本文へ移動
cccskills

「headcount」の検索結果

204 件 ・ 関連度順

概要と使いどころ

Makes technical debt visible and decidable — distinguishing real debt from mess, quantifying its cost, and arguing for remediation in business terms. Use this to assess and prioritize debt, decide whether to fix or live with something, justify remediation work to non-engineers, or plan a migration off a system nobody wants to touch.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Turns rough intent or a weak prompt into a reliable one — diagnosing why output is inconsistent, restructuring the instruction, and adapting it across models. Use this when a prompt is not producing what was wanted, when output varies run to run, when writing a prompt for a repeated task, when moving a prompt between models, or when someone describes what they want an AI to do and needs it written properly.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Manages the relationship with a represented workforce — administering a collective agreement, handling grievances, understanding what supervisors may and may not say, and preparing for bargaining. Use this for a grievance or arbitration question, a work rule change in a represented unit, supervisor guidance during organizing, contract interpretation and past practice, or preparation for negotiations.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Isolates feature work in its own branch or worktree and integrates it cleanly when done. Use this when starting work that should not disturb the current workspace, when several efforts must proceed in parallel on one repository, or when implementation is finished and the change needs merging, rebasing, or splitting for review.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Owns architecture, engineering delivery, infrastructure, data platform, and internal systems. Use this for build-versus-buy calls, technology selection, architectural direction, engineering capacity and delivery risk, technical debt tradeoffs, platform and tooling decisions, or when a technical choice has business consequences that need stating in business terms. Also use to judge whether a technical plan is sound before it is committed to.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Runs the loop from discovering a weakness to confirming it is fixed — scanning, triage, prioritization by real exploitability, remediation tracking, and patch policy. Use this to stand up or fix a vulnerability program, triage scanner output, decide what to fix first, set patch SLAs, handle a disclosure from an outside researcher, or report posture to leadership.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Verifies that work is actually complete before it is claimed to be — running the checks, reading the output, and confirming the original request was satisfied rather than approximated. Use this before saying something is done, fixed, or passing; before committing or opening a pull request; and whenever a claim of success has not been backed by command output.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Reviews a design or change for security before it ships — authentication and authorization, data handling, secrets, dependencies, and the secure-development practices around it. Use this to review an architecture or pull request for security, set secure coding standards, choose or tune SAST and DAST tooling, assess a third-party integration, or decide whether a design is safe to build.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Explores the problem and the range of possible approaches before any code is written — clarifying what is actually being asked, surfacing options with their tradeoffs, and converging on one. Use this at the start of any feature, component, or behavior change, when a request is ambiguous, when the first idea is the only idea on the table, or when a design decision needs pressure-testing before commitment.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Identifies what could go wrong in a system before it is built or changed — the assets worth attacking, the entry points, the trust boundaries, and the controls that actually address the realistic threats. Use this when designing a feature or system, when a change touches authentication, data handling, payments, or external input, before a security review, or when deciding which security work is worth doing at all.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Turns a spec or requirement into a written plan a separate session or agent can execute, then drives that plan through review checkpoints. Use this before touching code on any multi-step task, when work needs handing to someone else, when a task keeps sprawling mid-implementation, or when a plan exists and needs executing in order with verification between steps.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Runs environment, health and safety on an operating site — hazard controls in order of effectiveness, incident recording and reporting obligations, and safety measurement that does not reward silence. Use this to build or audit a safety program, decide what controls a hazard actually needs, work out whether an injury is recordable or reportable, investigate an incident, or fix safety metrics that have stopped producing reports.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Keeps production assets available — ranking equipment by consequence of failure, setting preventive and predictive intervals, sizing spares, and moving a plant off reactive maintenance. Use this to build or fix a maintenance program, decide what to put on a PM schedule, diagnose repeat failures on one asset, justify spares inventory, or work out why a plant that maintains everything still has unplanned downtime.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Designs worksheets, workbooks and practice material that actually teach — sequencing difficulty, managing cognitive load, writing instructions a child can follow unaided, and building answer keys that hold up. Use this to design or fix a worksheet or workbook, decide how much practice a skill needs, structure a page so it can be completed without an adult reading it aloud, or diagnose material that looks right and does not work.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Ships changes safely and often — pipelines, deployment strategies, feature flags, rollback, and database changes. Use this to design a deployment pipeline, reduce release risk, roll out a risky change gradually, plan a schema migration, or work out why releases are infrequent and frightening.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Designs AI systems, automations, and agent workflows for a business — identifying which manual work is worth automating, how to structure the system, which tools fit, and what could go wrong. Use this to automate part of an operation, design an agent or MCP workflow, reduce repetitive manual work, connect tools into a system, decide which automation to build first, or audit an automation that is not delivering.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Finds the root cause of a bug, test failure, or unexpected behavior before proposing any fix. Use this whenever something is broken and the cause is not yet proven — a failing test, a production error, intermittent behavior, or a symptom that appeared after a change. Also use when a fix has been attempted and did not work, or when the same bug keeps coming back.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Writes and revises agent skills so they trigger at the right moments and give usable instruction when they do. Use this when creating a new skill, editing an existing one, diagnosing a skill that fires too often or never fires, or reviewing a set of skills for overlap. Also use before adding to a skill library, to check the capability is not already covered.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Drives implementation by writing a failing test first, then the smallest code that passes it. Use this before writing implementation code for any feature or bugfix, when a bug needs a regression test, when existing code is hard to change safely, or when someone asks whether a change is covered. Also use to decide what is worth testing and what is not.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Builds what a sales team needs to sell — pitch decks, one-pagers, objection handling, competitive battlecards, demo scripts, and case studies. Use this to create or fix sales collateral, prepare for a competitive deal, build a demo flow, document objection responses, or diagnose why a pitch is not converting.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Plans and drives cross-functional programs to delivery — scope, sequencing, dependencies, status, risk, and the escalations that keep work moving. Use this to run a multi-team initiative, recover a program that is slipping, build a delivery plan with dependencies, structure status reporting, or diagnose why cross-team work keeps missing dates.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Produces design reference imagery before implementation — screen concepts, layout directions, and flows for web or mobile that make a verbal brief concrete enough to argue with. Use this when a brief needs visualizing before anyone builds, when comparing layout directions, when handing a developer a target, or when stakeholders are describing different things with the same words.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Designs slide decks and one-pagers that carry an argument rather than decorate one — deck structure, headlines that state the takeaway, charts that make a single point, and the different rules board decks and conference talks follow. Use this to build or fix a pitch deck, board deck, or conference talk, to design a one-pager, or when a deck is dense, unfocused, or being read aloud from the slides. For social graphics, carousels and infographics, use `marketing:visual-content` instead.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新

Plans and delivers a single project — scope, estimation, scheduling, critical path, tracking, and recovering when it slips. Use this to plan a project, build or challenge a schedule, estimate credibly, track progress meaningfully, or recover a project that is late.

日本語の概要は準備中です。原文の説明を表示しています。

cbrock84/headcount2,0422026年9月18日 更新