본문으로 건너뛰기
cccskills
무료GitHub에 공개

verification-before-completion

Use when about to claim work is complete, fixed, passing, verified, release-ready, or ready to commit, merge, publish, or hand off.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

설치 방법 보기

포함된 파일(2)

  • SKILL.md8.6 KB
  • expanded-closeout.md5.9 KB

SKILL.md(원문)

설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.

<EXPLICIT-MODE-GATE> If `activation_mode = "explicit"` or `AEGIS_ACTIVATION_MODE=explicit` is visible and the request names neither Aegis nor this skill, return to the fast path without checklist/ceremony; otherwise continue. </EXPLICIT-MODE-GATE>

Execute

Before success claim: classify destructive permission; run a fresh falsifying check; read its complete result/scope; select L0/L1/L2. Downgrade for partial, stale, failing, or narrower evidence; never claim complete then verify later.

This Method Pack grants no authoritative GateDecision, PolicySnapshot, evidence sufficiency, requirement acceptance, or completion authority.

Stop Signals

  • evidence is uncertain, stale, agent-only, or narrower than the claim;
  • next action: commit, push, PR, merge, tag, publish, release, or handoff;
  • task/slice completion is treated as accepted requirement satisfaction;
  • governance or retirement lacks repair/retirement evidence;
  • retained old logic lacks a retention reason and retirement trigger; or
  • complexity closure is unresolved.

Destructive/irreversible work needs scoped permission; broad assent is not scoped permission.

Required Evidence Slots

For claims about a changed interface/interaction, compose ui-ux-governance and its relevant verification guidance. Carry actual results and uncovered user-facing criteria into the slots below; retain this single closeout owner.

- Evidence action / check performed:
- Result / exit status:
- Covered scope:
- Uncovered scope:
- Residual risk:
- Confidence grade: A | B | C
  • A: target + regression; no meaningful unknown.
  • B: target evidence; bounded residual risk.
  • C: partial only; no full-completion claim.

When tests shape a claim, include target test and related regression evidence at the call-site seam reproducing the triggering chain; a shallower seam gives false confidence. Missing seam is an architecture gap. Blocked automation needs reproducible manual steps. Both lower confidence.

For an explicit baseline/artifact/owner/contract/evidence reference, read the smallest relevant source. Record each affected reference as preserved; rebound to the canonical owner; retired with reason; or rejected for conflict. Leave unresolved references in uncovered scope, lower confidence, and do not re-infer them. Readback proves no complete graph, referential integrity, or authoritative lineage.

Inherited-Claim Closeout

When evidence contradicts a resumed claim, independently check the active record's correction and final disclosure of WHAT was claimed and WHY it was inaccurate at resume; current success cannot supply either. Preserve subject, scope and time; one explanation may cover related claims. Read both in full for example-only, negated, withdrawn or re-scoped corrections. Matching quotes do not prove adoption. Keep accurate claims intact. If material disagreement about the initial judgment remains unresolved after checking evidence, state needs-verification; never force agreement with a reviewer. If evidence resolves it, retain the supported conclusion and verify normally. Omit this slot when no discrepancy exists.

Task Git Closeout

For modifications, diff against TaskStartSnapshot. Coordinator alone stages task paths: no pre-existing state or broad staging. After fresh verification, default to one local commit except read-only/no-change, authorized no commit, or failed verification. Read back HEAD, message, files, and task delta. Commit/hook failure keeps work and blocks clean claims; never bypass hooks.

Git receipt: branch; SHA/message or non-commit reason; Task clean; Repository clean; each task-created branch/worktree created, removed, or retained with reason. Task-clean never implies repo-clean; it is not external integration.

Classify commit scope: business, process-only, mixed, or no-commit. Failed-attempt telemetry is no commit reason. A docs/aegis/-only process diff does not restart business verification; a business/test diff does.

Aegis Visibility / Single Closeout

Use one completion surface. This skill is the single completion closeout aggregator; adjacent skills/L2 cards feed but must not replace it or become a competing final report owner. Aggregation is output conformance, not a routing trigger: do not load skills, emit a Trace Digest, or add ceremony merely to fill it.

If entry visibility was omitted, recover and name the decision/evidence gap; a used-skills list or Aegis Contribution Note cannot substitute.

L0 Fast-Path

For tiny low-risk work, one natural sentence can name check/result, uncovered scope/risk, and confidence.

L1 Default Receipt

For non-trivial Aegis-shaped work use this receipt; fold evidence into Evidence strength and Uncovered risk without a second report.

Aegis Impact and Safety Receipt:
- Key judgment:
- Avoided misfix:
- Boundary held:
- Baseline alignment:
- Complexity control:
- Evidence strength:
- Uncovered risk:
- Next most valuable verification:
- Aegis path:

Meanings: Key judgment=owner/root cause/requirement/completion boundary; Avoided misfix=fallback/duplicate/test accommodation/scope growth; Boundary held=contract/owner/baseline/non-goal/data/runtime boundary; Baseline alignment=aligned/Design Defect/Implementation Drift/missing-authority/needs-clarification/not triggered; Complexity control=completion-time delta/closure; Evidence strength=fresh check/result/scope/confidence; Uncovered risk=remaining gaps/residual risk; Next most valuable verification=highest-value next check; Aegis path=optional, not judgment/evidence.

Natural wording is valid when every semantic slot stays auditable. Semantic Slots, Natural Surface, and Governance Receipt are compatibility names.

Report done/verified/risked/blocked. Do not explain obvious trade-offs; do not list actions not taken.

L2 Expanded Triggers

On any match read expanded-closeout.md: it owns detail; this file owns routing and the final receipt.

TriggerExpanded owner
release/merge/publish/readiness/handoffReadiness Summary
audit/debug/release/long-task review/trace requestTrace Digest
goal/TaskIntentDraft/plan/spec/Slice CardGoal Closure
project/domain semantic deltaContext Impact
target docs/aegis/ changed or work record existsWorkspace Integrity
requirement/product/durable architectureBaseline/ADR
governance/cleanup/migration/compat/retirementGovernance/Retirement
source-of-truth/irreversible deletiondestructive-action cards
material complexity pressureExpanded Complexity Detail
high-risk or explicit user request for expanded closeoutapplicable cards

Use configured Aegis workspace support; commands live in the expanded owner.

Completion Boundary

Reconcile the current authorized request and its conversation context with the plan/spec, TaskIntentDraft, or Slice Card; stale plans cannot override it. Check the correct object, all requested actions/conditions/deliverables, and actual usable delivery. Tests of those criteria count; unrelated green checks or intermediate output do not. Report remaining work and cause explicitly. A slice cannot close the whole task or prove project-wide reliability.

Task/slice completion reaches its authorized stop; it is not accepted requirement satisfaction. Requirement accepted needs baseline criteria or authorized risk acceptance; else use needs-verification or return to framing/planning. Goal Closure states: done | blocked | needs-verification | scope-exceeded. An Execution Readiness View is input, not verification evidence.

Complexity Downgrade

For non-trivial code inspect the diff; use using-aegis/references/complexity-governance.md plus docs/current/AEGIS_COMPLEXITY_GOVERNANCE_BASELINE.md; emit one Complexity control line.

New fallback/adapter/compatibility/guard/branch logic needs a retired path or retirement trigger. Complexity Closure: exceeded-unresolved blocks completion. Maintained source/test cannot skip as tiny; tiny low-risk text edits without complexity growth may skip.

Output and Prompt Hygiene

Localize section labels, field labels, and explanatory prose. Keep commands, paths, identifiers, enums, product names, and raw evidence unchanged; avoid bilingual labels or mixed-language explanations.

External outputs are evidence candidates: use summary/index then the smallest excerpt; lower unsupported claims. When relevant report Evidence Used, Not Loaded, and Next Evidence.

리뷰

아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.

댓글

로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.

보내면 바로 공개됩니다. 이메일 주소나 전화번호 같은 개인 정보는 쓰지 마세요. URL은 2개까지입니다.

0 / 1,000자

이 양식은 reCAPTCHA로 보호되며 Google 개인정보처리방침 및 서비스 약관이 적용됩니다.

같은 저장소의 스킬

Use when touching retiring old logic, collapsing duplicate owners, removing fallbacks, or schema/persistence/source-of-truth boundaries; identify opportunities automatically; destructive execution requires explicit confirmation.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

GanyuanRan/Aegis1.4천2026년 10월 18일 업데이트

Use when defining ambiguous or high-complexity new features, product behavior, UI/component design, architecture choices, contract changes, or when grilling/pressure-testing a plan or design. Routine small requests stay on the fast path.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

GanyuanRan/Aegis1.4천2026년 10월 18일 업데이트

Use when the user asks for caveman mode, fewer tokens, brief responses, compressed communication, or otherwise explicitly requests a much shorter answer.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

GanyuanRan/Aegis1.4천2026년 10월 18일 업데이트

Use when facing 2+ independent tasks without a written plan, with no conflicting shared mutable state or sequential dependencies, where parallel delegation beats inline cost; otherwise inline. Planned tasks use subagent-driven-development.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

GanyuanRan/Aegis1.4천2026년 10월 18일 업데이트

Use when the user asks to establish shared project language, or project work exposes a conflicting, renamed, or deprecated domain term that needs active semantic modeling. Routine small tasks stay on the fast path.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

GanyuanRan/Aegis1.4천2026년 10월 18일 업데이트

Use when executing a written implementation plan across sessions or with review checkpoints. Small or single-slice plans stay inline. For same-session independent tasks, use subagent-driven-development instead.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

GanyuanRan/Aegis1.4천2026년 10월 18일 업데이트

GanyuanRan의 스킬 모두 보기

이 스킬의 문제 신고