dod-rio

Knowledge base from the DoD Risk, Issue, and Opportunity (RIO) Management Guide for Defense Acquisition Programs (OUSD R&E, Sep 2023 incl. Change 2.2). Use for the defense-acquisition mechanics of program risk management: the RIO definitions (risk/issue/opportunity), the five-step risk process (plan-identify-analyze-mitigate-monitor), 1-5 likelihood/consequence scoring and the 5x5 risk matrix, the four mitigation options (accept/avoid/transfer/control), burn-down plans, issue management (probability=1), opportunity management toward should-cost, cross-program/interface risk, tailoring RIO to the six AAF acquisition pathways (UCA/MTA/MCA/Software/DBS/Services), specialized methods (RMF, MBCRA/Cyber Table Top, Agile metrics, FMECA, ITRA/DTRAM), and institutionalizing RIO via the PRMP, boards (RMB/JRMB/ROMB/RWG), tools, tiered roles, and WBS/IMP/IMS/EVM/TPM integration. This is the DoD-acquisition complement to nasa-risk (general CRM/RIDM theory) and dau-se-guidebook (the SE process frame). Does NOT teach general risk theory from scratch, and defers specialized risk regimes (system safety/ESOH, HSI, detailed cyber/RMF, spectrum) to their own DoD instructions and the relevant packs.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

설치 방법 보기

포함된 파일(14)

  • SKILL.md17.4 KB
  • chapters/ch01-dod-rio-foundations.md11.9 KB
  • chapters/ch02-dod-rio-risk-identification-analysis.md17.4 KB
  • chapters/ch03-dod-rio-mitigation-monitoring-issues.md14.9 KB
  • chapters/ch04-dod-rio-opportunity-cross-program.md11.9 KB
  • chapters/ch05-dod-rio-aaf-pathways-hardware.md14.2 KB
  • chapters/ch06-dod-rio-aaf-pathways-software-services.md16.3 KB
  • chapters/ch07-dod-rio-additional-methods.md16.3 KB
  • chapters/ch08-dod-rio-process-roles-se-tools.md14.1 KB
  • cheatsheet.md7.8 KB
  • glossary.md9.0 KB
  • LICENSE2.2 KB
  • PACK.yaml1.6 KB
  • patterns.md8.3 KB

SKILL.md(원문)

설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.

<!-- argument-hint: [RIO definition, five-step process, likelihood/consequence scoring, risk matrix, mitigation option, burn-down, issue, opportunity, cross-program, AAF pathway, RMF/cyber/ITRA, PRMP/board/role, chapter number] -->

DoD Risk, Issue, and Opportunity (RIO) Management Guide

Source: OUSD R&E (US Government work, public domain; Distribution A) | Chapters: 8

When to use

Use this skill to run program risk, issue, and opportunity management on a U.S. defense acquisition program: defining and scoring risks, choosing and burning down mitigations, managing realized issues, hunting opportunities toward should-cost, containing cross-program interface risk, tailoring the whole effort to the chosen Adaptive Acquisition Framework (AAF) pathway, layering in specialized risk methods, and institutionalizing it all through the program's plan, boards, tools, roles, and cost/schedule/technical artifacts. This is the DoD-acquisition rendering of risk management — the program-office mechanics that sit on top of the general continuous-risk-management theory in nasa-risk and inside the SE process frame in dau-se-guidebook.

Prerequisites: none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.

How to Use This Skill

  • Without arguments — load the core frameworks below: the three RIO objects, the five-step process, likelihood/consequence scoring and the matrix, the four mitigation options, and the institutional machinery.
  • With a topic — ask about a scoring rule (consequence = max-of-three, unmitigated), a mitigation option (accept/avoid/transfer/control), a burn-down plan, issue or opportunity management, cross-program tripwires, an AAF pathway (UCA/MTA/MCA/Software/DBS/Services), or a specialized method (RMF, Cyber Table Top, ITRA/DTRAM, FMECA).
  • With a chapter — ch02 (identify + analyze + scoring), ch03 (mitigate/monitor/issues), ch04 (opportunity + cross-program), ch05/ch06 (RIO by AAF pathway), ch08 (PRMP/boards/roles/tool integration).

Supporting files: glossary.md, patterns.md, cheatsheet.md.

One discipline, three faces, two complements. Risk, issue, and opportunity are managed as one family with a shared register and shared boards. The guide is guidance, not mandate — recommended practice for AAF programs, used with DoDI 5000.02, not a mandatory checklist. Read it with nasa-risk (the general method) and dau-se-guidebook (the SE process), which it specializes rather than replaces.

Core Frameworks & Mental Models

The three RIO objects (the diagnostic lens)

The guide reduces the whole domain to three diagnostic questions, each a distinct managed object tied to the cost / schedule / performance baseline:

  • Risk — what can go wrong? A possible future event/condition that could harm objectives; characterized by likelihood AND consequence.
  • Issue — what has gone, or will certainly go, wrong? A realized or near-certain negative event (likelihood = 5 / probability = 1); characterized by consequence only.
  • Opportunity — what can be improved? A potential future benefit; the upside mirror of risk, the engine for reaching should-cost (vs. merely staying inside will-cost).

The central stance: the worth of risk management comes from a PM who thinks critically and grows a risk-aware culture, not from satisfying policy. Plans over process — the individual mitigation plans (the output) matter more than the machinery; drop any step that doesn't add value, and never "shoot the messenger."

The five-step risk process

Plan → Identify → Analyze → Mitigate → Monitor
       └────────── continuous Communication & Feedback ──────────┘

The same steps apply across every life-cycle phase and every AAF pathway; only the detail of each action changes. The PM owns it (jointly led with the LSE); it is multidisciplinary (SE, T&E, EVM, production, QA, logistics) and runs top-down and bottom-up at once.

Scoring: 1–5 ordinal, max-of-three, unmitigated

  • Likelihood 1–5 against probability bands (Table 2-2); consequence 1–5 against tailored criteria (Table 2-1, anchored to the MCA pathway).
  • Consequence = the maximum of cost/schedule/performance impact — never an average — assessed as if fully realized with no further mitigation, using fully burdened costs. A KPP/APB threshold breach forces Level 5.
  • No fractional scores (2.4 is invalid). Government and contractor use a common framework so disagreements are visible and comparable, not forced into consensus.
  • The 5×5 risk matrix maps likelihood × max-consequence to Low (green)/Moderate (yellow)/High (red). Risk level ≠ priority — also weigh cost-effectiveness, time frame, inter-risk relationships, and EMV/ROI, but always rank KPP-threatening risks high. Model aggregate exposure with Monte Carlo SRA/CRA.
  • The risk register (built early) is the single source of truth; risk/issue/opportunity registers may be combined.

The four mitigation options

Every controlled risk gets Accept · Avoid · Transfer · Control (or a hybrid):

OptionEssenceWatch-out
AcceptBear it but keep tracking (Watch Item)Pre-identify resources if realized; acceptance ≠ ignoring
AvoidAlternate path / defer / substitute mature techDefer only if system would ship without it
TransferReassign (MOA/MOU)Hardest; never fully removes Government exposure
ControlDrive likelihood/consequence downDefault; must be real reduction, not relabeled baseline work

A burn-down plan (six steps) makes a Control plan trackable: sequence → make objective/measurable → assign planned L/C → date → load into IMS → chart level vs. time. Required for all high/moderate and selected low risks. Meetings don't burn down risk — results do. Front-load high-consequence risks.

Issues and opportunities (the mirrors)

  • Issue management mirrors the risk loop but drops the likelihood axis (probability = 1): score consequence, assign an RMB owner, plan a corrective action / POA&M with an EAC in the IMS, re-assess for spawned risks. Options are mainly Ignore (after a business case) or Control.
  • Opportunity management is the proactive twin: a six-activity loop (plan → identify → analyze [business case] → decide → monitor → feedback), with options Pursue / Defer / Reevaluate / Reject. Spending effort raises the likelihood of a good event (the inverted lever). Aggregate small wins; reject short-term-gain/long-term-loss candidates.

Cross-program / interface risk

When a system depends on hardware/software/schedules owned by other programs, the interfaces are a primary risk source owned by no one. Contain with a designated technical authority, MOAs carrying cost/schedule/performance tripwires, an ICWG, ICDs/IRSs, synchronized schedules, an integration plan, and giver–receiver deliverables tracked in the IMS. Escalate early up PM → PEO → SAE → DAE; refer requirements disputes to the CSB. Reconcile SWAP-C across the seam.

RIO is tailored to the AAF pathway

There is no single DoD risk process — the pathway pre-sets the risk posture, and tailoring is fine adjustment:

  • UCA (<2 yr, DoDI 5000.81) — accepts deficiencies for speed; ends in a disposition analysis.
  • MTA (2–5 yr, DoDI 5000.80) — fails early and descopes; op demo ≥1 yr before completion.
  • MCA (milestone-driven, DoDI 5000.85) — front-loads hard decisions, picks the entry milestone by where risk lives, burns down Technology/Engineering/Integration risk in TMRR while money is cheap, and gates with SETRs (ASR/SRR/SFR/PDR → CDR/TRR/SVR/FCA/PRR → OTRR/IOT&E/PCA) plus TRA/MRA/SRA.
  • Software (DoDI 5000.87) — automation/continuous-test/cyber up front; MVP→MVCR; User Agreement; technical-debt tracking.
  • DBS (DoDI 5000.75) — fit a commercial product to re-engineered processes via fit-gap; ATP gates.
  • Services (DoDI 5000.74) — the requirement is the risk; seven steps, ARRT→PWS/QASP, CPARS.

Contract type follows the risk profile — risk is never fully transferred to industry (the Government still needs the product).

Specialized methods feed the enterprise register

Each is a sensor for a risk class the general process won't surface; funnel each back into one register with a common consequence language (roll micro-risks up, decompose macro-risks down): RMF (DoDI 8510.01; 7 steps; tiered per NIST SP 800-39), MBCRA / Cyber Table Top (DoDI 5000.89; mission-framed cyber), Agile metrics (Size/Time/Effort/Defects), FMECA on the digital model (DoDI 5000.88), ITRA/DTRAM (8 risk areas × 7 factors), and S&T/program protection (DoDI 5000.83).

Institutionalization

RIO becomes durable machinery: the PRMP (written at formulation, refreshed at life-cycle events); boards — PM-chaired RMB, JRMB for mutual Government–contractor risk, ROMB when it also handles opportunities, chartered RWGs; an early, SEP-documented tool (Project Recon / Active Risk Manager / Risk Exchange); tiered roles with the non-negotiable rule that every risk has an owner; and traceability into WBS (MIL-STD-881F), IMP/IMS, EVM (EIA-748), and TPMs (DoDI 5000.02, kept SMART). A mitigation not tied to a funded work package and a schedule activity is aspiration, not management.


Chapter Index

#SectionKey content
ch01RIO FoundationsPurpose/scope; risk vs. issue vs. opportunity definitions; guidance-not-mandate; PM ownership; plans-over-process; deferred specialized regimes
ch02Risk: Plan, Identify, AnalyzeFive-step process; PRMP/SEP; risk categories (Technical/Programmatic/Business); risk statement; 1–5 scoring; risk matrix; register; EMV; aggregate/Monte Carlo
ch03Mitigation, Monitoring & IssuesFour options (accept/avoid/transfer/control); six-step burn-down; monitoring against EVM/IMS/TPM; issue management (probability = 1)
ch04Opportunity & Cross-ProgramOpportunity loop and should-cost; opportunity register; RMB/ROMB; interface risk; MOAs/tripwires; ICWG; SWAP-C; escalation chain
ch05RIO by AAF Pathway (UCA/MTA/MCA)Pathway as pre-set risk dial; MCA entry-by-risk; SETR gates; TRA/MRA/SRA; framing assumptions; contract type; disposition analysis
ch06RIO by AAF Pathway (Software/DBS/Services)Software pipeline/MVP→MVCR/User Agreement; DBS fit-gap and ATP gates; Services seven steps/ARRT/QASP/CPARS
ch07Additional MethodsRMF (7 steps, NIST 800-39 tiers); MBCRA/Cyber Table Top; Agile metrics (Size/Time/Effort/Defects); Digital Engineering/FMECA; ITRA/DTRAM; S&T protection
ch08Process, Roles & SE/PM ToolsPRMP outline; RMB/JRMB/ROMB/RWG; Service tools; tiered roles; WBS/IMP/IMS/EVM/TPM integration; SRA/CRA/PRA; DCMA 14-point; UAV-jammer example

Topic Index

  • AAF pathways (selecting/tailoring) → ch05, ch06, cheatsheet
  • Aggregate / compounding risk (Monte Carlo) → ch02, ch08
  • Burn-down plan / chart → ch03, ch08, cheatsheet
  • Business / External risk → ch02
  • Consequence (max-of-three, unmitigated, fully burdened) → ch02, cheatsheet
  • Contract type as a risk instrument → ch05, ch08
  • Cross-program / interface risk; MOAs; tripwires; ICWG; SWAP-C → ch04
  • Cyber Table Top (CTT) / MBCRA → ch07, ch06
  • DCMA 14-point schedule metrics / schedule health → ch08
  • Digital Engineering / FMECA → ch07
  • DTRAM (8 areas × 7 factors) / ITRA → ch07
  • EMV / ROI prioritization → ch02
  • Escalation chain (PM→PEO→SAE→DAE) / CSB → ch04
  • Framing assumptions → ch05
  • Issue management (probability = 1; Ignore/Control; POA&M/EAC) → ch03
  • Likelihood (1–5 bands) → ch02
  • Mitigation options (accept/avoid/transfer/control) → ch03, cheatsheet
  • Monitoring (EVM/IMS/TPM, trend matrix) → ch03, ch08
  • Opportunity management / should-cost vs. will-cost → ch04, cheatsheet
  • PRMP (plan, outline, refresh triggers) → ch01, ch02, ch08
  • Risk vs. issue vs. opportunity (definitions) → ch01, cheatsheet
  • Risk categories (Technical/Programmatic/Business) → ch02
  • Risk matrix (5×5) → Low/Moderate/High → ch02, cheatsheet
  • Risk register (single source of truth, combined) → ch02, ch08
  • Risk statement (event+consequence+cause; if–then) → ch02
  • RMB / JRMB / ROMB / RWG (boards & working groups) → ch02, ch03, ch08
  • RMF (7 steps; Assess Only; NIST SP 800-39 tiers) → ch07
  • Roles (Executive/Management/Working; every risk has an owner) → ch08
  • SETRs (ASR/SRR/SFR/PDR/CDR/TRR/SVR/FCA/PRR/OTRR/PCA) → ch05
  • Software pathway (MVP→MVCR, User Agreement, technical debt) → ch06
  • SRA / CRA / PRA (indicators, not verdicts) → ch08, ch02
  • Tailoring (drop steps that don't add value) → ch01, ch05
  • Tools (Project Recon / Active Risk Manager / Risk Exchange) → ch08
  • TRA / MRA (readiness assessments) → ch05
  • WBS / IMP / IMS / EVM / TPM integration → ch08

Supporting Files

  • glossary.md — RIO terms (boards, scores, pathways, tools, methods), alphabetical, with chapter references
  • patterns.md — 11 reusable techniques (write a risk statement, score, classify, pick a mitigation, build a burn-down, manage issues/opportunities, contain cross-program risk, tailor to pathway, funnel specialized methods, institutionalize) with When/How/Trade-offs
  • cheatsheet.md — the three RIO objects, scoring rules, mitigation/issue/opportunity options, AAF pathway → posture table, specialized-methods table, institutionalization, and tells & smells

Scope & Limits

Covers: program risk, issue, and opportunity management for U.S. defense acquisition programs per the DoD RIO Management Guide (Sep 2023, incl. Change 2.2) — the RIO definitions; the tailorable five-step risk process; 1–5 likelihood/consequence scoring, the 5×5 matrix, EMV/ROI, and aggregate Monte Carlo analysis; the four mitigation options and the six-step burn-down; issue management (probability = 1); opportunity management toward should-cost; cross-program/interface risk; RIO tailoring across all six AAF pathways; the specialized methods (RMF, MBCRA/CTT, Agile metrics, DE/FMECA, ITRA/DTRAM, S&T protection) as risk sensors; and institutionalization via the PRMP, boards, tools, tiered roles, and WBS/IMP/IMS/EVM/TPM integration.

Does not cover in depth (deferred by the source to its own authorities): general risk theory and continuous-risk-management method built from scratch (use nasa-risk); the broader SE process model RIO sits inside (use dau-se-guidebook); system safety / ESOH and hazard analysis (DoDI 5000.88, MIL-STD-882 — see mil-std-882 / system-safety packs); Human Systems Integration (DoDI 5000.95 — see nasa-hsi); the full cybersecurity RMF control workflow and SP 800-53 catalog (DoDI 8510.01 / NIST — see nist-800-37, nist-sse); electromagnetic spectrum/E3 (DoDI 4650.01 / 3222.03); Technology Readiness Assessment depth (see gao-tra); and modular-open-systems detail (see dod-mosa). It is guidance, not mandatory policy, and is thin on worked numeric examples beyond the single Appendix-D UAV-jammer walkthrough.

Jurisdiction: U.S. DoD work, public domain (Distribution A — approved for public release, distribution unlimited). Recommended guidance for AAF acquisition programs; used alongside DoDI 5000.02 and Military Department direction.

Source version: DoD Risk, Issue, and Opportunity Management Guide for Defense Acquisition Programs, OUSD R&E, September 2023, Incorporating Change 2.2 (December 2023).

리뷰

아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.

댓글

로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.

보내면 바로 공개됩니다. 이메일 주소나 전화번호 같은 개인 정보는 쓰지 마세요. URL은 2개까지입니다.

0 / 1,000자

이 양식은 reCAPTCHA로 보호되며 Google 개인정보처리방침 및 서비스 약관이 적용됩니다.

같은 저장소의 스킬

Signpost (not a knowledge pack) for the automotive standards landscape: ISO 26262, ASPICE, SAE J3016, UNECE R155, UNECE R156, and the NHTSA vehicle set. Contains NO source content: designation, edition, owner, status, and an official catalogue URL only. Use when you need to identify or locate an automotive standard. Most are paywalled or carry no redistribution grant and cannot be packaged; the one open path is the nhtsa-vehicle pack.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

jgsystemsconsulting/jgs-se-knowledge-packs82026년 10월 15일 업데이트

Signpost (not a knowledge pack) for the avionics development assurance standards landscape: RTCA DO-178C / EUROCAE ED-12C and its supplements (DO-330/ED-215, DO-331/ED-218, DO-332/ED-217, DO-333/ED-216); RTCA DO-254 / EUROCAE ED-80; SAE ARP4754B and ARP4761A; and the free regulator documents that recognise them (FAA AC 20-115D, AC 20-152A, Order 8110.49A; EASA AMC 20-115D and AMC 20-152A). Contains no source content: each row carries only the designation, title, edition, owner, redistributability status, and the owner's URL. Use when you need to identify, cite, or locate an avionics standard; paywalled rows point to the owner, free rows point to the regulator text, and the FAA rows also name the in-repo faa-8110-49 pack.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

jgsystemsconsulting/jgs-se-knowledge-packs82026년 10월 15일 업데이트

cisa-cpg

무료

Knowledge base from CISA Cross-Sector Cybersecurity Performance Goals 2.0. Use for prioritized IT/OT baseline cyber goals aligned to NIST CSF 2.0 (including GOVERN), critical-infrastructure hygiene, MSP/supply-chain expectations, and board-friendly outcome language. Covers CPG 2.0 goals only; does not replace full CSF programs, sector-specific goals (SSGs), or CSET tooling detail.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

jgsystemsconsulting/jgs-se-knowledge-packs82026년 10월 15일 업데이트

Knowledge base from DAFMAN 63-119 (15 April 2021), Mission-Oriented Test Readiness Certification. Use for continuous MOTRC replacing single-point OTRR thinking: framework/applicability, Certification Official vs PM roles, review cycle and exit criteria, certification memo/decertify gates, DT&E/contractor evidence, ITT integration and cyber resiliency, and the 31-template matrix. DAF T&E readiness process only—does not replace DoDI 5000.89, AFI 99-103, or multi-service lead policies.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

jgsystemsconsulting/jgs-se-knowledge-packs82026년 10월 15일 업데이트

Knowledge base from the DoD Systems Engineering Guidebook (OUSD R&E, February 2022). Use for the DoD SE process model — the 16 SE processes (8 technical management + 8 technical) mapped to ISO/IEC/IEEE 15288, the event-driven technical reviews and audits across the Major Capability Acquisition life cycle (ASR, SRR, SFR, PDR, CDR, SVR/FCA, PRR, PCA), the Systems Engineering Plan (SEP), risk/issue/opportunity management, TPMs and leading indicators, system-of-systems and digital engineering, and the 24 design considerations (RAM, system safety, HSI, system security engineering, MOSA, supportability, etc.). Acquisition-program oriented: thin on detailed cost estimating, contracting law, and non-DoD or commercial life cycles.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

jgsystemsconsulting/jgs-se-knowledge-packs82026년 10월 15일 업데이트

Knowledge pack from 'Towards Digital Engineering: The Advent of Digital Systems Engineering' (Huang et al., Old Dominion University, arXiv:2002.11672, 2020). Use when reasoning about digital engineering, the DoD Digital Engineering Strategy and its five goals, the Authoritative Source of Truth, digitalization vs. digitization, digital augmentation, digitalized models, provenance, unique identification, and the four-level (vision/strategy/action/foundation) DSE research framework. Covers the conceptual/vision layer of the field. SCOPE LIMITS: this is a single ~28-page vision paper, not a methods handbook — it is thin on step-by-step procedures, tooling, case studies, and quantitative evaluation, and it predates 2020 so it does not cover later digital-engineering standards or recent AI/LLM advances. Use the sebok pack for established SE canon and MBSE depth.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

jgsystemsconsulting/jgs-se-knowledge-packs82026년 10월 15일 업데이트

jgsystemsconsulting의 스킬 모두 보기

이 스킬의 문제 신고