Analyze Kanban flow metrics to identify bottlenecks and improve team throughput. Covers Cycle Time, Throughput, WIP, and Flow Efficiency using Little's Law and Theory of Constraints. Use when a team wants to optimize delivery flow or improve predictability. Do not use for sprint-based Scrum planning — use sprint-planning-assistant instead.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

설치 방법 보기

포함된 파일(2)

  • SKILL.md4.3 KB
  • agents/openai.yaml167 B

SKILL.md(원문)

설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.

Kanban Flow Analyzer

Purpose

Transform raw task completion data into actionable flow insights — find bottlenecks, set WIP limits, and forecast delivery dates with confidence intervals.

When to use

  • team wants to reduce cycle time or improve delivery predictability
  • WIP is growing and tasks are stalling in certain board columns
  • management asks "when will this be done?" and the team has no data-driven answer
  • transitioning from time-boxed sprints to continuous flow

When not to use

  • sprint planning with story points (use sprint-planning-assistant)
  • strategic roadmap or portfolio prioritization
  • teams with fewer than 4 weeks of historical data

Inputs

  • task data with start date and completion date (minimum 4 weeks history)
  • board column names and WIP limits (if any)
  • team size and working days per week
  • specific questions or concerns about flow

Procedure

  1. Calculate 4 core flow metrics:
    • Cycle Time: days from "In Progress" to "Done" — report P50 (median) and P85
    • Throughput: items completed per week — report average and trend
    • WIP: items currently in progress — compare to team capacity
    • Flow Efficiency: (active work time / total elapsed time) × 100%
      • Typical: 15–25% | High-performing: > 40%
  2. Apply Little's Law: Cycle Time = WIP ÷ Throughput
    • If cycle time is high but throughput is stable, WIP is too high
  3. Detect bottlenecks using Theory of Constraints (5 Focusing Steps):
    • Identify the column with highest average queue time
    • Exploit: maximize throughput at the constraint
    • Subordinate: slow upstream to match constraint capacity
    • Elevate: add capacity or change process at constraint
    • Repeat: new constraint will emerge
  4. Set WIP limits: initial recommendation = team size × 1.5 per column, then adjust based on data.
  5. Forecast delivery using Monte Carlo simulation:
    • "If avg throughput = 12 items/week, 60-item backlog takes ~5 weeks at P85 confidence"

Output

  • flow metrics dashboard (Cycle Time, Throughput, WIP, Flow Efficiency)
  • bottleneck analysis with identified constraint and root cause
  • WIP limit recommendations per board column
  • top 3 actionable improvements with expected impact
  • Monte Carlo forecast (items by date at P50, P85, P95 confidence)

Definition of done

  • all 4 flow metrics are calculated and reported
  • at least one bottleneck is identified with a root cause
  • WIP limit recommendations are provided
  • forecast includes at least P85 confidence level

Examples

  • "Analyze our Jira board data for the last 8 weeks — why are tasks stuck in Code Review?"
  • "Our cycle time went from 5 days to 12 days. What happened?"
  • "Set WIP limits for a 7-person team with columns: To Do, In Progress, Review, QA, Done."

Quality Criteria

  • Data sources and assumptions are explicitly stated
  • Calculations are reproducible from provided inputs
  • Visualizations or tables have clear labels, units, and time ranges
  • Caveats and confidence levels are documented for estimates

Verification (4C)

CheckQuestion
CorrectnessAre formulas, aggregations, and statistical methods applied correctly?
CompletenessDoes the analysis cover all requested metrics and time ranges?
Context-fitAre the chosen metrics relevant to the business question being answered?
ConsequenceIf this data were used for a decision today, what blind spots remain?

Edge Cases

  • Missing or incomplete data — Document gaps and their potential impact on conclusions. Provide ranges instead of point estimates.
  • Outliers skewing results — Report with and without outliers. Document the decision to include or exclude.
  • Changing data definitions mid-period — Split analysis at the change boundary and note the schema difference.

Changelog

  • v1.0.0 — Initial release

리뷰

아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.

댓글

로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.

보내면 바로 공개됩니다. 이메일 주소나 전화번호 같은 개인 정보는 쓰지 마세요. URL은 2개까지입니다.

0 / 1,000자

이 양식은 reCAPTCHA로 보호되며 Google 개인정보처리방침 및 서비스 약관이 적용됩니다.

같은 저장소의 스킬

Design rigorous A/B test plans with hypothesis, sample size calculation, Minimum Detectable Effect (MDE), randomization strategy, and decision rules. Includes guardrail metrics and rollout playbook. Use when planning product experiments, conversion optimization, or data-driven feature decisions.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

Review REST and GraphQL API designs for consistency, usability, and best practices. Covers naming conventions, versioning strategy, error format, pagination, authentication patterns, and breaking change detection. Use when reviewing API specs, designing new APIs, or auditing existing endpoints.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

Write Architecture Decision Records (ADRs) following the Michael Nygard format. Captures context, options considered, decision rationale, and consequences. Use when making technology choices, framework selections, or any architectural decision that future developers need to understand.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

Assess organizational readiness for financial audits (internal or external). Map assertions to account balances, check evidence completeness, score readiness using a Red/Amber/Green framework, and generate a remediation timeline. Aligned with SOX, IFRS, and GAAP audit standards. Use before scheduled audits or when preparing for first-time compliance.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

Design safe recurring Codex automations with clear prompts, outputs, schedules, and gating rules.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

Refine Product Backlog Items to meet INVEST criteria. Write User Stories with Acceptance Criteria in Given/When/Then format, estimate with Story Points, and flag dependencies. Use before sprint planning when backlog items need grooming. Do not use to prioritize the backlog — that is the Product Owner's decision.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

hoavdc의 스킬 모두 보기

이 스킬의 문제 신고