codexkit-risk-register

Build and maintain a project Risk Register per PMBOK 8 Risk Performance Domain. Identify risks, assess probability and impact, define response strategies, and track residual risk. Use throughout the project lifecycle — not just at planning. Do not use for operational incident response or security vulnerability scanning.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

설치 방법 보기

포함된 파일(2)

  • SKILL.md4.3 KB
  • agents/openai.yaml167 B

SKILL.md(원문)

설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.

Risk Register Manager

Purpose

Systematically identify, assess, and manage project risks using a structured register with probability/impact scoring and defined response strategies.

When to use

  • project kick-off to establish the initial risk baseline
  • sprint or milestone reviews to update and add emerging risks
  • before major decisions to assess risk exposure
  • when stakeholders request a risk assessment report

When not to use

  • live incident response or post-mortem analysis
  • security vulnerability scanning (use security tools)
  • personal task risk assessment

Inputs

  • project scope, objectives, and constraints
  • project type (predictive / adaptive / hybrid)
  • stakeholder list and their risk tolerance
  • known assumptions and dependencies
  • lessons learned from similar projects (if available)

Procedure

  1. Identify risks using multiple sources:
    • Internal: technical complexity, resource gaps, schedule pressure, budget
    • External: market shifts, regulatory changes, vendor reliability, geopolitical
    • PMBOK 8 emphasis: sustainability risks (ESG, climate, social impact)
    • Techniques: brainstorming, PESTLE analysis, Risk Breakdown Structure (RBS)
  2. Assess each risk qualitatively:
    • Probability: Very Low (0.1) / Low (0.3) / Medium (0.5) / High (0.7) / Very High (0.9)
    • Impact: Very Low (0.05) / Low (0.1) / Medium (0.2) / High (0.4) / Very High (0.8)
    • Risk Score = Probability × Impact
    • Red zone (≥ 0.25): immediate response required
    • Yellow zone: response plan needed
    • Green zone: monitor only
  3. Define response strategy:
    • For threats: Avoid / Transfer / Mitigate / Accept (active or passive)
    • For opportunities: Exploit / Share / Enhance / Accept
  4. Assign ownership — every risk has one named owner.
  5. Track residual risk — after response, re-score to verify reduction.
  6. SAFe integration — for SAFe teams, use ROAM board:
    • R = Resolved | O = Owned | A = Accepted | M = Mitigated

Output

  • risk register table: ID | Category | Description | Trigger | Probability | Impact | Score | Owner | Response Strategy | Residual Risk | Status
  • risk heat map summary (red/yellow/green distribution)
  • top 10 risks with detailed response plans
  • escalation list for sponsor or steering committee
  • risk trend over time (risk burn-down if tracked across sprints)

Definition of done

  • every identified risk has a probability, impact, and score
  • every red/yellow risk has a named owner and defined response strategy
  • residual risk is assessed for all mitigated risks
  • register is reviewable by stakeholders

Examples

  • "Build an initial risk register for a 6-month ERP migration project."
  • "Update the risk register after Sprint 5 — add 3 new risks we discovered."
  • "We have 15 risks but no response plans. Help me define strategies for the top 10."

Quality Criteria

  • All dependencies and prerequisites are documented
  • Changes are reversible or include a rollback plan
  • Security implications are assessed for each configuration change
  • Monitoring and alerting are defined for post-deployment validation

Verification (4C)

CheckQuestion
CorrectnessAre all configurations, permissions, and dependencies accurate?
CompletenessDoes the setup cover dev, staging, and prod environments as needed?
Context-fitIs the solution proportional to the problem (not over/under-engineered)?
ConsequenceIf deployed as-is to production, what is the highest-risk failure mode?

Edge Cases

  • Target environment has pre-existing configuration — Scan for conflicts before applying changes. Document what to preserve.
  • Permissions differ between environments — Test in staging first. Document the minimum permissions required.
  • Third-party service is unavailable or deprecated — Document fallback or alternative. Include health-check endpoints.

Changelog

  • v1.0.0 — Initial release

리뷰

아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.

댓글

로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.

보내면 바로 공개됩니다. 이메일 주소나 전화번호 같은 개인 정보는 쓰지 마세요. URL은 2개까지입니다.

0 / 1,000자

이 양식은 reCAPTCHA로 보호되며 Google 개인정보처리방침 및 서비스 약관이 적용됩니다.

같은 저장소의 스킬

Design rigorous A/B test plans with hypothesis, sample size calculation, Minimum Detectable Effect (MDE), randomization strategy, and decision rules. Includes guardrail metrics and rollout playbook. Use when planning product experiments, conversion optimization, or data-driven feature decisions.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

Review REST and GraphQL API designs for consistency, usability, and best practices. Covers naming conventions, versioning strategy, error format, pagination, authentication patterns, and breaking change detection. Use when reviewing API specs, designing new APIs, or auditing existing endpoints.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

Write Architecture Decision Records (ADRs) following the Michael Nygard format. Captures context, options considered, decision rationale, and consequences. Use when making technology choices, framework selections, or any architectural decision that future developers need to understand.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

Assess organizational readiness for financial audits (internal or external). Map assertions to account balances, check evidence completeness, score readiness using a Red/Amber/Green framework, and generate a remediation timeline. Aligned with SOX, IFRS, and GAAP audit standards. Use before scheduled audits or when preparing for first-time compliance.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

Design safe recurring Codex automations with clear prompts, outputs, schedules, and gating rules.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

Refine Product Backlog Items to meet INVEST criteria. Write User Stories with Acceptance Criteria in Given/When/Then format, estimate with Story Points, and flag dependencies. Use before sprint planning when backlog items need grooming. Do not use to prioritize the backlog — that is the Product Owner's decision.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

hoavdc/CodexKit252026년 10월 11일 업데이트

hoavdc의 스킬 모두 보기

이 스킬의 문제 신고