Skip to content
cccskills
FreePublished on GitHub

phasing

Group slices into risk-optimized phases with timeline generation

The English summary is being prepared. Showing the original description.

Works withNotion
See how to install

Files included (1)

  • SKILL.md4.8 KB

SKILL.md (original)

Review the instructions the agent will receive before you install.

Phasing Skill

Group implementation slices into phases based on combined risk and GTM scores, then generate a visual timeline.

When to Use

  • During Ask mode Phase 2 (CONVERGE), after dependency-mapping and gtm-alignment
  • Before transitioning to Plan mode
  • To generate the final delivery timeline

Instructions

Phase 1: Gather Scores

Collect scores from previous skills:

SliceRisk ScoreGTM Score
[From dependency-mapping][N][From gtm-alignment]

Phase 2: Calculate Combined Score

Final Priority Score = Risk - (GTM x 0.5)

Lower score = ships earlier
SliceRiskGTMFinalRank
#2.2 Invite Flow783.01
#1.1 Switcher14-1.02
#1.2 Members UI432.53

Phase 3: Group into Phases

Apply grouping rules:

PhaseCriteriaTypical Contents
Phase 1P1 + Lowest risk + Serves T1FE-only components, quick wins
Phase 2P2 + Dependencies on P1 completeFE+BE integration, non-breaking
Phase 3P3/P4 + Highest riskContract changes, data model

Grouping Constraints:

  • Respect dependency order (check DSM matrix from dependency-mapping)
  • Each phase should be independently deployable
  • Each phase should serve at least one complete persona tier
  • Keep phases to 3-5 days when possible

Phase 4: Generate Timeline (ASCII)

Use ASCII format grouped by stack. Show only dependencies with arrows. No dates or effort estimates.

ASCII Timeline Format:

TIMELINE: [Feature Name]
═══════════════════════════════════════════════════════════

FRONTEND
├── [Slice name]
├── [Slice name] ───────────────┐
├── [Slice name] ───────────────┼──┐
└── [Slice name] ───────────────┘  │
                                   │
BACKEND                            │
└── [Slice name] ◄─────────────────┘
         │
         ▼
INFRASTRUCTURE
└── [Slice name]
         │
         ▼
INTEGRATION
├── [Slice name]
└── [Slice name]

═══════════════════════════════════════════════════════════
LEGEND:
├── = parallel (no dependency)
──► = dependency (must complete before)

Stack Grouping Rules:

SectionContains
FrontendComponents, pages, client-side logic, Storybook
BackendAPI routes, middleware, services, database
InfrastructureDNS, deployment, environment config
IntegrationCross-cutting features, E2E flows

Dependency Notation:

  • ├── items in same section run in parallel
  • ──► or ◄── arrows show blocking dependencies
  • │ and ▼ show sequential flow between stacks

Phase 6: Document Checkpoints

Phase EndValidationWho Validates
Phase 1Storybook review, design QADesign team
Phase 2E2E on staging, API tests passQA team
Phase 3Production deploy, monitoringOps team

Output Format

Output an executive summary (like DIVERGE), then the ASCII timeline. Do NOT show QA Contract details or Priority Matrix.

## Value Analysis Complete

### Executive Summary

| Phase | Status | Key Output |
|-------|--------|------------|
| Scope | ✓ | Full ([N] validated wireframes from Phase 1) |
| State Machines | ✓ | [N] components, [N] states, [N] transitions |
| QA Contract | ✓ | [N] Gherkin (G#1-N), [N] acceptance (AC#1-N) |
| Dependencies | ✓ | [N] slices, [N] blockers, DSM matrix built |
| Design Reuse | ✓ | [N] existing components leveraged |
| Personas (Notion) | ✓ | Fetched [N] from DB, T1: [name], T2: [name] |
| GTM Strategy (Notion) | ✓ | Positioning: "[excerpt...]" |
| Persona Coverage | ✓ | Phase 1 serves [Tier], Phase 2 serves [Tiers] |
| Phasing | ✓ | [N] phases, [N] commits total |

### Proposed Timeline

[ASCII timeline with stacks and dependency arrows - no dates/effort]

### Checkpoints

| Phase | Validation | Owner |
|-------|------------|-------|
| 1 | [Validation] | [Team] |
| 2 | [Validation] | [Team] |
| 3 | [Validation] | [Team] |

Invocation

Invoke manually with "use phasing skill" or follow Ask mode Phase 2 (CONVERGE) which references this skill.

Related Skills

  • dependency-mapping - Provides risk scores
  • gtm-alignment - Provides GTM scores

Reviews

No reviews yet. Tell others what you thought.

Comments

No login needed. Share how it worked for you, ask a question, or note where it did not run.

No comments yet. Be the first to write one.

Comments are published right away. Do not include personal information such as email addresses or phone numbers. Up to 2 URLs.

0 / 1,000 characters

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

More skills from this repository

Produce an accounts-receivable aging report and surface overdue invoices for a Well workspace. Use when the user asks who owes them money, an AR aging report, overdue invoices, days sales outstanding (DSO), or which customers to chase.

The English summary is being prepared. Showing the original description.

WellApp-ai/Well345Updated Oct 15, 2026

Iterate until success or limit, composing existing skills with Jidoka integration

The English summary is being prepared. Showing the original description.

WellApp-ai/Well345Updated Oct 15, 2026

Build a balance sheet (bilan) from a Well workspace. Use when the user asks for a balance sheet, bilan, assets/liabilities/equity, or financial position at a point in time.

The English summary is being prepared. Showing the original description.

WellApp-ai/Well345Updated Oct 15, 2026

Generate and maintain BPMN 2.0 diagrams linked to Gherkin scenarios

The English summary is being prepared. Showing the original description.

WellApp-ai/Well345Updated Oct 15, 2026

Forecast cash flow and runway for a Well workspace from booked invoices and collected bank transactions. Use when the user asks for a cash-flow forecast, runway, how long until they run out of cash, projected balance, or expected inflows/outflows.

The English summary is being prepared. Showing the original description.

WellApp-ai/Well345Updated Oct 15, 2026

Review code changes against hard rules and conventions

The English summary is being prepared. Showing the original description.

WellApp-ai/Well345Updated Oct 15, 2026

See all skills by WellApp-ai

Report a problem with this skill