Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
日本語の概要は準備中です。原文の説明を表示しています。
Analyze field progress photos. Catalog, tag, and compare against planned progress.
インストールする前に、エージェントに与えられる指示の中身を確認できます。
Site photos document progress but are often poorly organized. This skill provides systematic photo cataloging and analysis.
import pandas as pd
from datetime import datetime, date
from typing import Dict, Any, List, Optional
from dataclasses import dataclass, field
from enum import Enum
class PhotoCategory(Enum):
PROGRESS = "progress"
QUALITY = "quality"
SAFETY = "safety"
DELIVERY = "delivery"
ISSUE = "issue"
GENERAL = "general"
@dataclass
class SitePhoto:
photo_id: str
filename: str
captured_date: datetime
category: PhotoCategory
location: str
level: str
zone: str
captured_by: str
description: str
tags: List[str] = field(default_factory=list)
activity_code: str = ""
file_path: str = ""
class ProgressPhotoAnalyzer:
def __init__(self, project_name: str):
self.project_name = project_name
self.photos: Dict[str, SitePhoto] = {}
self._counter = 0
def catalog_photo(self, filename: str, captured_date: datetime,
category: PhotoCategory, location: str, level: str,
captured_by: str, description: str = "",
zone: str = "", tags: List[str] = None) -> SitePhoto:
self._counter += 1
photo_id = f"PH-{self._counter:05d}"
photo = SitePhoto(
photo_id=photo_id,
filename=filename,
captured_date=captured_date,
category=category,
location=location,
level=level,
zone=zone,
captured_by=captured_by,
description=description,
tags=tags or []
)
self.photos[photo_id] = photo
return photo
def get_photos_by_date(self, target_date: date) -> List[SitePhoto]:
return [p for p in self.photos.values()
if p.captured_date.date() == target_date]
def get_photos_by_location(self, level: str, zone: str = None) -> List[SitePhoto]:
photos = [p for p in self.photos.values() if p.level == level]
if zone:
photos = [p for p in photos if p.zone == zone]
return photos
def search_by_tag(self, tag: str) -> List[SitePhoto]:
tag_lower = tag.lower()
return [p for p in self.photos.values()
if any(tag_lower in t.lower() for t in p.tags)]
def get_summary(self) -> Dict[str, Any]:
by_category = {}
by_level = {}
for p in self.photos.values():
cat = p.category.value
by_category[cat] = by_category.get(cat, 0) + 1
by_level[p.level] = by_level.get(p.level, 0) + 1
return {
'total_photos': len(self.photos),
'by_category': by_category,
'by_level': by_level
}
def export_catalog(self, output_path: str):
data = [{
'ID': p.photo_id,
'Filename': p.filename,
'Date': p.captured_date,
'Category': p.category.value,
'Level': p.level,
'Zone': p.zone,
'Location': p.location,
'By': p.captured_by,
'Tags': ', '.join(p.tags)
} for p in self.photos.values()]
pd.DataFrame(data).to_excel(output_path, index=False)
analyzer = ProgressPhotoAnalyzer("Office Tower")
photo = analyzer.catalog_photo(
filename="IMG_001.jpg",
captured_date=datetime.now(),
category=PhotoCategory.PROGRESS,
location="Column Grid B-3",
level="Level 5",
captured_by="Site Super",
tags=["concrete", "forming"]
)
まだレビューはありません。使ってみた感想をお寄せください。
概要と使いどころ
Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
日本語の概要は準備中です。原文の説明を表示しています。
Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.
日本語の概要は準備中です。原文の説明を表示しています。
Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.
日本語の概要は準備中です。原文の説明を表示しています。
Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.
日本語の概要は準備中です。原文の説明を表示しています。
Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.
日本語の概要は準備中です。原文の説明を表示しています。
Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.
日本語の概要は準備中です。原文の説明を表示しています。