai-agent-rules-generator8Updated Apr 12, 2026

Batch-commit all uncommitted changes grouped by relevance. Use when multiple accumulated changes need committing. Invoked by saying "commit all" or "commit everything".

The English summary is being prepared. Showing the original description.

savedpixel/ai-agent-rules-generator8Updated Apr 12, 2026

Document completed work — update task log, sync documentation, log observations. Use after finishing a task or batch of changes.

The English summary is being prepared. Showing the original description.

savedpixel/ai-agent-rules-generator8Updated Apr 12, 2026

Merge dev branch into master/main and push. Use when dev changes are ready for production branch. Invoked by saying "merge to master" or "merge to main".

The English summary is being prepared. Showing the original description.

savedpixel/ai-agent-rules-generator8Updated Apr 12, 2026

Create a detailed implementation plan before coding. Use when starting a new feature, multi-step refactor, or complex task. Invoked by saying "plan", "create a plan", or "plan this task".

The English summary is being prepared. Showing the original description.

savedpixel/ai-agent-rules-generator8Updated Apr 12, 2026

report

Free

Generate a structured report on completed work, a feature area, or a topic. Saved to the reports directory. Invoked by saying "report", "generate report", or "summarize work".

The English summary is being prepared. Showing the original description.

savedpixel/ai-agent-rules-generator8Updated Apr 12, 2026

See all skills by savedpixel

Report a problem with this skill