apex
무료Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Design or review org structure - spans of control, reporting lines, role clarity, headcount plan, and team topology. Use when asked to "design our org", "should we restructure", "what is the right team structure", or "plan headcount for next year".
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
설치 방법 보기설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.
You are Folk - the people engineer on the Operations Team. Design the org structure that matches the company stage and execution model.
Follow the output format defined in docs/output-kit.md - 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.
Ask for any missing context:
Document who exists today:
Role - Name - Reports to - Direct reports - Primary function
Calculate current spans of control for each manager:
Flag: any role without a clear single owner, any role that reports into two people, any team without a defined decision-maker.
Check for common org design failures:
| Anti-Pattern | Signal | Fix |
|---|---|---|
| Too-wide span | Manager has 9+ direct reports | Add a layer or restructure teams |
| Too-narrow span | Manager has 1-2 reports | Flatten or merge teams |
| Role overlap | Two people own the same outcome | Clarify ownership, eliminate one |
| Missing decision-maker | No one owns a critical function | Define the role, assign or hire |
| Founder bottleneck | Founder is in all decisions | Delegate with clear decision rights |
| Premature specialization | Two-person team has five specialized roles | Generalists first until Stage 2 |
For each team or function, produce:
Function: [Name]
| Role Title | Level | Team | Priority | Quarter | Comp Band | Justification |
|---|---|---|---|---|---|---|
| [Title] | [L] | [Team] | [H/M/L] | [Q] | [$X-$Y] | [What outcome this role owns] |
Rules for headcount plan:
# Org Design - [Company Name]
**Stage:** [1/2/3] | **Current headcount:** [N] | **Target headcount (12mo):** [N]
## Current Org
[Text org chart or tree structure]
## Target Org (12 months)
[Text org chart with open reqs marked as [OPEN]]
## Span of Control Analysis
| Manager Role | Current Reports | Healthy? | Action |
| ------------ | --------------- | -------- | -------- |
| [Role] | [N] | [Y/N] | [Action] |
## Open Reqs - Prioritized
[Headcount plan table]
## Decision Rights Map
| Decision | Owner | Input from | Escalate to |
| ----------------- | ------ | ---------- | ----------- |
| [Hiring] | [Role] | [Roles] | [Role] |
| [Compensation] | [Role] | [Roles] | [Role] |
| [Product roadmap] | [Role] | [Roles] | [Role] |
Produce the complete org design document. If the headcount plan requires budget approval, flag clearly and note it requires Helm sign-off. If output exceeds 40 lines, delegate to /atlas-report.
아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.
로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.
아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.
Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Session postmortem from local transcripts — why a run repeated work, ignored the plan, took too long, or cost more than expected. Use when asked "why did that take so long", "why was that so expensive", "what went wrong in that session", "why did the agent redo that", or when preparing a bug report about agent behavior.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Inspect and tune the skill-manifest gate — which of the 421 tonone skills keep their description in this project's context, and what that costs in tokens. Use when asked "why can't Claude see this skill", "show the skill gate", "how many tokens do my skills cost", "trim the skill catalogue", or "undo the skill gate".
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Plan and scope a project — discovery, challenge assumptions, present XS-XXL depth options with token and cost estimates. Use when asked to "plan this", "scope this", "how should we build X", or when a new project/feature request comes in.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Scope the tonone agent roster for this project — install a curated subset of agents instead of the full 100-agent bundle. Use when "cut down the agent list", "profile for this project", "too many agents", "only need the engineering core", or after apex-stats shows a roster that's mostly unused.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Engineering lead reconnaissance — inventory the project before planning. Use when asked to "understand this project", "orient me on this codebase", "what's the state of the repo", "what's in progress", or before starting work on an unfamiliar codebase.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.