Pre-Mortem Analysis

Core rule: Prospective hindsight beats "what could go wrong?" Assume the plan has already failed (past tense), generate concrete failure paths, reverse them into prevention requirements, and bind each top path to a verifiable plan change.

When to Use

  • Before kickoff, major technical commitment, high-risk sprint work, launch, or release.
  • After a plan looks solid but before execution, especially when optimism or overconfidence is likely.
  • When a decision is costly to reverse and risks are still implicit rather than enforced.

When NOT to Use

  • Work is small, local, and cheaply reversible — skip the ceremony.
  • You are mid-incident under time pressure — act now (OODA / scientific method); pre-mortem is pre-execution.
  • You would only emit generic risks ("scope creep", "requirements unclear") that do not bind to this plan.
  • Risks are already enforced by live gates (CI, canary, rollback, alerts) with no residual unlisted path.
  • A mature risk register already covers the same specific failure paths with owners and checks.

Procedure

  1. Set the failure frame in past tense: "It is [post-deadline date]. The plan failed: [rollback / data loss / no adoption / SLA breach]." Explaining a happened failure is required; predicting one is not enough.
  2. Generate failure reasons before filtering: sweep technical, process, assumptions, dependencies/external, and people. Force a second pass: "What did the plan most need to be true that was not?" Collect breadth first (aim for many distinct reasons); do not rank mid-sweep.
  3. Prioritize: group by theme; score likelihood × impact; keep the top 3–5 concrete risks (drop generics that do not bind).
  4. Failure-first reverse analysis (absorbed reverse path): for each top risk, (a) restate the failed outcome in past tense, (b) list necessary/enabling conditions that had to be true for that failure, (c) invert each condition into a verifiable prevention requirement (avoid/require rule + check), (d) bind owner, verification checkpoint, and ship/stage gate.
  5. Mitigate and update the plan: for each top risk, attach mitigation steps, spike/contingency if needed, and the reverse-analysis prevention requirements as explicit plan gates. A pre-mortem with no plan change is incomplete.
  6. Stop when top risks each have a bound mitigation or prevention gate, or when further reasons are only generic restatements — then ship the updated plan, do not keep brainstorming.

Output

  1. Failure scenario — past-tense disaster frame with date and failed outcome.
  2. Failure reasons — unfiltered list, then prioritized top 3–5 with likelihood × impact.
  3. Reverse paths — for each top risk: necessary conditions → inverted prevention requirements.
  4. Mitigations — owner, verification checkpoint, ship/stage gate per top risk.
  5. Plan deltas — concrete tasks, spikes, contingencies, and gates added to the plan.

Verification

  • Falsify/stop: if no plan-specific failure path can be stated in past tense with necessary conditions, stop — you are generating theater, not risk. If a "mitigation" has no verification checkpoint, it is not done.
  • Over-application guard: do not pre-mortem reversible chores, mid-incident firefighting, or systems that already enforce the same paths. Do not leave abstract risks as "mitigate later"; either invert them into gates or drop them as non-actionable.

Reviews

No reviews yet. Tell others what you thought.

Comments

No login needed. Share how it worked for you, ask a question, or note where it did not run.

No comments yet. Be the first to write one.

Comments are published right away. Do not include personal information such as email addresses or phone numbers. Up to 2 URLs.

0 / 1,000 characters

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

More skills from this repository

Use when search or investigation could run forever. Set an explicit good-enough threshold first, then stop at the first option that clears it.

The English summary is being prepared. Showing the original description.

tjboudreaux/cc-thinking-skills1.7KUpdated Aug 8, 2026

Use when a specific claim may lack grounding. Check evidence boundary, size wrongness cost, then answer, fetch, or abstain — never confabulate.

The English summary is being prepared. Showing the original description.

tjboudreaux/cc-thinking-skills1.7KUpdated Aug 8, 2026

When the right response mode is unclear, classify the cause-effect domain first; decompose disorder.

The English summary is being prepared. Showing the original description.

tjboudreaux/cc-thinking-skills1.7KUpdated Aug 8, 2026

Under genuine uncertainty with no reliable forecast, inventory means, cap downside at affordable loss, act for commitments, and let goals emerge from controllable moves.

The English summary is being prepared. Showing the original description.

tjboudreaux/cc-thinking-skills1.7KUpdated Aug 8, 2026

When a constraint is treated as fixed, separate physics from convention, keep only independently supported primitives, and rebuild the simplest solution that satisfies real constraints.

The English summary is being prepared. Showing the original description.

tjboudreaux/cc-thinking-skills1.7KUpdated Aug 8, 2026

When a fault is localized and the proximate cause is known but the systemic root is not, chain evidence-linked whys with a counterfactual stop and a countermeasure.

The English summary is being prepared. Showing the original description.

tjboudreaux/cc-thinking-skills1.7KUpdated Aug 8, 2026

See all skills by tjboudreaux

Report a problem with this skill