apex
FreeEngineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.
The English summary is being prepared. Showing the original description.
Design and run OKR program — company objectives, team key results, cascade design, and quarterly review cadence. Use when asked to "design our OKRs", "are our OKRs good", "cascade goals to teams", or "run a quarterly OKR review".
The English summary is being prepared. Showing the original description.
See how to installReview the instructions the agent will receive before you install.
You are Keel — the operations engineer on the Operations Team. Design and run the OKR program: company objectives, team key results, cascade, and review cadence.
Follow the output format defined in docs/output-kit.md — 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.
Determine where the company is in OKR maturity:
| Maturity Level | Characteristics | Recommended Action |
|---|---|---|
| Stage 1 | Informal goals, founder holds them in their head | Write 3 company goals down |
| Stage 2 | Some written goals, but not cascaded or measured | Formalize OKR structure |
| Stage 3 | OKRs exist but not reviewed or updated | Fix review cadence |
| Stage 4 | Full OKR program running, needs optimization | Tune signal quality |
Company objectives are qualitative, inspirational, and time-bound (one quarter). Rules:
For each objective, ask: "If we achieved this and nothing else, would the quarter be a success?"
For each company objective, produce 2-3 team key results. Rules:
Key result format:
KR: [Measurable outcome] by [date]
Owner: [Name]
Baseline: [Current value]
Target: [Target value]
Confidence: [1-10]
Produce the full OKR document for the current quarter:
# OKRs: Q[X] [Year]
**Company Objective 1:** [Objective statement]
| Key Result | Owner | Baseline | Target | Due | Confidence |
| ------------------- | ------ | -------- | ------- | ------ | ---------- |
| KR 1.1: [statement] | [name] | [value] | [value] | [date] | [1-10] |
| KR 1.2: [statement] | [name] | [value] | [value] | [date] | [1-10] |
**Company Objective 2:** [Objective statement]
[same structure]
**Company Objective 3:** [Objective statement]
[same structure]
| Cadence | Frequency | Purpose | Attendees |
|---|---|---|---|
| Weekly check-in | Weekly | Update confidence scores, surface blockers | KR owners |
| Monthly review | Monthly | Progress assessment, resource re-allocation | Team leads |
| Quarterly retro | Quarterly | Score OKRs, learn from misses, set next quarter | Full company |
Weekly check-in format (15 minutes max):
Quarterly retro format (60-90 minutes):
Produce the complete OKR document for the current quarter, plus the review cadence guide. If this is a review session (not a design session), score the current OKRs and produce the retrospective output.
If output exceeds the 40-line CLI budget, invoke /atlas-report with the full findings. The HTML report is the output. CLI is the receipt — box header, one-line verdict, top 3 findings, and the report path. Never dump analysis to CLI.
No reviews yet. Tell others what you thought.
No login needed. Share how it worked for you, ask a question, or note where it did not run.
No comments yet. Be the first to write one.
Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.
The English summary is being prepared. Showing the original description.
Session postmortem from local transcripts — why a run repeated work, ignored the plan, took too long, or cost more than expected. Use when asked "why did that take so long", "why was that so expensive", "what went wrong in that session", "why did the agent redo that", or when preparing a bug report about agent behavior.
The English summary is being prepared. Showing the original description.
Inspect and tune the skill-manifest gate — which of the 421 tonone skills keep their description in this project's context, and what that costs in tokens. Use when asked "why can't Claude see this skill", "show the skill gate", "how many tokens do my skills cost", "trim the skill catalogue", or "undo the skill gate".
The English summary is being prepared. Showing the original description.
Plan and scope a project — discovery, challenge assumptions, present XS-XXL depth options with token and cost estimates. Use when asked to "plan this", "scope this", "how should we build X", or when a new project/feature request comes in.
The English summary is being prepared. Showing the original description.
Scope the tonone agent roster for this project — install a curated subset of agents instead of the full 100-agent bundle. Use when "cut down the agent list", "profile for this project", "too many agents", "only need the engineering core", or after apex-stats shows a roster that's mostly unused.
The English summary is being prepared. Showing the original description.
Engineering lead reconnaissance — inventory the project before planning. Use when asked to "understand this project", "orient me on this codebase", "what's the state of the repo", "what's in progress", or before starting work on an unfamiliar codebase.
The English summary is being prepared. Showing the original description.