본문으로 건너뛰기
cccskills

'btp' 검색 결과

4건 · 관련도순

Reconstructed reference notes on US NRC software assurance guidance for digital computer software in nuclear power plant safety systems, built from seven public-domain sources (Regulatory Guide 1.168 Revision 2, July 2013; Regulatory Guides 1.169, 1.170, 1.171, 1.172, and 1.173 Revision 1, July 2013; NUREG-0800 Branch Technical Position 7-14 Revision 6, August 2016; pinned 2026-10-12). Use for software life cycle process questions, software requirements specifications, software configuration management plans, verification and validation with reviews and audits, test documentation and unit testing, and what NRC staff examine in a BTP 7-14 software review of plans, implementation, and design outputs. SCOPE LIMITS: NRC Regulatory Guides and the BTP 7-14 staff review position only; the endorsed IEEE standards (IEEE Std 603-1991, 7-4.3.2-2003, 828-2005, 829-2008, 830-1998, 1008-1987, 1012-2004, 1028-2008, 1074-2006), IEC 60880, IEC 61513, IEC 62138, and IAEA guides are cited by designation and edition only, with no standard text; RG 1.152 Rev 4, BTP 7-18, BTP 7-19, other SRP Chapter 7 sections, and NUREG/CR contractor reports are outside the pack; reflects the pinned 2013 and 2016 editions, not later agency actions; synthesized reference notes, not legal or licensing advice and not a substitute for the source documents. LICENCE: Public Domain (US Government work, 17 U.S.C. § 105).

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

jgsystemsconsulting/jgs-se-knowledge-packs82026년 10월 15일 업데이트

Interact with the Binarly Transparency Platform (BTP) via CLI commands for uploading firmware, running scans, downloading BA2 archives, and pushing custom rules. Use when you need to interact with the Binarly Transparency Platform or working with BA2s.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

vulhunt-re/skills162026년 3월 8일 업데이트

Investigate stalled TPU training across multiple slices on GKE using hang reports, logs, and latency metrics. Separate compilation inconsistencies and data input stalls from hardware or network faults, and identify the relevant nodes for further investigation.

한국어 요약은 준비 중입니다. 영어 요약을 표시하고 있습니다.

  • Investigating HANG_DETECTED logs during TPU training
  • Separating input stalls from hardware faults
  • Mapping reported faulty instances to GKE nodes
google/skills2.1만2026년 10월 17일 업데이트

Expert en technologies de construction avancées (permis, CTC, matériaux, DTR, réglementation Algérie)

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

ziri22/agency-roster62026년 7월 1일 업데이트