Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
日本語の概要は準備中です。原文の説明を表示しています。
Material passports and circular construction: generate per-element material inventories from BOQ/BIM, mark reuse potential and recycled content, and prepare deconstruction data. Use for circular-economy and EU Taxonomy-aligned projects.
インストールする前に、エージェントに与えられる指示の中身を確認できます。
The EU Taxonomy and CSRD push construction toward circularity: buildings must be designed for disassembly, materials traceable for reuse. A material passport is a digital record of what is in a building, where, and how it can be reused at end of life.
Per element (or per BOQ line):
| Field | Source |
|---|---|
| material & volume/mass | BOQ components[] (resource_name, resource_quantity, resource_unit) |
| location in the building | BIM element link |
| manufacturer / EPD | procurement records |
| recycled content % | supplier declaration / EPD |
| reuse potential at EOL | disassembly class (reusable / recyclable / downcyclable / landfill) |
| embodied carbon (A1–A3) | embodied-carbon-esg skill |
# per BOQ line: material inventory from CWICR components
for line in boq:
for comp in line["components"]:
if comp["type"] == "material":
passport.append({
"element": line["description"],
"material": comp["name"],
"quantity": line_quantity * comp["quantity"],
"unit": comp["unit"],
"recycled_content": epd_lookup(comp["name"]), # from EPD library
"reuse_class": disassembly_class(comp["name"]), # rule-based
})
まだレビューはありません。使ってみた感想をお寄せください。
概要と使いどころ
Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
日本語の概要は準備中です。原文の説明を表示しています。
Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.
日本語の概要は準備中です。原文の説明を表示しています。
Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.
日本語の概要は準備中です。原文の説明を表示しています。
Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.
日本語の概要は準備中です。原文の説明を表示しています。
Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.
日本語の概要は準備中です。原文の説明を表示しています。
Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.
日本語の概要は準備中です。原文の説明を表示しています。