Preserve an approved specification through a complete implementation plan and execution. Use for major refactors, migrations, or multi-session work when a confirmed spec is authoritative; keep scope and order changes explicit.
インストールする前に、エージェントに与えられる指示の中身を確認できます。
Preserve an approved specification from planning through execution. The specification defines the required outcome and acceptance contract; the plan defines implementation order and technique.
Before planning or editing, identify:
Use a stable path plus revision or commit. Do not calculate a hash unless an actual identity or integrity decision needs it.
If several documents contribute requirements, name one primary specification and list the exact normative companions. Do not silently choose whichever document makes the next slice smaller.
If artifacts disagree, resolve their authority rather than using recency or implementation completeness as a proxy for approval. A research implementation may remain valuable evidence while staying outside the accepted product programme.
When the request is for the full specification, create one program-level plan over the full accepted scope. An explicitly bounded tranche request needs only its applicable requirements, dependencies, and stopping point. Link an existing complete plan; if absent, note that fact and resolve only dependencies that block the tranche. Do not expand the request into whole-program planning. Retain the existing status of other requirements; do not replan them or imply they were delivered in this request.
For a full-spec plan:
The plan may use several PRs, releases, or sessions. Full coverage does not require a mega-PR.
For a full-spec plan, keep the artifact compact and include the sections below. A tranche-only request uses the applicable subset and specification links; it does not need a whole-program coverage ledger or sequence.
For each requirement or acceptance ID, record:
planned, blocked-decision, in-progress, implemented, or verifiedplanned may be scheduled later. An accepted requirement cannot be marked out of scope merely because it is outside the current tranche.
Show the full program sequence or dependency graph. Distinguish definition, enforcement, migration, activation, and deployment when the specification distinguishes them.
List every proposed added, removed, narrowed, or reordered item with:
No entry means no delta. Never hide a scope change inside “minimal,” “first slice,” “later,” or “implementation detail.” Obtain explicit approval before adopting a product or acceptance delta.
Name the current tranche and its stopping point. Keep later accepted scope reachable through the specification or existing complete plan. Label a tranche document Execution Tranche, not “the implementation plan for the specification.” Link the complete plan when one exists; otherwise link the relevant specification anchors and state the planning boundary.
Define completion against the specification coverage ledger, not only the current tranche checklist.
At execution entry, read:
Before editing, check coverage against the requested scope. A full-spec plan must still cover the complete accepted specification. Repair a partial phase plan masquerading as the full plan before relying on that claim; an explicitly bounded tranche needs its applicable requirements and settled dependencies.
During implementation:
Do not claim the specification is implemented until every accepted coverage item is implemented and verified at the appropriate risk level.
If a specification settles one public operation over a package of one or many items, a plan may not implement single-item behavior first and defer package cardinality unless the specification is explicitly amended. More generally, an easier subset is not an implementation plan for the whole contract.
まだレビューはありません。使ってみた感想をお寄せください。
概要と使いどころ
Investigate and fix bugs, failing tests, regressions, build failures, or unexpected behavior using boundary localization, evidence, and bounded hypotheses.
日本語の概要は準備中です。原文の説明を表示しています。
Choose responsibility for substantial work before deep execution: keep one responsibility's coupled parts in a single lane, and hand a bounded or independent lane to a worker when clean context, an unknown cause, independent review, or coordinator attention materially improves the outcome.
日本語の概要は準備中です。原文の説明を表示しています。
Turn a rough feature, product interaction, or architecture idea into a concrete design. Use when meaningful decisions remain open; avoid for already-clear local edits.
日本語の概要は準備中です。原文の説明を表示しています。
Execute an existing implementation plan or settled multi-step request through connected slices with targeted checks and controlled plan drift.
日本語の概要は準備中です。原文の説明を表示しています。
Finish a development change safely by inspecting the final tree, verifying at the right scope, and performing only the requested Git or PR actions.