Scope a milestone to a fixed time window with variable scope. Use when the user says "scope this milestone", "what fits in the sprint", "cut scope for the release", "define the MVP for this milestone", "we need to ship by [date] what do we cut", "shape the work to fit the cycle", or needs to make hard scope decisions under a time constraint - even if they don't explicitly say "milestone scoping". Based on "Shape Up" by Ryan Singer (appetite, shaping, betting table) and "The Art of Project Management" by Scott Berkun (milestones as forcing functions, scope as a variable).

インストール方法を見る

含まれるファイル(1)

  • SKILL.md6.2 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Overview

Based on "Shape Up" by Ryan Singer and "The Art of Project Management" by Scott Berkun. The key insight both books share: time is fixed, scope is the variable. Most delivery failures come from treating scope as fixed and time as the flex - which produces the worst outcome (late delivery of bloated scope). A milestone scoped correctly defines what "done enough to ship" looks like within a fixed window, and explicitly names what is deferred.

Workflow

Step 1: Lock the time boundary

Before touching scope, get the time constraint on the table. Ask:

  • What is the milestone date or sprint end date?
  • Is this date moveable? (If yes, scope discussion changes. If no, proceed.)
  • What is the sprint or cycle length?

Shape Up rule: appetite is decided before scope. If the team is willing to spend 6 weeks on this, that is different from 2 weeks - and the solution should change accordingly, not the timeline.

Step 2: Identify the core job to be done

Ask: "What is the one thing this milestone must accomplish for it to be worth shipping?"

This is not a feature list. It is a user or business outcome:

  • "Users can complete checkout without calling support"
  • "The migration is live with zero data loss"
  • "Engineering team has a working CI pipeline"

If the user gives a list of features instead of an outcome, push back: "Which of these features, if not shipped, would make the milestone not worth shipping?"

Step 3: Sort everything into Must / Should / Cut

Take the full feature list or backlog for this milestone and classify each item:

CategoryCriteriaAction
MustThe milestone does not achieve its core job without thisIn scope, non-negotiable
ShouldValuable, improves the outcome, but the milestone ships without itIn scope if capacity allows
CutNice to have, or solvable with a workaround for nowExplicitly deferred to next cycle

Berkun's forcing function test for each item: "If we cut this, does the milestone still meet its core job?" If yes, it is a Should or Cut - not a Must.

Step 4: Apply the fat marker sketch

For each Must item, describe it at the right altitude using Shape Up's fat marker principle:

  • Write what the user can do, not how it is built
  • Leave room for engineers to make implementation decisions
  • Flag the rabbit holes: specific traps or complexity that would blow the scope
MUST: [feature/capability]
User can: [what they can do in 1 sentence]
Rabbit holes to avoid: [specific traps - e.g., "don't rebuild the notification system, use existing email infra"]
Complexity signal: [anything here that could expand scope unexpectedly]

Step 5: Generate the milestone scope document

MILESTONE SCOPE - [milestone name]
Cycle: [start date] to [end date]
Core job: [outcome this milestone achieves]

IN SCOPE (Must)
1. [Feature/capability] - [one-sentence user-facing description]
   Rabbit holes: [traps to avoid]

2. [Feature/capability] - [description]
   Rabbit holes: [traps to avoid]

IN SCOPE IF CAPACITY ALLOWS (Should)
- [Feature] - [description]
- [Feature] - [description]

OUT OF SCOPE (explicitly deferred)
- [Feature]: [why deferred, when it will be revisited]
- [Feature]: [rationale]

OPEN QUESTIONS (must resolve in first half of cycle)
- [Question] - Owner: [name] - Due: [date]

DONE CRITERIA
The milestone is complete when:
- [Specific, measurable condition 1]
- [Specific, measurable condition 2]
- [No Sev 1 defects / performance threshold / user acceptance criteria]

Step 6: Run the scope pressure test

Before locking the scope, ask these three questions:

  1. "If the team discovers this takes 30% longer than expected, what gets cut first?" - The answer should be the Should list. If there is no answer, the scope is under-specified.

  2. "Is there anything on the Must list that a team member might reasonably interpret as 10x bigger than we intend?" - If yes, add a rabbit hole note to that item.

  3. "Is there a workaround that satisfies the core job without building this feature?" - If yes, move it to Should or Cut.

Anti-Patterns

1. Treating the feature list as the milestone Bad: "Milestone 2 = [list of 15 features]" Good: "Milestone 2 = users can complete onboarding without contacting support. These 4 features make that possible."

2. No explicit Cut list Bad: Scope document with only what is included. Good: Out of scope section is as important as in scope. It prevents scope creep during build and manages stakeholder expectations.

3. Must list too large Bad: 12 items in the Must category. Good: Must items should be completable in 70% of the cycle window, leaving buffer for Should and unexpected work. If Must is too large, the real Must list is not yet defined.

4. Rabbit holes not named Bad: "Build the reporting dashboard" with no caveats. Good: "Build the reporting dashboard. Rabbit hole: don't build custom chart library - use existing components. Don't add export to PDF in v1."

5. Done criteria are vague Bad: "Milestone is done when features are built." Good: "Done when: all P0 user stories are accepted, no Sev 1 defects, performance under 200ms on target hardware, stakeholder sign-off received."

Quality Checklist

  • Time boundary is fixed and stated at the top
  • Core job is one outcome statement, not a feature list
  • Every item is classified as Must / Should / Cut
  • Must items have fat marker descriptions with rabbit holes named
  • Out of scope section is explicit with rationale for each deferred item
  • Done criteria are measurable, not subjective
  • Scope pressure test has been run (what gets cut if capacity is short?)

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Rate any product, feature, or experience on the 11-star scale (Brian Chesky's Airbnb thought experiment). Use when user says "rate this experience", "11-star", "star rating", "experience audit", "how good is this", "experience rating", "product audit", "quality assessment", or wants to evaluate product quality and identify improvement paths. Also trigger when user wants to benchmark a feature, assess where a product stands, or map out what "great" looks like - even if they don't explicitly say "11-star".

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

Generate A/B copy variants grounded in Eugene Schwartz's awareness and market-sophistication stages and John Caples' tested-headline discipline. Every variant declares its angle, the awareness stage it targets, and a falsifiable hypothesis, and the skill recommends which pair to test first and what delta counts as signal. Use when the user says "A/B test this", "write variants", "give me options", "test different angles", "copy variants", "ab copy", "test this headline", "multiple versions", "which version is better", or wants to test copy before publishing. For reviewing copy that already exists, see copy-review. For sample size and stopping rules, see growth-experiment. For diagnosing a page rather than its words, see page-cro. For full paid ad sets by platform, see ad-campaign-writer.

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

Write measurable acceptance criteria for requirements or user stories. Use when the user says "write acceptance criteria", "definition of done", "how do we test this", "fit criteria", "given when then", "Gherkin scenarios", "what does done look like", "testable conditions", "how will we know this works" - even if they don't explicitly say "acceptance criteria".

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

Build a strategic account plan for winning, retaining, or expanding a named account. Use when the user says "build an account plan", "strategic account planning", "how do I grow this account", "account expansion strategy", "whitespace analysis", "QBR prep", "key account review", "map the stakeholders in this account", "land and expand plan", "how do I break into [company]", or wants a structured strategy for a specific account.

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

Write paid ad copy for LinkedIn, Google, Meta, and YouTube. Produces multiple variants per platform, each targeting a different Eugene Schwartz awareness level and Cialdini persuasion principle. Use when the user asks for ad copy, ad variants, "write LinkedIn ads", Google ads, Meta ads, paid social copy, ad headlines, or wants creative for a paid campaign. Reads brand voice, ICP, and positioning from knowledge/. For organic social posts, see linkedin-post or social-calendar. For the landing page the ad points at, see landing-page-writer. For testing variants, see ab-copy-writer.

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

Design clean and consistent APIs. Use when the user says "design an API", "API design review", "design these endpoints", "REST API for X", "GraphQL schema", "API contract", "how should this endpoint work", "review my API design", or wants to create or improve an API interface - even if they don't explicitly say "API design".

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

qa-aman のスキルをすべて見る

このスキルの問題を報告する