Expert-level spacecraft design covering mission analysis, subsystem design, power and thermal management, attitude control, communications, and systems engineering.
日本語の概要は準備中です。原文の説明を表示しています。
3 件 ・ 関連度順
概要と使いどころ
Expert-level spacecraft design covering mission analysis, subsystem design, power and thermal management, attitude control, communications, and systems engineering.
日本語の概要は準備中です。原文の説明を表示しています。
Knowledge base from the NASA Fault Management Handbook (NASA-HDBK-1002, Draft 2, April 2012). Use for the systems-engineering discipline of designing what a system does when it fails — the fault/failure/anomaly vocabulary, the five FM strategies (two prevention strategies — design-time fault avoidance and operational failure avoidance — plus three tolerance strategies — failure masking, failure recovery, and goal change), the six FM process activities across NASA mission phases Pre-A to E, response-latency-versus-time-to-criticality (TTC) design trades, fault/failure containment regions and FEPPs, the four redundancy approaches, top-down FM requirements development, FM verification vs. validation, the seven dedicated FM milestone reviews (FMCR/FMARR/FMPDR/FMCDR/FMTRR/FMLRR/FMCERR), FM organizational structure, and mined NASA Lessons Learned. Space-mission oriented (flight/ground/operations); spacecraft examples throughout. IMPORTANT: built from an UNAPPROVED DRAFT — several sections (detailed architecture building blocks, the Assessment & Analysis guidance, and Operations & Maintenance) are placeholders in the source and are thin here. Thin on detailed FDIR algorithms, terrestrial/IT fault management, and any approved-standard terminology that may have changed since Draft 2.
日本語の概要は準備中です。原文の説明を表示しています。
Use when designing ground station networks, scheduling satellite contacts, processing telemetry, commanding spacecraft, or analyzing link budgets. Use when "ground station, satellite contact, pass prediction, AOS, LOS, telemetry, commanding, uplink, downlink, antenna tracking, link budget, G/T, EIRP, " mentioned.
日本語の概要は準備中です。原文の説明を表示しています。