Analyze schedule delays, identify causes, and calculate time impacts using delay analysis methods.
インストールする前に、エージェントに与えられる指示の中身を確認できます。
import pandas as pd
from datetime import date, timedelta
from typing import Dict, Any, List, Optional
from dataclasses import dataclass, field
from enum import Enum
class DelayType(Enum):
EXCUSABLE_COMPENSABLE = "excusable_compensable"
EXCUSABLE_NON_COMPENSABLE = "excusable_non_compensable"
NON_EXCUSABLE = "non_excusable"
CONCURRENT = "concurrent"
class DelayCause(Enum):
OWNER_CHANGE = "owner_change"
DESIGN_ERROR = "design_error"
WEATHER = "weather"
DIFFERING_CONDITIONS = "differing_conditions"
CONTRACTOR_ISSUE = "contractor_issue"
MATERIAL_DELAY = "material_delay"
LABOR_SHORTAGE = "labor_shortage"
PERMIT_DELAY = "permit_delay"
OTHER = "other"
@dataclass
class DelayEvent:
delay_id: str
activity_id: str
activity_name: str
delay_type: DelayType
cause: DelayCause
start_date: date
end_date: date
delay_days: int
on_critical_path: bool
description: str
documentation: List[str] = field(default_factory=list)
cost_impact: float = 0.0
@dataclass
class ScheduleBaseline:
baseline_date: date
planned_completion: date
activities: Dict[str, Dict[str, date]] # activity_id: {start, end}
class ScheduleDelayAnalyzer:
def __init__(self, project_name: str, contract_completion: date):
self.project_name = project_name
self.contract_completion = contract_completion
self.baselines: List[ScheduleBaseline] = []
self.delays: Dict[str, DelayEvent] = {}
self._counter = 0
def add_baseline(self, baseline_date: date, planned_completion: date,
activities: Dict[str, Dict[str, date]]):
baseline = ScheduleBaseline(baseline_date, planned_completion, activities)
self.baselines.append(baseline)
def record_delay(self, activity_id: str, activity_name: str,
delay_type: DelayType, cause: DelayCause,
start_date: date, end_date: date,
on_critical_path: bool, description: str,
cost_impact: float = 0) -> DelayEvent:
self._counter += 1
delay_id = f"DLY-{self._counter:04d}"
delay = DelayEvent(
delay_id=delay_id,
activity_id=activity_id,
activity_name=activity_name,
delay_type=delay_type,
cause=cause,
start_date=start_date,
end_date=end_date,
delay_days=(end_date - start_date).days,
on_critical_path=on_critical_path,
description=description,
cost_impact=cost_impact
)
self.delays[delay_id] = delay
return delay
def calculate_project_delay(self) -> int:
"""Calculate total critical path delay."""
critical_delays = [d for d in self.delays.values() if d.on_critical_path]
return sum(d.delay_days for d in critical_delays)
def analyze_by_type(self) -> Dict[str, Dict[str, Any]]:
analysis = {}
for delay in self.delays.values():
dtype = delay.delay_type.value
if dtype not in analysis:
analysis[dtype] = {'count': 0, 'days': 0, 'cost': 0}
analysis[dtype]['count'] += 1
analysis[dtype]['days'] += delay.delay_days
analysis[dtype]['cost'] += delay.cost_impact
return analysis
def analyze_by_cause(self) -> Dict[str, int]:
by_cause = {}
for delay in self.delays.values():
cause = delay.cause.value
by_cause[cause] = by_cause.get(cause, 0) + delay.delay_days
return by_cause
def calculate_time_extension_claim(self) -> Dict[str, Any]:
"""Calculate basis for time extension claim."""
excusable = [d for d in self.delays.values()
if d.delay_type in [DelayType.EXCUSABLE_COMPENSABLE,
DelayType.EXCUSABLE_NON_COMPENSABLE]
and d.on_critical_path]
compensable = [d for d in excusable
if d.delay_type == DelayType.EXCUSABLE_COMPENSABLE]
return {
'excusable_delays': len(excusable),
'excusable_days': sum(d.delay_days for d in excusable),
'compensable_delays': len(compensable),
'compensable_days': sum(d.delay_days for d in compensable),
'total_cost_impact': sum(d.cost_impact for d in compensable),
'recommended_extension': sum(d.delay_days for d in excusable)
}
def get_summary(self) -> Dict[str, Any]:
critical_delay = self.calculate_project_delay()
projected_completion = self.contract_completion + timedelta(days=critical_delay)
return {
'project': self.project_name,
'contract_completion': self.contract_completion,
'projected_completion': projected_completion,
'total_delays': len(self.delays),
'critical_path_delays': sum(1 for d in self.delays.values() if d.on_critical_path),
'total_delay_days': critical_delay,
'by_type': self.analyze_by_type(),
'by_cause': self.analyze_by_cause()
}
def export_analysis(self, output_path: str):
data = [{
'ID': d.delay_id,
'Activity': d.activity_name,
'Type': d.delay_type.value,
'Cause': d.cause.value,
'Start': d.start_date,
'End': d.end_date,
'Days': d.delay_days,
'Critical': d.on_critical_path,
'Cost Impact': d.cost_impact,
'Description': d.description
} for d in self.delays.values()]
pd.DataFrame(data).to_excel(output_path, index=False)
analyzer = ScheduleDelayAnalyzer("Office Tower", date(2024, 12, 31))
delay = analyzer.record_delay(
activity_id="A-300",
activity_name="Foundation Work",
delay_type=DelayType.EXCUSABLE_COMPENSABLE,
cause=DelayCause.OWNER_CHANGE,
start_date=date(2024, 3, 1),
end_date=date(2024, 3, 15),
on_critical_path=True,
description="Owner requested additional scope",
cost_impact=50000
)
summary = analyzer.get_summary()
print(f"Project delayed by {summary['total_delay_days']} days")
claim = analyzer.calculate_time_extension_claim()
print(f"Recommended extension: {claim['recommended_extension']} days")
まだレビューはありません。使ってみた感想をお寄せください。
概要と使いどころ
Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
日本語の概要は準備中です。原文の説明を表示しています。
Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.
日本語の概要は準備中です。原文の説明を表示しています。
Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.
日本語の概要は準備中です。原文の説明を表示しています。
Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.
日本語の概要は準備中です。原文の説明を表示しています。
Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.
日本語の概要は準備中です。原文の説明を表示しています。
Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.
日本語の概要は準備中です。原文の説明を表示しています。