本文へ移動
cccskills
無料GitHub で公開

bid-tender-review

Analyse a construction bid or tender package for scope gaps, risk-shifting exclusions, unit-rate red flags, and front-loading in the schedule of values. Use when asked to review a bid, level bids, check a tender for gaps, compare sub quotes, or vet a schedule of values before award. Produces a structured bid review with a gap register, exclusion risk table, pricing red flags, and an award recommendation with pre-award clarifications.

インストール方法を見る

含まれるファイル(1)

  • SKILL.md5.5 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Bid / Tender Review Skill

A low bid is only cheap if the scope is actually in it. This skill runs the review an experienced estimator or owner's rep would run before award: reconcile the bid against the bid documents, hunt the exclusions and qualifications that quietly shift risk back to the buyer, test unit rates against sanity ranges, and check the schedule of values for front-loading. The goal is a levelled, apples-to-apples view and a written list of what to clarify before signing — not after mobilisation.

What This Skill Produces

  • A scope gap register — items in the bid documents but missing, excluded, or ambiguous in the bid
  • An exclusions & qualifications risk table — each one classified by who ends up holding the risk
  • Pricing red flags — outlier unit rates, unbalanced line items, allowances hiding real cost
  • A front-loading check on the schedule of values
  • An award recommendation with pre-award clarification questions (RFI-to-bidder list)

Required Inputs

Ask for these if not provided; if working from a thin brief, proceed and label every assumption [assumed]:

  • The bid/quote itself (pricing, exclusions, qualifications, allowances, schedule of values if given)
  • Scope of work / bid documents — drawings list, spec sections, or at least a scope narrative
  • Contract form and delivery method (lump sum, GMP, unit price, design-build) — it changes what "excluded" means
  • Competing bids (optional, for levelling) and the engineer's/internal estimate if one exists
  • Project specifics that drive cost: site access, phasing, working hours, bonding/insurance requirements

Review Framework

Work through four passes, in order:

1. Scope reconciliation. Walk the bid against the documents section by section. Classify every mismatch: Missing (silent — the most dangerous), Excluded (stated), Qualified (included "provided that…"), Allowance (a number, not a commitment). Flag anything priced "by others" with no other on the job to catch it.

2. Exclusion risk shift. For each exclusion/qualification, state plainly who carries the risk if it bites, and rate it:

RatingMeaning
Deal-breakerShifts a core contract risk (e.g. excludes rock/dewatering on a deep excavation, excludes tie-ins)
NegotiateCommon but movable — escalation caps, limited warranty, "design assist not design"
AcceptStandard trade practice (e.g. excludes permits the GC always pulls)

3. Unit-rate and balance check. Flag rates far off the field of other bids or the estimate (>±20% is a look; >±40% is a flag). Watch for unbalanced bidding: high rates on early or likely-to-grow quantities, low rates on items likely to be deleted.

4. Front-loading detection. In the schedule of values, compare early-activity values (mobilisation, GCs, submittals, excavation) to their real cost. Mobilisation >3–5% of contract value, or the first 20% of schedule carrying >30% of value, means the bidder is financing the job with your money — a cash-flow and default-risk signal, and painful if you ever terminate for convenience.

Output Format

Bid Review: [Project] — [Bidder]

1. Summary & recommendation — award / award with clarifications / reject, in three sentences. 2. Scope gap register — table: | # | Item | Bid docs ref | Status (Missing/Excluded/Qualified/Allowance) | Cost exposure ($ or [to price]) | 3. Exclusions & qualifications risk table — | Exclusion | Who holds the risk | Rating | Recommended action | 4. Pricing red flags — outlier rates, unbalanced items, allowance adequacy; note levelled comparison if multiple bids. 5. Schedule of values / front-loading check — findings and requested corrections. 6. Pre-award clarifications — numbered questions to issue to the bidder, each answerable yes/no or with a price.

Quality Checks

  • Every exclusion and qualification in the bid appears in the risk table — none skipped as boilerplate
  • Each scope gap cites where the work lives in the bid documents (spec section / drawing)
  • Cost exposure is estimated or explicitly marked [to price] — never silently ignored
  • Front-loading check compares SoV values to real early-work cost, not just percentages in isolation
  • Recommendation is conditional on the clarification list, and every clarification is answerable before award

Anti-Patterns

  • Do not pick the low bid on price alone — level scope first; a $200k gap eats a $150k spread
  • Do not treat "excluded" and "not mentioned" as the same — silence in a bid is a claim waiting to happen
  • Do not accept allowances as pricing — an allowance is the bidder's guess spent with your money
  • Do not wave through mobilisation and general-conditions front-loading as "normal" without checking it against cost
  • Do not resolve ambiguity in the bidder's favour by assumption — put it on the pre-award clarification list in writing

Example Trigger Phrases

  • "Review a bid."
  • "Check a tender for gaps."
  • "Compare sub quotes."
  • "Vet a schedule of values before award."

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Design a 360-degree feedback survey or write a structured 360 feedback report. Use when asked to build a 360 feedback process, write 360 feedback for a colleague, design a feedback survey, or produce a feedback report. Produces either a complete survey instrument with rating scales and open-ended questions, or a structured narrative feedback report with themes, strengths, and development areas.

日本語の概要は準備中です。原文の説明を表示しています。

mohitagw15856/pm-claude-skills1,4412026年10月13日 更新

Decode a 401k or workplace retirement plan — the real cost of its funds, the match's fine print, vesting math, and the plan features worth using or avoiding. Use when someone asks 'is my 401k any good', 'decode my 401k plan', 'which funds should I look at', or 'what fees am I paying'. Produces a fee decode in dollars-over-time, match and vesting math, a fund-lineup triage by cost, and the questions for HR or the plan administrator.

日本語の概要は準備中です。原文の説明を表示しています。

mohitagw15856/pm-claude-skills1,4412026年10月13日 更新

Design statistically rigorous A/B tests for product features, UI changes, onboarding flows, and pricing experiments. Use when asked to set up an experiment, design an A/B test, calculate sample size, or interpret test results. Produces a complete test plan with hypothesis, variant definitions, sample size, duration estimate, guardrail metrics, and a results interpretation guide.

日本語の概要は準備中です。原文の説明を表示しています。

mohitagw15856/pm-claude-skills1,4412026年10月13日 更新

Analyse a finished A/B test and write the readout — the result, whether it's statistically and practically significant, what it means, and the ship/no-ship call. Use when asked to analyse experiment results, write an A/B test readout, interpret test data, or decide whether to ship a variant. Produces a clear verdict with the lift and confidence, segment cuts, the risks (peeking, novelty, sample), and a recommendation. Distinct from planning a test — this reads results.

日本語の概要は準備中です。原文の説明を表示しています。

mohitagw15856/pm-claude-skills1,4412026年10月13日 更新

Build or tailor an academic CV for faculty, postdoc, research or fellowship applications: publications, grants, teaching, supervision and service in the order the field expects, with consistent citations. Use when asked to write my academic CV, update my CV for a lectureship, tenure-track or postdoc application, format my publications list, or adapt my academic CV for an industry research role. Produces the full academic CV, a field-appropriate section order, a clean publications list in one citation style, and a two-page summary version when asked.

日本語の概要は準備中です。原文の説明を表示しています。

mohitagw15856/pm-claude-skills1,4412026年10月13日 更新

Generate a WCAG 2.2 accessibility audit checklist and remediation suggestions for any UI or design. Use when asked to audit for accessibility, check WCAG compliance, review a design for a11y issues, or create an accessibility remediation plan. Produces a prioritised checklist with pass/fail assessments and specific fixes.

日本語の概要は準備中です。原文の説明を表示しています。

mohitagw15856/pm-claude-skills1,4412026年10月13日 更新

mohitagw15856 のスキルをすべて見る

このスキルの問題を報告する