본문으로 건너뛰기
cccskills
무료GitHub에 공개

risk-register

Maintain a centralized living risk register across projects. Use this skill when: - You need to create or update a risk register for a project or feature - You want to consolidate risks from individual specs into one register - You need to review and update risk status, mitigations, and owners - You want a cross-project risk view

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

설치 방법 보기

포함된 파일(1)

  • SKILL.md2.7 KB

SKILL.md(원문)

설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.

Risk Register

Centralized risk register that consolidates risks from individual spec sections into one living document.

Workflow

  1. Determine scope — Single spec, single project, or cross-project
  2. Read Risks and Assumptions from relevant specs
  3. If existing register exists, read and merge (don't duplicate — match by description)
  4. Assess each risk using the likelihood x impact matrix
  5. Output register

Risk Assessment Matrix

Likelihood: Low (unlikely) | Medium (possible) | High (probable) Impact: Low (minor inconvenience) | Medium (feature degradation) | High (critical failure/data loss)

Low ImpactMedium ImpactHigh Impact
High LikelihoodMediumHighCritical
Medium LikelihoodLowMediumHigh
Low LikelihoodLowLowMedium

Output Format

# Risk Register — {Scope}

**Last Updated:** {DD-MM-YYYY}
**Total Risks:** {n} | Open: {n} | Mitigated: {n} | Closed: {n}

## Risk Summary

| ID | Risk | Source | Likelihood | Impact | Priority | Owner | Mitigation | Status | Last Reviewed |
|----|------|--------|-----------|--------|----------|-------|-----------|--------|--------------|
| R-001 | {desc} | {spec/feature} | H/M/L | H/M/L | Critical/High/Med/Low | {name/role} | {plan} | Open/Mitigated/Closed | {date} |

## Critical Risks
{Filtered view of Critical priority — requires immediate attention}

## Risk Trends
- New risks this period: {n}
- Risks closed this period: {n}
- Overdue reviews: {risks not reviewed in 30+ days}

Rules

  • Every risk MUST have an owner (name or role, not "TBD")
  • Every risk MUST have a mitigation plan (not empty)
  • Review date updates when risk is revisited
  • Risk IDs are sequential (R-001, R-002) and never reused
  • When merging with existing register, preserve existing IDs
  • Separate risks from assumptions — only risks go in the register

Anti-Patterns

  • Don't create a risk without a mitigation plan — "TBD" is not acceptable
  • Don't reuse risk IDs — closed risks keep their IDs
  • Don't mix risks and assumptions — they're different things

Quality Checklist

  • Every risk has an owner
  • Every risk has a mitigation plan
  • Likelihood x Impact matrix applied
  • Critical risks highlighted
  • Risk IDs are sequential and unique

리뷰

아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.

댓글

로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.

보내면 바로 공개됩니다. 이메일 주소나 전화번호 같은 개인 정보는 쓰지 마세요. URL은 2개까지입니다.

0 / 1,000자

이 양식은 reCAPTCHA로 보호되며 Google 개인정보처리방침 및 서비스 약관이 적용됩니다.

같은 저장소의 스킬

Rate any product, feature, or experience on the 11-star scale (Brian Chesky's Airbnb thought experiment). Use when user says "rate this experience", "11-star", "star rating", "experience audit", "how good is this", "experience rating", "product audit", "quality assessment", or wants to evaluate product quality and identify improvement paths. Also trigger when user wants to benchmark a feature, assess where a product stands, or map out what "great" looks like - even if they don't explicitly say "11-star".

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

qa-aman/claude-skills212026년 10월 19일 업데이트

Generate A/B copy variants grounded in Eugene Schwartz's awareness and market-sophistication stages and John Caples' tested-headline discipline. Every variant declares its angle, the awareness stage it targets, and a falsifiable hypothesis, and the skill recommends which pair to test first and what delta counts as signal. Use when the user says "A/B test this", "write variants", "give me options", "test different angles", "copy variants", "ab copy", "test this headline", "multiple versions", "which version is better", or wants to test copy before publishing. For reviewing copy that already exists, see copy-review. For sample size and stopping rules, see growth-experiment. For diagnosing a page rather than its words, see page-cro. For full paid ad sets by platform, see ad-campaign-writer.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

qa-aman/claude-skills212026년 10월 19일 업데이트

Design statistically rigorous experiments to test data science hypotheses. Use when the user says "design an A/B test", "run an experiment", "test this hypothesis", "is this difference significant", "how many samples do I need", "randomized controlled trial", "causal inference", "uplift test", "holdout group", "significance test", "power calculation", "avoid p-hacking", or needs to determine whether an observed effect is real before making a product or model decision. For lean build-measure-learn product experiments without the statistics, use experiment-design instead.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

qa-aman/claude-skills212026년 10월 19일 업데이트

Write measurable acceptance criteria for requirements or user stories. Use when the user says "write acceptance criteria", "definition of done", "how do we test this", "fit criteria", "given when then", "Gherkin scenarios", "what does done look like", "testable conditions", "how will we know this works" - even if they don't explicitly say "acceptance criteria".

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

qa-aman/claude-skills212026년 10월 19일 업데이트

Build a strategic account plan for winning, retaining, or expanding a named account. Use when the user says "build an account plan", "strategic account planning", "how do I grow this account", "account expansion strategy", "whitespace analysis", "QBR prep", "key account review", "map the stakeholders in this account", "land and expand plan", "how do I break into [company]", or wants a structured strategy for a specific account.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

qa-aman/claude-skills212026년 10월 19일 업데이트

Write paid ad copy for LinkedIn, Google, Meta, and YouTube. Produces multiple variants per platform, each targeting a different Eugene Schwartz awareness level and Cialdini persuasion principle. Use when the user asks for ad copy, ad variants, "write LinkedIn ads", Google ads, Meta ads, paid social copy, ad headlines, or wants creative for a paid campaign. Reads brand voice, ICP, and positioning from knowledge/. For organic social posts, see linkedin-post or social-calendar. For the landing page the ad points at, see landing-page-writer. For testing variants, see ab-copy-writer.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

qa-aman/claude-skills212026년 10월 19일 업데이트

qa-aman의 스킬 모두 보기

이 스킬의 문제 신고