Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
日本語の概要は準備中です。原文の説明を表示しています。
Create bills of quantities and estimates in OpenConstructionERP: search cost items, build BOQ sections, link BIM elements in bulk, validate the BOQ, and export GAEB/XLSX/JSON. Use for any estimating workflow on the platform.
インストールする前に、エージェントに与えられる指示の中身を確認できます。
oce-load-cost-bases) so items are searchable.POST /api/v1/boqs with project, currency, classification standard (DIN 276 / NRM / MasterFormat / regional).GET /api/v1/costs/?region=TR_NATIONAL&q=duvar (SQL search) or the semantic path (/qdrant-search when Qdrant is on). Every item carries a components[] breakdown (labour/material/machine with norm quantities and unit prices).POST /api/v1/bim/elements/bulk-link style endpoints aggregate area/volume/length per element), or PDF/DWG takeoff measurements.POST /api/v1/boqs/{id}/validate/ runs rule packs (BOQ quality, DIN276, NRM, GAEB) and returns violations; quality score updates live.{
"code": "15.115.1008",
"description": "El veya kompresörle ... yumuşak kaya kazılması",
"unit": "m³",
"rate": 1044.5,
"currency": "TRY",
"classification": {"collection":"İnşaat","department":"İnşaat","section":"15.115","category":"CONSTRUCTION WORK"},
"components": [
{"name":"Kompresör","type":"equipment","quantity":0.2,"unit_rate":1991.73,"cost":398.35},
{"name":"Düz işçi","type":"labor","quantity":1.25,"unit_rate":165.0,"cost":206.25}
],
"metadata": {"labor_cost":437.25,"equipment_cost":398.35,"labor_hours":3.83}
}
| Input | Path | Notes |
|---|---|---|
| Natural language | POST /api/v1/costs/match (or AI estimate) | multi-lingual matching |
| Photo | AI photo-to-BOQ (GPT-4o + YOLO) | returns scoped BOQ with confidence |
| BIM model | element → cost matching (/suggest-for-element) | uses volume/area from the model |
| DWG/PDF | takeoff measurement | vectors/rooms detected, pushed into BOQ |
rate = 0 — attach a market resource price sheet before estimating.total_cost_per_position; resource sums reconcile to total_resource_cost_per_position.unit matches your takeoff quantity (m²/m³/m/kg).components[] sum against rate before committing a binding estimate.まだレビューはありません。使ってみた感想をお寄せください。
概要と使いどころ
Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
日本語の概要は準備中です。原文の説明を表示しています。
Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.
日本語の概要は準備中です。原文の説明を表示しています。
Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.
日本語の概要は準備中です。原文の説明を表示しています。
Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.
日本語の概要は準備中です。原文の説明を表示しています。
Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.
日本語の概要は準備中です。原文の説明を表示しています。
Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.
日本語の概要は準備中です。原文の説明を表示しています。