本文へ移動
cccskills
無料GitHub で公開

change-order-analysis

Analyze and predict construction change orders using ML. Classify change order types, predict costs and schedule impacts, identify patterns, and optimize approval workflows.

インストール方法を見る

含まれるファイル(3)

  • SKILL.md20.7 KB
  • claw.json581 B
  • instructions.md1.2 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Change Order Analysis

Overview

This skill implements machine learning-based change order analysis for construction projects. Predict change order costs, classify types, identify patterns in historical data, and streamline approval processes.

Capabilities:

  • Change order classification
  • Cost impact prediction
  • Schedule impact analysis
  • Pattern identification
  • Root cause analysis
  • Approval workflow optimization

Quick Start

from dataclasses import dataclass, field
from datetime import date, datetime
from typing import List, Dict, Optional
from enum import Enum

class ChangeOrderType(Enum):
    DESIGN_CHANGE = "design_change"
    OWNER_REQUEST = "owner_request"
    FIELD_CONDITION = "field_condition"
    CODE_COMPLIANCE = "code_compliance"
    VALUE_ENGINEERING = "value_engineering"
    ERROR_OMISSION = "error_omission"
    SCOPE_CHANGE = "scope_change"

class ChangeOrderStatus(Enum):
    DRAFT = "draft"
    SUBMITTED = "submitted"
    UNDER_REVIEW = "under_review"
    APPROVED = "approved"
    REJECTED = "rejected"
    IMPLEMENTED = "implemented"

@dataclass
class ChangeOrder:
    co_number: str
    title: str
    description: str
    co_type: ChangeOrderType
    status: ChangeOrderStatus
    submitted_date: date
    requested_by: str
    cost_impact: float
    schedule_impact_days: int
    affected_elements: List[str] = field(default_factory=list)

def classify_change_order(description: str) -> ChangeOrderType:
    """Simple rule-based classification"""
    description_lower = description.lower()

    if any(word in description_lower for word in ['design', 'drawing', 'specification']):
        return ChangeOrderType.DESIGN_CHANGE
    elif any(word in description_lower for word in ['owner', 'client', 'request']):
        return ChangeOrderType.OWNER_REQUEST
    elif any(word in description_lower for word in ['site', 'field', 'condition', 'unforeseen']):
        return ChangeOrderType.FIELD_CONDITION
    elif any(word in description_lower for word in ['code', 'regulation', 'compliance']):
        return ChangeOrderType.CODE_COMPLIANCE
    elif any(word in description_lower for word in ['value', 'alternative', 'savings']):
        return ChangeOrderType.VALUE_ENGINEERING
    elif any(word in description_lower for word in ['error', 'omission', 'mistake']):
        return ChangeOrderType.ERROR_OMISSION
    else:
        return ChangeOrderType.SCOPE_CHANGE

# Example
co = ChangeOrder(
    co_number="CO-001",
    title="Additional structural reinforcement",
    description="Site conditions revealed weaker soil requiring additional foundation reinforcement",
    co_type=classify_change_order("Site conditions revealed weaker soil"),
    status=ChangeOrderStatus.SUBMITTED,
    submitted_date=date.today(),
    requested_by="Site Engineer",
    cost_impact=50000,
    schedule_impact_days=5
)
print(f"CO Type: {co.co_type.value}")

Comprehensive Change Order System

Change Order Management

from dataclasses import dataclass, field
from datetime import date, datetime, timedelta
from typing import List, Dict, Optional, Tuple
from enum import Enum
import pandas as pd
import numpy as np

class ImpactSeverity(Enum):
    MINOR = "minor"  # < 1% cost, < 1 week schedule
    MODERATE = "moderate"  # 1-5% cost, 1-4 weeks schedule
    MAJOR = "major"  # 5-10% cost, 1-3 months schedule
    CRITICAL = "critical"  # > 10% cost, > 3 months schedule

@dataclass
class CostBreakdown:
    labor: float = 0
    materials: float = 0
    equipment: float = 0
    subcontractor: float = 0
    overhead: float = 0
    profit: float = 0

    @property
    def total(self) -> float:
        return self.labor + self.materials + self.equipment + self.subcontractor + self.overhead + self.profit

@dataclass
class ScheduleImpact:
    direct_days: int
    ripple_days: int
    critical_path_affected: bool
    affected_activities: List[str] = field(default_factory=list)

    @property
    def total_days(self) -> int:
        return self.direct_days + self.ripple_days

@dataclass
class ChangeOrderDetail:
    co_id: str
    co_number: str
    title: str
    description: str
    justification: str

    # Classification
    co_type: ChangeOrderType
    initiated_by: str  # owner, contractor, designer, etc.
    responsibility: str  # who pays

    # Status
    status: ChangeOrderStatus
    submitted_date: date
    approved_date: Optional[date] = None
    implemented_date: Optional[date] = None

    # Impact
    cost_breakdown: CostBreakdown = field(default_factory=CostBreakdown)
    schedule_impact: ScheduleImpact = None
    severity: ImpactSeverity = ImpactSeverity.MINOR

    # Affected scope
    affected_elements: List[str] = field(default_factory=list)
    affected_drawings: List[str] = field(default_factory=list)
    affected_specs: List[str] = field(default_factory=list)

    # Supporting documents
    attachments: List[str] = field(default_factory=list)
    related_rfis: List[str] = field(default_factory=list)
    related_cos: List[str] = field(default_factory=list)

    # Approval
    approvals: List[Dict] = field(default_factory=list)
    comments: List[Dict] = field(default_factory=list)

class ChangeOrderManager:
    """Manage project change orders"""

    def __init__(self, project_id: str, contract_value: float):
        self.project_id = project_id
        self.contract_value = contract_value
        self.change_orders: Dict[str, ChangeOrderDetail] = {}
        self.co_counter = 0

    def create_change_order(self, title: str, description: str,
                           co_type: ChangeOrderType,
                           initiated_by: str) -> ChangeOrderDetail:
        """Create new change order"""
        self.co_counter += 1
        co_id = f"CO-{self.project_id}-{self.co_counter:04d}"

        co = ChangeOrderDetail(
            co_id=co_id,
            co_number=f"CO-{self.co_counter:04d}",
            title=title,
            description=description,
            justification="",
            co_type=co_type,
            initiated_by=initiated_by,
            responsibility="TBD",
            status=ChangeOrderStatus.DRAFT,
            submitted_date=date.today()
        )

        self.change_orders[co_id] = co
        return co

    def update_cost(self, co_id: str, cost_breakdown: CostBreakdown):
        """Update change order cost"""
        co = self.change_orders.get(co_id)
        if co:
            co.cost_breakdown = cost_breakdown
            co.severity = self._calculate_severity(co)

    def update_schedule_impact(self, co_id: str, impact: ScheduleImpact):
        """Update schedule impact"""
        co = self.change_orders.get(co_id)
        if co:
            co.schedule_impact = impact
            co.severity = self._calculate_severity(co)

    def _calculate_severity(self, co: ChangeOrderDetail) -> ImpactSeverity:
        """Calculate change order severity"""
        cost_pct = co.cost_breakdown.total / self.contract_value * 100
        schedule_days = co.schedule_impact.total_days if co.schedule_impact else 0

        if cost_pct > 10 or schedule_days > 90:
            return ImpactSeverity.CRITICAL
        elif cost_pct > 5 or schedule_days > 30:
            return ImpactSeverity.MAJOR
        elif cost_pct > 1 or schedule_days > 7:
            return ImpactSeverity.MODERATE
        else:
            return ImpactSeverity.MINOR

    def submit_for_approval(self, co_id: str):
        """Submit change order for approval"""
        co = self.change_orders.get(co_id)
        if co and co.status == ChangeOrderStatus.DRAFT:
            co.status = ChangeOrderStatus.SUBMITTED
            co.submitted_date = date.today()

    def approve(self, co_id: str, approver: str, comments: str = ""):
        """Approve change order"""
        co = self.change_orders.get(co_id)
        if co:
            co.approvals.append({
                'approver': approver,
                'action': 'approved',
                'date': date.today().isoformat(),
                'comments': comments
            })
            co.status = ChangeOrderStatus.APPROVED
            co.approved_date = date.today()

    def get_summary(self) -> Dict:
        """Get change order summary"""
        if not self.change_orders:
            return {'message': 'No change orders'}

        total_cost = sum(co.cost_breakdown.total for co in self.change_orders.values())
        total_schedule = sum(
            co.schedule_impact.total_days if co.schedule_impact else 0
            for co in self.change_orders.values()
        )

        by_type = {}
        by_status = {}
        by_severity = {}

        for co in self.change_orders.values():
            t = co.co_type.value
            by_type[t] = by_type.get(t, 0) + co.cost_breakdown.total

            s = co.status.value
            by_status[s] = by_status.get(s, 0) + 1

            sev = co.severity.value
            by_severity[sev] = by_severity.get(sev, 0) + 1

        return {
            'total_change_orders': len(self.change_orders),
            'total_cost_impact': total_cost,
            'cost_impact_pct': total_cost / self.contract_value * 100,
            'total_schedule_impact_days': total_schedule,
            'by_type': by_type,
            'by_status': by_status,
            'by_severity': by_severity
        }

ML Classification and Prediction

from sklearn.ensemble import RandomForestClassifier, GradientBoostingRegressor
from sklearn.feature_extraction.text import TfidfVectorizer
from sklearn.model_selection import train_test_split
from sklearn.preprocessing import LabelEncoder
import pandas as pd
import numpy as np
import joblib

class ChangeOrderPredictor:
    """ML-based change order classification and cost prediction"""

    def __init__(self):
        self.type_classifier = None
        self.cost_predictor = None
        self.schedule_predictor = None
        self.vectorizer = TfidfVectorizer(max_features=500, ngram_range=(1, 2))
        self.type_encoder = LabelEncoder()
        self.is_trained = False

    def train(self, historical_data: pd.DataFrame):
        """Train models on historical change order data

        Expected columns:
        - description: text description
        - co_type: change order type
        - cost_impact: cost in dollars
        - schedule_impact: days of delay
        - contract_value: original contract value
        - project_phase: phase when CO was raised
        - affected_elements_count: number of affected elements
        """
        # Prepare text features
        text_features = self.vectorizer.fit_transform(historical_data['description'])

        # Prepare numeric features
        numeric_features = historical_data[[
            'contract_value', 'affected_elements_count'
        ]].values

        # Combine features
        X = np.hstack([text_features.toarray(), numeric_features])

        # Train type classifier
        y_type = self.type_encoder.fit_transform(historical_data['co_type'])
        X_train, X_test, y_train, y_test = train_test_split(X, y_type, test_size=0.2)

        self.type_classifier = RandomForestClassifier(n_estimators=100, random_state=42)
        self.type_classifier.fit(X_train, y_train)

        type_accuracy = self.type_classifier.score(X_test, y_test)

        # Train cost predictor
        y_cost = historical_data['cost_impact'].values
        self.cost_predictor = GradientBoostingRegressor(n_estimators=100, random_state=42)
        self.cost_predictor.fit(X, y_cost)

        # Train schedule predictor
        y_schedule = historical_data['schedule_impact'].values
        self.schedule_predictor = GradientBoostingRegressor(n_estimators=100, random_state=42)
        self.schedule_predictor.fit(X, y_schedule)

        self.is_trained = True

        return {
            'type_classifier_accuracy': type_accuracy,
            'models_trained': True
        }

    def predict(self, description: str, contract_value: float,
               affected_elements_count: int = 1) -> Dict:
        """Predict change order type and impacts"""
        if not self.is_trained:
            return {'error': 'Models not trained'}

        # Prepare features
        text_features = self.vectorizer.transform([description])
        numeric_features = np.array([[contract_value, affected_elements_count]])
        X = np.hstack([text_features.toarray(), numeric_features])

        # Predict type
        type_probs = self.type_classifier.predict_proba(X)[0]
        type_idx = np.argmax(type_probs)
        predicted_type = self.type_encoder.inverse_transform([type_idx])[0]

        # Predict cost
        predicted_cost = self.cost_predictor.predict(X)[0]

        # Predict schedule
        predicted_schedule = self.schedule_predictor.predict(X)[0]

        return {
            'predicted_type': predicted_type,
            'type_confidence': float(type_probs[type_idx]),
            'type_probabilities': {
                self.type_encoder.inverse_transform([i])[0]: float(p)
                for i, p in enumerate(type_probs)
            },
            'predicted_cost': float(max(0, predicted_cost)),
            'predicted_schedule_days': int(max(0, predicted_schedule)),
            'cost_as_pct_contract': float(predicted_cost / contract_value * 100)
        }

    def save_models(self, path: str):
        """Save trained models"""
        joblib.dump({
            'type_classifier': self.type_classifier,
            'cost_predictor': self.cost_predictor,
            'schedule_predictor': self.schedule_predictor,
            'vectorizer': self.vectorizer,
            'type_encoder': self.type_encoder
        }, path)

    def load_models(self, path: str):
        """Load trained models"""
        data = joblib.load(path)
        self.type_classifier = data['type_classifier']
        self.cost_predictor = data['cost_predictor']
        self.schedule_predictor = data['schedule_predictor']
        self.vectorizer = data['vectorizer']
        self.type_encoder = data['type_encoder']
        self.is_trained = True

Pattern Analysis

from collections import defaultdict
from typing import List, Dict
import pandas as pd

class ChangeOrderAnalyzer:
    """Analyze patterns in change orders"""

    def __init__(self, change_orders: List[ChangeOrderDetail]):
        self.cos = change_orders
        self.df = self._to_dataframe()

    def _to_dataframe(self) -> pd.DataFrame:
        """Convert change orders to DataFrame"""
        data = []
        for co in self.cos:
            data.append({
                'co_id': co.co_id,
                'co_type': co.co_type.value,
                'initiated_by': co.initiated_by,
                'cost': co.cost_breakdown.total,
                'schedule_days': co.schedule_impact.total_days if co.schedule_impact else 0,
                'submitted_date': co.submitted_date,
                'affected_elements': len(co.affected_elements),
                'severity': co.severity.value
            })
        return pd.DataFrame(data)

    def analyze_by_type(self) -> Dict:
        """Analyze change orders by type"""
        if self.df.empty:
            return {}

        analysis = {}
        for co_type in self.df['co_type'].unique():
            type_df = self.df[self.df['co_type'] == co_type]
            analysis[co_type] = {
                'count': len(type_df),
                'total_cost': type_df['cost'].sum(),
                'avg_cost': type_df['cost'].mean(),
                'total_schedule_days': type_df['schedule_days'].sum(),
                'avg_schedule_days': type_df['schedule_days'].mean()
            }

        return analysis

    def analyze_trends(self) -> Dict:
        """Analyze trends over time"""
        if self.df.empty:
            return {}

        self.df['month'] = pd.to_datetime(self.df['submitted_date']).dt.to_period('M')

        monthly = self.df.groupby('month').agg({
            'co_id': 'count',
            'cost': 'sum',
            'schedule_days': 'sum'
        }).rename(columns={'co_id': 'count'})

        return {
            'monthly_trend': monthly.to_dict(),
            'peak_month': monthly['count'].idxmax().strftime('%Y-%m'),
            'total_cost_trend': 'increasing' if monthly['cost'].is_monotonic_increasing else
                               'decreasing' if monthly['cost'].is_monotonic_decreasing else 'variable'
        }

    def identify_root_causes(self) -> List[Dict]:
        """Identify common root causes"""
        if self.df.empty:
            return []

        # Analyze by initiator and type combination
        causes = self.df.groupby(['initiated_by', 'co_type']).agg({
            'co_id': 'count',
            'cost': 'sum'
        }).reset_index()

        causes = causes.sort_values('cost', ascending=False)

        return [
            {
                'initiator': row['initiated_by'],
                'type': row['co_type'],
                'frequency': row['co_id'],
                'total_cost': row['cost'],
                'recommendation': self._get_recommendation(row['initiated_by'], row['co_type'])
            }
            for _, row in causes.head(10).iterrows()
        ]

    def _get_recommendation(self, initiator: str, co_type: str) -> str:
        """Generate recommendation based on pattern"""
        recommendations = {
            ('designer', 'design_change'): 'Improve design review process and BIM coordination',
            ('designer', 'error_omission'): 'Implement design quality checks and clash detection',
            ('owner', 'owner_request'): 'Define scope more clearly during planning phase',
            ('owner', 'scope_change'): 'Conduct thorough requirements gathering',
            ('contractor', 'field_condition'): 'Enhance site investigation before construction',
            ('contractor', 'value_engineering'): 'Include VE sessions earlier in project'
        }

        return recommendations.get(
            (initiator.lower(), co_type),
            'Review process and implement preventive measures'
        )

    def calculate_risk_score(self) -> float:
        """Calculate overall change order risk score"""
        if self.df.empty:
            return 0

        # Factors:
        # - Frequency of COs
        # - Cost impact severity
        # - Schedule impact severity
        # - Trend direction

        co_rate = len(self.df) / 12  # COs per month (assuming 12 month project)
        avg_cost_impact = self.df['cost'].mean()
        avg_schedule_impact = self.df['schedule_days'].mean()

        # Normalize and weight
        freq_score = min(1, co_rate / 10) * 30  # Up to 30 points
        cost_score = min(1, avg_cost_impact / 50000) * 40  # Up to 40 points
        schedule_score = min(1, avg_schedule_impact / 30) * 30  # Up to 30 points

        return freq_score + cost_score + schedule_score

    def generate_report(self, output_path: str) -> str:
        """Generate comprehensive analysis report"""
        with pd.ExcelWriter(output_path, engine='openpyxl') as writer:
            # Summary
            summary = pd.DataFrame([{
                'Total COs': len(self.cos),
                'Total Cost Impact': self.df['cost'].sum(),
                'Total Schedule Impact (days)': self.df['schedule_days'].sum(),
                'Risk Score': self.calculate_risk_score()
            }])
            summary.to_excel(writer, sheet_name='Summary', index=False)

            # By type
            pd.DataFrame(self.analyze_by_type()).T.to_excel(
                writer, sheet_name='By_Type'
            )

            # Root causes
            pd.DataFrame(self.identify_root_causes()).to_excel(
                writer, sheet_name='Root_Causes', index=False
            )

            # All COs
            self.df.to_excel(writer, sheet_name='All_COs', index=False)

        return output_path

Quick Reference

CO TypeTypical CausePrevention Strategy
Design ChangeIncomplete designBIM coordination, design reviews
Owner RequestChanging requirementsClear scope definition
Field ConditionUnforeseen site issuesThorough site investigation
Code ComplianceRegulation changesEarly code review
Value EngineeringCost savings opportunityVE workshops
Error/OmissionDesign mistakesQA/QC processes

Resources

Next Steps

  • See document-classification-nlp for CO document processing
  • See risk-assessment-ml for project risk analysis
  • See cost-prediction for cost estimation

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.

日本語の概要は準備中です。原文の説明を表示しています。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3492026年8月22日 更新

Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.

日本語の概要は準備中です。原文の説明を表示しています。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3492026年8月22日 更新

Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.

日本語の概要は準備中です。原文の説明を表示しています。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3492026年8月22日 更新

Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.

日本語の概要は準備中です。原文の説明を表示しています。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3492026年8月22日 更新

Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.

日本語の概要は準備中です。原文の説明を表示しています。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3492026年8月22日 更新

Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.

日本語の概要は準備中です。原文の説明を表示しています。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3492026年8月22日 更新

datadrivenconstruction のスキルをすべて見る

このスキルの問題を報告する