Before committing to a plan or launch, assume it already failed and reason backward through concrete causes — convert failure paths into mitigations, gates, and stop checks.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

설치 방법 보기

포함된 파일(1)

  • SKILL.md3.6 KB

SKILL.md(원문)

설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.

Pre-Mortem Analysis

Core rule: Prospective hindsight beats "what could go wrong?" Assume the plan has already failed (past tense), generate concrete failure paths, reverse them into prevention requirements, and bind each top path to a verifiable plan change.

When to Use

  • Before kickoff, major technical commitment, high-risk sprint work, launch, or release.
  • After a plan looks solid but before execution, especially when optimism or overconfidence is likely.
  • When a decision is costly to reverse and risks are still implicit rather than enforced.

When NOT to Use

  • Work is small, local, and cheaply reversible — skip the ceremony.
  • You are mid-incident under time pressure — act now (OODA / scientific method); pre-mortem is pre-execution.
  • You would only emit generic risks ("scope creep", "requirements unclear") that do not bind to this plan.
  • Risks are already enforced by live gates (CI, canary, rollback, alerts) with no residual unlisted path.
  • A mature risk register already covers the same specific failure paths with owners and checks.

Procedure

  1. Set the failure frame in past tense: "It is [post-deadline date]. The plan failed: [rollback / data loss / no adoption / SLA breach]." Explaining a happened failure is required; predicting one is not enough.
  2. Generate failure reasons before filtering: sweep technical, process, assumptions, dependencies/external, and people. Force a second pass: "What did the plan most need to be true that was not?" Collect breadth first (aim for many distinct reasons); do not rank mid-sweep.
  3. Prioritize: group by theme; score likelihood × impact; keep the top 3–5 concrete risks (drop generics that do not bind).
  4. Failure-first reverse analysis (absorbed reverse path): for each top risk, (a) restate the failed outcome in past tense, (b) list necessary/enabling conditions that had to be true for that failure, (c) invert each condition into a verifiable prevention requirement (avoid/require rule + check), (d) bind owner, verification checkpoint, and ship/stage gate.
  5. Mitigate and update the plan: for each top risk, attach mitigation steps, spike/contingency if needed, and the reverse-analysis prevention requirements as explicit plan gates. A pre-mortem with no plan change is incomplete.
  6. Stop when top risks each have a bound mitigation or prevention gate, or when further reasons are only generic restatements — then ship the updated plan, do not keep brainstorming.

Output

  1. Failure scenario — past-tense disaster frame with date and failed outcome.
  2. Failure reasons — unfiltered list, then prioritized top 3–5 with likelihood × impact.
  3. Reverse paths — for each top risk: necessary conditions → inverted prevention requirements.
  4. Mitigations — owner, verification checkpoint, ship/stage gate per top risk.
  5. Plan deltas — concrete tasks, spikes, contingencies, and gates added to the plan.

Verification

  • Falsify/stop: if no plan-specific failure path can be stated in past tense with necessary conditions, stop — you are generating theater, not risk. If a "mitigation" has no verification checkpoint, it is not done.
  • Over-application guard: do not pre-mortem reversible chores, mid-incident firefighting, or systems that already enforce the same paths. Do not leave abstract risks as "mitigate later"; either invert them into gates or drop them as non-actionable.

리뷰

아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.

댓글

로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.

보내면 바로 공개됩니다. 이메일 주소나 전화번호 같은 개인 정보는 쓰지 마세요. URL은 2개까지입니다.

0 / 1,000자

이 양식은 reCAPTCHA로 보호되며 Google 개인정보처리방침 및 서비스 약관이 적용됩니다.

같은 저장소의 스킬

Use when search or investigation could run forever. Set an explicit good-enough threshold first, then stop at the first option that clears it.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tjboudreaux/cc-thinking-skills1.7천2026년 8월 8일 업데이트

Use when a specific claim may lack grounding. Check evidence boundary, size wrongness cost, then answer, fetch, or abstain — never confabulate.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tjboudreaux/cc-thinking-skills1.7천2026년 8월 8일 업데이트

When the right response mode is unclear, classify the cause-effect domain first; decompose disorder.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tjboudreaux/cc-thinking-skills1.7천2026년 8월 8일 업데이트

Under genuine uncertainty with no reliable forecast, inventory means, cap downside at affordable loss, act for commitments, and let goals emerge from controllable moves.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tjboudreaux/cc-thinking-skills1.7천2026년 8월 8일 업데이트

When a constraint is treated as fixed, separate physics from convention, keep only independently supported primitives, and rebuild the simplest solution that satisfies real constraints.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tjboudreaux/cc-thinking-skills1.7천2026년 8월 8일 업데이트

When a fault is localized and the proximate cause is known but the systemic root is not, chain evidence-linked whys with a counterfactual stop and a countermeasure.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tjboudreaux/cc-thinking-skills1.7천2026년 8월 8일 업데이트

tjboudreaux의 스킬 모두 보기

이 스킬의 문제 신고