本文へ移動
cccskills
無料GitHub で公開

modeling-renewable-resource-yields

Builds renewable energy yield models with resource assessment, capacity factor analysis, and P50/P90 production estimates. Use when modeling wind/solar yields, analyzing resource data, or evaluating production uncertainty.

インストール方法を見る

含まれるファイル(1)

  • SKILL.md6.3 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Modeling Renewable Resource Yields

Builds renewable energy yield models with resource assessment, capacity factor analysis, and P50/P90 production estimates for wind, solar, and hybrid renewable projects.

When To Use

  • Underwriting a wind or solar asset acquisition and need independent yield expectations
  • Structuring project finance debt sizing around P50/P90 production scenarios
  • Comparing resource quality across candidate sites for development-stage projects
  • Stress-testing existing yield assumptions during due diligence or refinancing
  • Evaluating production shortfall risk for tax equity or hedge counterparty negotiations

Inputs To Gather

  • Resource data: TMY datasets (solar irradiance via NSRDB, Solargis, Meteonorm; wind speed/direction via reanalysis or on-site met mast data) — confirm measurement period length and data completeness percentage
  • Technology specs: Turbine power curves (cut-in/cut-out/rated speeds), module datasheets (STC rating, temperature coefficients, bifacial gain), inverter efficiency curves
  • Site parameters: Latitude/longitude, elevation, terrain roughness class, ground albedo, array layout and spacing, hub height or tracker configuration
  • Loss assumptions: Electrical losses, soiling, snow, shading, curtailment, grid availability, turbine/inverter availability, wake losses (wind), clipping (solar)
  • Degradation rates: Annual module degradation (typically 0.4–0.6%/yr for crystalline silicon), turbine performance degradation if applicable
  • Historical benchmarks: Operational production data from comparable nearby projects if available [VERIFY availability]

Workflow

  1. Assess resource quality

    • For solar: compile GHI/DNI/DHI data, confirm data source vintage and spatial resolution, identify inter-annual variability (coefficient of variation)
    • For wind: analyze wind speed distributions (Weibull k and A parameters), wind rose directionality, vertical shear exponent, turbulence intensity at hub height
    • Flag any measurement gaps exceeding 5% of the dataset and document gap-filling methodology
  2. Configure energy conversion model

    • Solar: run PVSyst-equivalent simulation — define system architecture (fixed-tilt vs. single-axis tracker), string sizing, GCR, backtracking algorithm, transposition model (Perez or similar)
    • Wind: apply power curve to wind speed distribution at hub height, account for air density correction, apply directional wake model (Jensen/Park or eddy-viscosity) for array losses
    • Document all software tools or analytical methods used [VERIFY against lender/investor IE standards]
  3. Apply loss stack

    • Build a transparent waterfall from gross-to-net production: availability → electrical → soiling → snow → shading → curtailment → grid limitation → other
    • Benchmark each loss factor against industry ranges (e.g., soiling 1–5% depending on region, inverter clipping 1–3% for typical DC/AC ratios)
    • Identify which losses are modeled deterministically vs. probabilistically
  4. Generate P-values and uncertainty analysis

    • Calculate P50 (median expected) net annual energy production (MWh/yr or GWh/yr)
    • Quantify uncertainty sources: resource inter-annual variability, measurement uncertainty, model uncertainty, long-term reference correlation uncertainty
    • Combine uncertainties (typically RSS for independent sources) to derive P75, P90, P95, P99 exceedance estimates
    • For debt sizing, confirm which P-value the lender requires (commonly P90 1-year or P99 1-year for merchant, P50 for equity base case) [VERIFY lender term sheet requirements]
  5. Derive capacity factor and benchmark

    • Calculate net capacity factor = net annual production / (nameplate capacity × 8,760 hours)
    • Compare against regional benchmarks: U.S. utility-scale solar typically 20–30% (location-dependent), onshore wind 25–45%, offshore wind 40–55% [VERIFY against current EIA/NREL reference data]
    • Flag any result outside ±10% of regional comps for further review
  6. Sensitize key drivers

    • Run sensitivities on: resource year variance (±1 standard deviation), degradation rate (±0.1%/yr), availability (base vs. stress), curtailment (0% to contractual cap)
    • Present tornado chart or scenario table showing production impact in MWh and revenue impact at contracted PPA price or merchant curve

Output

  • Yield summary table: Gross energy, loss waterfall, net energy (P50, P75, P90, P99), net capacity factor
  • Uncertainty breakdown: Tabulated sources of uncertainty with individual and combined sigma values
  • Sensitivity matrix: Key variable ranges and their impact on net production and DSCR (if debt-sized)
  • Resource data quality assessment: Data completeness, measurement period, correlation methodology, and any flags
  • Assumptions register: Every input assumption with source citation, date, and [VERIFY] tags where jurisdiction or contract-specific confirmation is needed

Quality Checks

  • Confirm gross-to-net loss stack sums correctly and no double-counting exists between loss categories
  • Verify P90/P50 ratio falls within expected range (typically 0.82–0.92 for solar, 0.75–0.88 for wind depending on resource variability)
  • Cross-check net capacity factor against NREL ATB or regional benchmarks — investigate deviations > 2 percentage points
  • Ensure degradation is applied consistently (year 1 vs. mid-life vs. levelized) and matches financial model convention
  • Validate that uncertainty sources are independent before applying RSS combination — correlated uncertainties require different treatment
  • Confirm units consistency throughout (kWh vs. MWh vs. GWh, AC vs. DC nameplate)
  • If operational data exists, compare modeled P50 to actual trailing-twelve-month production and explain variance

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Evaluates activist investor campaigns with thesis assessment, proposed changes, and likely outcome analysis. Use when analyzing activist situations, evaluating campaign theses, or assessing activist track records.

日本語の概要は準備中です。原文の説明を表示しています。

CaseMark/skills442026年9月9日 更新

Evaluates corporate vulnerability to shareholder activism with governance assessment, valuation gaps, and operational improvement opportunities. Use when assessing activist risk, identifying vulnerabilities, or preparing defensive analyses.

日本語の概要は準備中です。原文の説明を表示しています。

CaseMark/skills442026年9月9日 更新

Evaluates bolt-on acquisitions for existing platforms with strategic fit, synergy quantification, and return contribution analysis. Use when screening add-on targets, building platform acquisition strategies, or modeling tuck-in economics.

日本語の概要は準備中です。原文の説明を表示しています。

CaseMark/skills442026年9月9日 更新

Evaluates signal half-life, turnover implications, and capacity constraints for systematic alpha factors. Use when analyzing signal persistence, evaluating factor decay, or estimating strategy capacity.

日本語の概要は準備中です。原文の説明を表示しています。

CaseMark/skills442026年9月9日 更新

Evaluates alternative data sources including satellite, NLP sentiment, web scraping, and geolocation for alpha signal generation. Use when analyzing alt data, evaluating new data sources, or integrating non-traditional signals.

日本語の概要は準備中です。原文の説明を表示しています。

CaseMark/skills442026年9月9日 更新

Evaluates competition law exposure with market definition, HHI analysis, and remedy estimation for proposed transactions. Use when assessing merger clearance risk, analyzing market concentration, or preparing HSR filings.

日本語の概要は準備中です。原文の説明を表示しています。

CaseMark/skills442026年9月9日 更新

CaseMark のスキルをすべて見る

このスキルの問題を報告する