This skill should be used when creating comprehensive project plans for system development or implementation projects. Use this skill when you need to create Project Charters, Project Plans, WBS, Gantt Charts, RACI matrices, Risk analysis, or other PMBOK-aligned project management artifacts. Outputs are in Markdown format with Mermaid diagrams for visualizations. Leverages comprehensive PM knowledge base in references/ directory (544KB, 11 files) including PMBOK standards, Software/SaaS best practices, IT industry guidance, and specialized PM methodologies.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
설치 방법 보기설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.
This skill transforms project requirements and stakeholder needs into comprehensive, PMBOK-aligned project management artifacts. It guides you through charter creation, scope definition, WBS development, scheduling with Gantt charts, resource planning with RACI matrices, and risk management planning.
Primary language: Japanese (default) with English support Output format: Markdown + Mermaid diagrams Framework alignment: PMBOK® Guide (6th, 7th, 8th editions)
Use this skill when:
Create a formal document that authorizes the project, names the project manager, and gives authority to apply resources to project activities. The charter establishes the partnership between the performing organization and requesting organization.
Collect information from stakeholders:
Use references/project_charter_guide.md Section 3 structure:
プロジェクトの背景:
プロジェクトの目的:
Use references/project_charter_guide.md Section 4:
In Scope(含まれる内容):
Out of Scope(含まれない内容):
主要な成果物:
| 成果物 | 説明 | 納期 |
|--------|------|------|
| 要件定義書 | 機能要件・非機能要件を網羅 | M1完了時 |
| 基本設計書 | システム全体のアーキテクチャ | M2完了時 |
| 本番システム | 稼働可能なシステム | M5完了時 |
プロジェクトマイルストーン:
概算予算:
| カテゴリ | 概算金額(円) | 内訳 |
|---------|--------------|------|
| 開発費用 | 80,000,000 | 人件費(1,000人日 × 80,000円) |
| インフラ費用 | 15,000,000 | サーバー、クラウド、ライセンス |
| 間接費用 | 5,000,000 | PM、QA、予備費 |
| **合計** | **100,000,000** | 税抜 |
ステークホルダー:
| 役割 | 氏名/部署 | 期待値・関心事 |
|------|----------|--------------|
| Executive Sponsor | 山田太郎(経営企画部長) | プロジェクト成功、ROI達成 |
| Product Owner | 佐藤花子(営業部長) | 業務効率化、使いやすさ |
| Project Manager | 鈴木一郎(IT部) | スケジュール・予算管理 |
主要なリスク:
| リスク | 影響 | 確率 | 対策 |
|--------|------|------|------|
| 要件変更が頻発 | 高 | 中 | スコープ変更管理プロセス確立 |
| キーメンバーの離脱 | 高 | 低 | 知識移転・ドキュメント化 |
| 技術的課題 | 中 | 中 | PoC実施、技術検証期間確保 |
Use references/project_charter_guide.md Section 11:
成功基準:
Use references/project_charter_guide.md as the complete template with all 12 sections.
Define what is included and excluded from the project, create a detailed WBS, and establish scope change control processes.
Expand the high-level scope from the charter into detailed scope statement:
プロジェクトスコープ記述書:
## 製品スコープ(Product Scope)
システムが提供する機能・特性:
- 顧客管理機能(登録、検索、編集、削除)
- 受注管理機能(見積作成、受注登録、進捗管理)
- 在庫管理機能(入出庫管理、在庫照会、棚卸)
- レポート機能(売上レポート、在庫レポート)
- ユーザー管理機能(認証、権限管理)
## プロジェクトスコープ(Project Scope)
プロジェクトで実施する作業:
- 要件定義、設計、実装、テスト
- データ移行(既存システムからのデータ移行)
- ユーザートレーニング(3回、各2時間)
- ドキュメント作成(設計書、運用マニュアル、ユーザーガイド)
Use Mermaid to visualize scope boundaries:
graph TB
A[プロジェクトスコープ] --> B[In Scope]
A --> C[Out of Scope]
B --> B1[システム開発<br/>顧客・受注・在庫管理]
B --> B2[データ移行<br/>既存DBから新DB]
B --> B3[トレーニング<br/>3回実施]
B --> B4[ドキュメント<br/>設計書・マニュアル]
C --> C1[既存システム保守<br/>並行稼働中のサポート]
C --> C2[ハードウェア調達<br/>IT部が別途対応]
C --> C3[組織変更<br/>業務部門が実施]
C --> C4[カスタマイズ<br/>稼働後の追加開発]
Create hierarchical decomposition of project work. Use assets/project_plan_template.md Section 4 as reference.
WBS Example with Mermaid:
graph TD
A[ECサイト構築プロジェクト] --> B[1. 要件定義]
A --> C[2. 設計]
A --> D[3. 実装]
A --> E[4. テスト]
A --> F[5. デプロイ]
A --> G[6. PM]
B --> B1[1.1 現状分析]
B --> B2[1.2 機能要件定義]
B --> B3[1.3 非機能要件定義]
B --> B4[1.4 要件レビュー]
C --> C1[2.1 基本設計]
C --> C2[2.2 詳細設計]
C --> C3[2.3 DB設計]
C --> C4[2.4 設計レビュー]
D --> D1[3.1 フロントエンド開発]
D --> D2[3.2 バックエンド開発]
D --> D3[3.3 DB構築]
D --> D4[3.4 統合]
Detailed WBS Table:
| WBS ID | タスク名 | 成果物 | 担当 | 期間 |
|--------|---------|--------|------|------|
| 1 | 要件定義 | 要件定義書 | BA | 20日 |
| 1.1 | 現状分析 | 現状分析レポート | BA | 5日 |
| 1.2 | 機能要件定義 | 機能要件一覧 | BA/PO | 10日 |
| 1.3 | 非機能要件定義 | 非機能要件書 | BA/Arch | 5日 |
| 2 | 設計 | 設計書 | Arch/Tech Lead | 30日 |
| 2.1 | 基本設計 | 基本設計書 | Arch | 15日 |
| 2.2 | 詳細設計 | 詳細設計書 | Tech Lead | 10日 |
| 2.3 | DB設計 | DB設計書 | DBA | 5日 |
Document the approved scope baseline consisting of:
変更管理プロセス:
graph TD
A[変更要求提出] --> B[変更要求記録]
B --> C{軽微な変更?}
C -->|Yes<br/>工数5人日以下| D[PM承認]
C -->|No<br/>工数5人日超| E[影響分析実施]
E --> F[スコープ・スケジュール・コストへの影響評価]
F --> G[CCB審議]
G --> H{承認?}
H -->|Yes| I[スコープベースライン更新]
H -->|No| J[却下/保留]
I --> K[変更実施]
D --> K
J --> L[要求者へ通知]
K --> L
Create a detailed project schedule with task dependencies, resource assignments, and critical path visualization using Mermaid Gantt charts.
For each WBS work package, define specific activities:
Identify dependencies using:
Use three-point estimation:
例: フロントエンド開発
- 楽観値(Optimistic): 15日
- 最頻値(Most Likely): 20日
- 悲観値(Pessimistic): 30日
PERT推定値 = (15 + 4×20 + 30) / 6 = 20.83日 ≈ 21日
Use assets/project_plan_template.md Section 5 structure:
Note: 以下は EC サイト構築プロジェクトのサンプルスケジュール。日付は実際のプロジェクトに合わせて変更すること。
gantt
title ECサイト構築プロジェクトスケジュール
dateFormat YYYY-MM-DD
section 要件定義
現状分析 :a1, 2025-04-01, 10d
機能要件定義 :a2, after a1, 15d
非機能要件定義 :a3, after a1, 10d
要件レビュー :milestone, after a2 a3, 0d
section 設計
基本設計 :b1, after a2 a3, 20d
詳細設計 :b2, after b1, 15d
DB設計 :b3, after b1, 10d
設計レビュー :milestone, after b2 b3, 0d
section 実装
フロントエンド開発 :c1, after b2, 30d
バックエンド開発 :c2, after b2, 35d
DB構築 :c3, after b3, 15d
統合 :c4, after c1 c2 c3, 10d
コードレビュー :milestone, after c4, 0d
section テスト
単体テスト :d1, after c1 c2, 15d
統合テスト :d2, after c4, 20d
システムテスト :d3, after d2, 15d
受け入れテスト :d4, after d3, 10d
テスト完了 :milestone, after d4, 0d
section デプロイ
本番環境構築 :e1, after d3, 5d
データ移行 :e2, after d4, 5d
本番リリース :milestone, after e1 e2, 0d
トレーニング :e3, after d4, 10d
Analyze the Gantt chart to identify critical path:
Mark critical path activities and focus management attention on these.
Apply schedule compression techniques if needed:
Define project team structure, assign roles and responsibilities, and create RACI matrix to clarify accountability.
プロジェクト体制:
| 役割 | 氏名 | 責任範囲 | 稼働率 |
|------|------|---------|--------|
| Executive Sponsor | 山田太郎 | 意思決定、予算承認 | 5% |
| Product Owner | 佐藤花子 | 要件定義、優先順位決定 | 50% |
| Project Manager | 鈴木一郎 | 全体管理、進捗管理 | 100% |
| Technical Lead | 田中次郎 | 技術アーキテクチャ、技術的意思決定 | 80% |
| Business Analyst | 高橋三郎 | 要件分析、業務フロー設計 | 100% |
| Senior Engineer × 3 | [氏名] | 設計、実装、コードレビュー | 100% |
| QA Engineer × 2 | [氏名] | テスト計画、テスト実施 | 100% |
Use assets/project_plan_template.md Section 7 structure:
RACI Matrix:
| タスク/成果物 | Sponsor | PO | PM | Tech Lead | BA | SE | QA |
|-------------|---------|----|----|-----------|----|----|-----|
| プロジェクト計画 | A | C | R | C | C | I | I |
| 要件定義 | I | A | C | C | R | I | I |
| 基本設計 | I | C | A | R | C | I | I |
| 詳細設計 | I | I | A | R | I | C | C |
| 実装 | I | I | A | R | I | R | I |
| 単体テスト | I | I | A | C | I | R | C |
| 統合テスト | I | C | A | C | I | C | R |
| 受け入れテスト | I | A | R | I | C | I | R |
| 本番リリース | A | C | R | R | I | C | C |
凡例:
R (Responsible) = 実行責任者
A (Accountable) = 説明責任者(最終意思決定者)
C (Consulted) = 相談先(事前に意見を聞く)
I (Informed) = 報告先(結果を報告)
コミュニケーション計画:
| 活動 | 頻度 | 参加者 | 目的 | 形式 |
|------|------|--------|------|------|
| キックオフミーティング | 初回のみ | 全員 | プロジェクト開始、目標共有 | 対面 |
| 週次進捗会議 | 毎週月曜 | PM, TL, BA | 進捗確認、課題共有 | オンライン |
| ステアリングコミッティ | 月1回 | Sponsor, PO, PM | 意思決定、方向性確認 | 対面 |
| デイリースタンドアップ | 毎朝 | 開発チーム | 日次進捗、障害共有 | オンライン |
| ステータスレポート | 毎週金曜 | 全ステークホルダー | 進捗・課題・リスク報告 | メール |
graph TD
A[Executive Sponsor<br/>山田太郎] --> B[Product Owner<br/>佐藤花子]
A --> C[Project Manager<br/>鈴木一郎]
C --> D[Technical Lead<br/>田中次郎]
C --> E[Business Analyst<br/>高橋三郎]
C --> F[QA Lead<br/>伊藤四郎]
D --> G[Senior Engineer × 3<br/>設計・実装]
D --> H[Mid Engineer × 2<br/>実装・単体テスト]
F --> I[QA Engineer × 2<br/>テスト設計・実施]
Identify potential risks, analyze their impact and probability, plan response strategies, and establish monitoring processes.
Use brainstorming, checklists, and historical data. Categorize risks:
技術リスク:
スコープ/要件リスク:
リソースリスク:
統合リスク:
外部リスク:
For each identified risk, assess:
リスク登録簿:
| ID | リスク | カテゴリ | 確率 | 影響 | レベル | トリガー |
|----|--------|---------|------|------|--------|---------|
| R-01 | 要件変更が頻発 | 要件 | 高 | 高 | 高 | ステークホルダーからの追加要望 |
| R-02 | キーメンバー離脱 | リソース | 低 | 高 | 中 | メンバーの退職意向 |
| R-03 | 性能要件未達 | 技術 | 中 | 高 | 高 | 負荷テストで性能不足判明 |
| R-04 | データ移行失敗 | 統合 | 中 | 高 | 高 | データ整合性エラー |
| R-05 | 外部API変更 | 外部 | 低 | 中 | 低 | ベンダーからの変更通知 |
For each high/medium risk, plan response strategy:
対応戦略:
リスク対応計画:
| ID | リスク | 対応戦略 | 対応策 | 担当 | コスト |
|----|--------|---------|--------|------|--------|
| R-01 | 要件変更頻発 | 軽減 | 変更管理プロセス確立、スコープベースライン承認 | PM | 0円 |
| R-02 | キーメンバー離脱 | 軽減 | ドキュメント化、ペアプログラミング、知識共有 | PM/TL | 予算の5% |
| R-03 | 性能要件未達 | 軽減 | 早期PoC実施、アーキテクチャレビュー | TL | 予算の3% |
| R-04 | データ移行失敗 | 軽減 | 移行リハーサル実施、ロールバック計画 | DBA | 予算の2% |
| R-05 | 外部API変更 | 受容 | アダプターパターンで疎結合化、予備費確保 | TL | 予算の1% |
Use assets/project_plan_template.md Section 8 Mermaid diagram:
graph LR
A[リスク識別] --> B[リスク分析]
B --> C[リスク対応計画]
C --> D[リスク監視]
D --> E{リスク発生?}
E -->|Yes| F[対応措置実施]
E -->|No| D
F --> G[効果測定]
G --> D
D --> H{新リスク?}
H -->|Yes| A
H -->|No| D
リスクレビュー頻度:
Establish communication protocols, reporting structures, and quality assurance processes to ensure stakeholder alignment and deliverable quality.
Analyze each stakeholder group:
Use assets/project_plan_template.md Section 9:
| 情報 | 発信者 | 受信者 | 頻度 | 方法 | 目的 |
|------|--------|--------|------|------|------|
| ステータスレポート | PM | Sponsor, PO, 全員 | 週次 | メール | 進捗・課題・リスク報告 |
| 進捗会議議事録 | PM | 参加者全員 | 週次 | Confluence | 決定事項・アクション記録 |
| リスク登録簿 | PM | Sponsor, PO, TL | 週次 | Excel/Jira | リスク状況共有 |
| 変更要求ログ | PM | CCB | 随時 | 変更管理システム | 変更要求追跡 |
| テストレポート | QA Lead | PM, PO, TL | フェーズ毎 | PDF | 品質状況報告 |
品質基準:
## コード品質
- コードカバレッジ: 80%以上
- 複雑度(Cyclomatic Complexity): 10以下
- コードレビュー: 全コードを2名以上でレビュー
- 静的解析: SonarQubeでバグ・脆弱性ゼロ
## テスト品質
- 単体テストカバレッジ: 80%以上
- 統合テスト: 全APIエンドポイントをテスト
- システムテスト: 全機能要件をテスト
- 受け入れテスト: ビジネスシナリオ100%実施
## ドキュメント品質
- すべての設計書をレビュー・承認
- API仕様書の自動生成(Swagger/OpenAPI)
- 運用マニュアルのユーザーレビュー実施
graph LR
A[設計] --> B[設計レビュー]
B --> C{承認?}
C -->|No| A
C -->|Yes| D[実装]
D --> E[コードレビュー]
E --> F{承認?}
F -->|No| D
F -->|Yes| G[単体テスト]
G --> H[静的解析]
H --> I{品質基準達成?}
I -->|No| D
I -->|Yes| J[統合テスト]
受け入れ基準:
| 成果物 | 受け入れ基準 | 検証方法 | 承認者 |
|--------|------------|---------|--------|
| 要件定義書 | すべての要件が記載され、POが承認 | レビュー会議 | PO |
| 基本設計書 | アーキテクチャが明確、非機能要件を満たす設計 | 設計レビュー | Tech Lead |
| ソースコード | カバレッジ80%以上、レビュー承認済み | 自動テスト、レビュー | Tech Lead |
| テストレポート | 全テストケース実施、重大バグゼロ | テスト結果確認 | QA Lead |
| 本番システム | 受け入れテスト合格、性能要件達成 | UAT、性能テスト | PO |
Integrate all planning artifacts into a cohesive, comprehensive project plan document using the template.
Use assets/project_plan_template.md as the base template with 12 sections:
Section 1 - プロジェクト基本情報: From Project Charter, fill in:
Section 3 - Scope with Mermaid: Use the scope boundary diagram created in Workflow 2
Section 4 - WBS with Mermaid: Use the WBS hierarchy diagram from Workflow 2
Section 5 - Gantt Chart: Use the Mermaid Gantt chart from Workflow 3
Section 7 - RACI Matrix: Use the RACI matrix from Workflow 4
Section 8 - Risk Management: Use the risk register and monitoring process from Workflow 5
Section 9 - Communication Plan: Use the communication matrix from Workflow 6
Section 10 - Quality Plan: Use the quality standards and QA process from Workflow 6
Customize the template with project-specific:
Ensure all Mermaid diagrams render correctly:
Checklist:
Submit the project plan for review:
Incorporate feedback and obtain formal approval.
Once approved:
This skill includes a comprehensive PM knowledge base in references/ (544KB, 11 files) covering:
For detailed resource catalog and usage examples, see references/knowledge_base_guide.md.
project_charter_guide.md: Comprehensive guide for creating PMBOK-compliant project charters
knowledge_base_guide.md: PM knowledge base catalog and usage guide
generate_project_charter.py: Generate project charter Markdown skeleton
python3 scripts/generate_project_charter.py --project "ECサイト構築" --pm "鈴木花子" --start-date 2026-04-01 --end-date 2026-11-30 --budget 100000000 --output /tmp/charter.mdgenerate_wbs.py: Generate WBS template in Markdown with Mermaid diagram
python3 scripts/generate_wbs.py --project "ECサイト構築" --phases "要件定義,基本設計,詳細設計,実装,テスト,デプロイ" --output /tmp/wbs.mdproject_plan_template.md: Complete project plan template with Mermaid diagrams
gantt - プロジェクトスケジュールgraph TD/LR - WBS、プロセスフロー、スコープ境界graph TD - チーム体制図このスキルの目的は、PMBOK準拠の包括的なプロジェクト計画を作成し、プロジェクト成功の基盤を構築することです。
아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.
로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.
아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.
Track and update action item status from natural language updates like 'Seanのメールには返信しておいた' or 'Lu対応予定'. Integrates with daily-comms-ops workflow. Use when managing action items across communication channels.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
AI活用提案の専門コンサルタントスキル。LLM・AIエージェントの活用事例知識を基に、業界別、部門別、シーン別に最適なAI導入提案を行います。システム化、業務改善、効率化を得意とし、具体的な活用事例、期待効果、導入ステップを含む実践的な提案を提供します。Use when proposing AI/LLM adoption strategies for specific industries, departments, or business scenarios.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Generate AI-powered BPO service proposals for Japanese companies in the US market. Use when creating outsourcing proposals with AI service menus, ROI estimation, implementation roadmaps, and bilingual (JA/EN) proposal documents for 在米日系企業向けAI実装.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
AI(LLM)が生成した日本語テキストの「AI臭」を検出・診断し、人間らしい文章にリライトするスキル。 Use when: 「AIっぽい文章を直して」「人間らしくリライトして」「AI臭を消して」「この文章をもっと自然にして」 「テキストのAI感を減らして」「機械っぽさを取りたい」 "make this sound more human", "remove AI tone", "humanize this text", "detect if this is AI-generated". 6つのAI特有パターン(視覚的マーカー、単調なリズム、マニュアル的構成、非コミット姿勢、抽象語の濫用、 定型メタファー)を正規表現ベースで検出し、0-100のAI臭スコアを算出。3つの人間化技法 (バランスを崩す・客観を崩す・論理を崩す)でリライトを実行する。 Note: 検出スクリプトは日本語テキスト専用。英語テキストの場合はClaude自身がreferences/を参照して分析・リライトする。
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Generate audit-ready internal control design documents from As-Is business process inventories. Produces control IDs, assertion mappings, procedures, SoD analysis, KPIs, materiality thresholds, and implementation roadmaps. Use when building internal controls for new audit engagements, SOX/J-SOX compliance, or process improvement initiatives.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Review audit-related documents (control design documents, bottleneck analyses, requirements definitions, etc.) for quality, scoring them 0-100 with a severity-rated findings list. Use when reviewing audit documents, checking control design quality, or verifying cross-document consistency. Supports documents governed by US GAAP, IFRS, or J-GAAP.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.