본문으로 건너뛰기
cccskills
무료GitHub에 공개

anthropic-os

Use when a personal or team operating system needs a bounded redesign using Four-C, closed-loop controls, 70/30 allocation, 3B creativity, experiments, and prediction-error learning.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

Mark393295827/third-brain-v7-skills스타 141(GitHub 141 + cccskills 0)

실행 점수 미검증

설치 방법 보기

포함된 파일(2)

  • SKILL.md6.3 KB
  • references/operating-system-playbook.md3.1 KB

SKILL.md(원문)

설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.

Anthropic OS

<skill_contract> <input>One owned work system with its workflow, users, traces, permissions, metrics, constraints, and review horizon.</input> <output>A supervised operating-system redesign with one bounded experiment, control gates, cadence, and rollback.</output> <done>The selected practice has a baseline, hypothesis, owner, metric, guardrail, budget, stop rule, and review receipt.</done> <non_goals>Extreme productivity claims, surveillance, automatic policy evolution, or cadence without supporting context and capability.</non_goals>

Redesign one work system as a supervised learning loop. Plasticity means practices may change from evidence; competition means alternatives contend; constraint means attention, time, permissions, and review bandwidth shape the design. Load references/operating-system-playbook.md for diagnostics and artifacts.

Usage Template

Provide: system boundary, owner, desired outcome, users, current workflow, local metrics, traces/data, permissions, failure history, review capacity, and horizon.

Workflow

<intake>

Define one operating bottleneck and baseline. Run Four-C in order: Context (truth/history), Connections (systems/accounts), Capabilities (skills/SOPs/evals), Cadence (triggers/reviews). Do not add automation cadence until the first three can support and verify it.

</intake>

<unknowns_gate>

Treat productivity multipliers, culture narratives, maturity scores, and vendor case claims as hypotheses until local evidence exists. If outcome owner, trace consent, or approval authority is absent, return NEEDS_INPUT. Do not infer the expansion of local labels such as CASH when the system has not defined them.

</unknowns_gate>

<execute>
  1. Audit the closed loop: trace substrate, DRI, custom taste/eval, review bandwidth, prediction, feedback latency, and quiet-success stop.
  2. Choose one flywheel and its bottleneck; allocate roughly 70% to a validated big bet and 30% to business-as-usual/option preservation only when local constraints justify it.
  3. Apply 3B: Bending adapts a practice to context, Breaking removes a limiting rule or metric through an approved experiment, Blending combines mechanisms across domains.
  4. Generate alternatives, then select one two-week-or-shorter experiment with hypothesis, owner, cohort, metric, guardrail, budget, stop, and rollback.
  5. Run dual prediction when useful: human and agent predict outcome independently; compare actual result, record prediction error, and update decision weights only after repeated calibrated evidence.
  6. Add a success-disaster pre-mortem: what breaks if adoption or throughput exceeds expectations; define load, quality, permission, support, and rollback controls.
  7. Escalate permission through observe -> co-drive -> scoped reversible action -> monitored routine -> audited autonomy. Keys and environment enforce boundaries.
  8. Review evidence; keep, adapt, retire, or combine the practice. No automatic archival or policy installation: human approval and the promotion gate govern system changes.

Use independent evaluation for organizational, cultural, or high-impact recommendations. A rollback restores the prior practice/config while retaining evidence and decision history.

</execute> <evaluate>

Compare baseline and outcome on the named metric and guardrails. Inspect operator comprehension, review load, false positives, prediction calibration, and unintended incentives. Reject “success” when throughput rises but quality, agency, privacy, or local understanding falls.

</evaluate>

<retry_policy>

max_attempts: 2 per practice experiment. Retry only after changing the hypothesis, constraint, cohort, or mechanism. Stop on repeated signature, weak feedback, review overload, guardrail regression, or NO_PROGRESS.

</retry_policy>

<state_contract>

Persist {run_id, status, attempt, budget, evidence, unknowns, last_error, next_action} plus system boundary, Four-C audit, maturity evidence, flywheel/bottleneck, allocation, predictions, experiment version, metrics/guardrails, consent/approval, independent review, rollback point, and promotion decision.

</state_contract>

Failure Protocol

  • NEEDS_INPUT: owner, consent, outcome, or approval authority is missing.
  • INSUFFICIENT_EVIDENCE: a maturity/policy claim lacks local observations.
  • BLOCKED_PERMISSION: trace or delegated action exceeds authorized access.
  • VERIFY_FAILED: outcome, guardrail, comprehension, or calibration check fails.
  • NO_PROGRESS: changed experiments repeat the failure. max_attempts: 2.
  • BUDGET_STOP: preserve the prior operating system and return a supervised next test.

Output Contract

Return status, result (diagnosis, one redesigned loop, experiment, and review decision), evidence, unknowns, and next_action including approval or rollback.

Edge Cases

  • Leadership requests autonomous cadence but source context is stale: improve Context and Capabilities first; do not schedule theater.
  • A practice increases output while reviewers cannot explain changes: trigger quiet-success stop, reduce volume, and restore understanding before scaling.

Success Metrics

  • One owned bottleneck, experiment, feedback signal, and review date are explicit.
  • Local evidence, not borrowed multipliers, drives maturity and allocation decisions.
  • The operating system improves while agency, privacy, quality, and comprehension remain within guardrails.

Quality Gates

  • Four-C order, DRI, trace consent, eval, and review budget are explicit.
  • 3B changes are experiments, not automatic policy mutations.
  • Independent review, human approval, and rollback match impact.
  • Prediction errors and superseded practices remain auditable.
  • Promotion requires repeated support/local verification and a cheap check.

</skill_contract>

리뷰

아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.

댓글

로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.

보내면 바로 공개됩니다. 이메일 주소나 전화번호 같은 개인 정보는 쓰지 마세요. URL은 2개까지입니다.

0 / 1,000자

이 양식은 reCAPTCHA로 보호되며 Google 개인정보처리방침 및 서비스 약관이 적용됩니다.

같은 저장소의 스킬

Use when work has genuinely independent streams or distinct builder, evaluator, domain, and integration roles that require bounded multi-agent command scaled from 5 to 100+ agents.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

Mark393295827/third-brain-v7-skills1412026년 9월 19일 업데이트

Use when designing or refactoring a model-native engineering workflow with bounded autonomy, probes, custom evaluation, durable state, and verified write-back.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

Mark393295827/third-brain-v7-skills1412026년 9월 19일 업데이트

Use when property-service operations need an AI plus ontology plus DMAIC design for work orders, dispatch, quotes, evidence, CTQ metrics, and control dashboards.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

Mark393295827/third-brain-v7-skills1412026년 9월 19일 업데이트

Use when a goal must be converted into a repeatable behavior, cue, SOP, review cadence, and identity-aligned reinforcement.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

Mark393295827/third-brain-v7-skills1412026년 9월 19일 업데이트

Use when source material must be transformed into a compact, evidence-aware model for learning, decisions, or an Obsidian concept note.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

Mark393295827/third-brain-v7-skills1412026년 9월 19일 업데이트

Use when a long-running agent task needs context budgeting, checkpointing, compaction, retrieval, or capability-based model routing.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

Mark393295827/third-brain-v7-skills1412026년 9월 19일 업데이트

Mark393295827의 스킬 모두 보기

이 스킬의 문제 신고