Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
설치 방법 보기설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.
The EU AI Act (2024/1689) is binding from 2025–2027 in phases. Construction AI — estimators, computer-vision site monitoring, agent assistants — mostly lands in limited or minimal risk, but misclassification or missing transparency is a compliance failure, and high-risk uses (safety-critical, worker monitoring, access decisions) bring real obligations.
| System | Likely tier | Obligations |
|---|---|---|
| Cost estimation assistant (BOQ, unit prices) | limited / minimal | transparency (users know it is AI), basic logging |
| Schedule optimisation | minimal | none beyond general law |
| Site camera CV for progress | limited | transparency, data minimisation |
| CV for PPE/safety enforcement | high risk (safety component?) | full: risk management, data governance, human oversight, logs |
| Worker performance monitoring | high risk (employment) | prohibited or high-risk — treat carefully |
| AI agent that signs/submits binding documents | not allowed without human | human oversight mandatory |
Rule of thumb: if a human previously had to sign it, an AI must not sign it alone.
oce-estimate-boq, cost-estimation-*, cost-prediction: limited risk — add AI-output labels.progress-monitoring-cv, defect-detection-ai: limited — no personal data, transparency.safety-compliance-checker enforcing PPE via CV: reclassify — keep a human in the loop, document.ai-agent-orchestration: supervisor must be a human at decision gates.아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.
로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.
아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.
Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Manage as-built documentation for project closeout. Track drawing markups, coordinate updates, and verify completeness.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.