Validates completed work against defined acceptance criteria. Use after completing a task that has specific success criteria defined in issues, specs, or task descriptions.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Analyzes large tasks for independent subtasks that can be safely parallelized. Produces a DAG-based dispatch plan with dependency ordering and maximum parallelism. Use when a task has 5+ subtasks touching independent files, or the user asks to speed up or parallelize the work.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
설치 방법 보기설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.
Large tasks are often collections of independent subtasks hiding behind a sequential mental model. Find the parallelism.
vibe-workstream-orchestration)List all subtasks from the plan or requirements
Build dependency graph — For each pair of tasks, ask:
Group into batches:
Set parallelism limit — Use the harness's native parallelism (subagents, background tasks, workflows, or cloud tasks) and respect its concurrency limits. Past a handful of concurrent streams, the integration and review cost usually outweighs the speedup, so 3–5 is a sensible default unless the tasks are trivially independent.
Isolate — Give each parallel stream its own worktree or branch if the harness supports isolation, so streams can't overwrite each other's files. Integrate afterwards with vibe-cherry-pick-integration.
Create dispatch plan:
Total Tasks: X Batches: Y Max Parallelism: Z agents Estimated Speedup: ~Nx vs sequential
Task A ──→ Task D
Task B ──→ Task D
Task C (independent)
Task D ──→ Task F
Task E (independent)
| Batch | Tasks | Parallelism | Dependencies |
|---|---|---|---|
| 0 | A, B, C, E | 4 | None |
| 1 | D | 1 | A, B |
| 2 | F | 1 | D |
After all batches complete, integrate in order: [A, B, C, E] → D → F
아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.
로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.
아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.
Validates completed work against defined acceptance criteria. Use after completing a task that has specific success criteria defined in issues, specs, or task descriptions.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Generates edge case, failure mode, and spec-driven test cases. Covers boundary values, nil inputs, concurrency, resource exhaustion, malformed data, and requirement-linked traceability tests. Use after happy-path tests exist and before claiming coverage is complete, when requirements lack tests, or before a security review.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Catches shortcuts and reward hacking — weakening or deleting tests to make them pass, hard-coding expected outputs, silently dropping requirements, or claiming work is done without running it. Use before declaring a task complete and whenever a test or requirement feels like it's in the way.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Safely integrates commits from parallel agent branches using sequential cherry-pick. Use after parallel work completes in isolated branches or worktrees.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Audits tests for concurrency safety — race conditions, shared mock state, cleanup ordering. Use when writing tests that involve goroutines, async operations, or shared mutable state.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Enforces tiered test coverage standards with three dimensions — line coverage by tier, spec-to-test traceability, and spec-to-code implementation mapping. Use before claiming code is complete.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.