本文へ移動
cccskills
無料GitHub で公開

risk-register

Maintain a centralized living risk register across projects. Use this skill when: - You need to create or update a risk register for a project or feature - You want to consolidate risks from individual specs into one register - You need to review and update risk status, mitigations, and owners - You want a cross-project risk view

インストール方法を見る

含まれるファイル(1)

  • SKILL.md2.7 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Risk Register

Centralized risk register that consolidates risks from individual spec sections into one living document.

Workflow

  1. Determine scope — Single spec, single project, or cross-project
  2. Read Risks and Assumptions from relevant specs
  3. If existing register exists, read and merge (don't duplicate — match by description)
  4. Assess each risk using the likelihood x impact matrix
  5. Output register

Risk Assessment Matrix

Likelihood: Low (unlikely) | Medium (possible) | High (probable) Impact: Low (minor inconvenience) | Medium (feature degradation) | High (critical failure/data loss)

Low ImpactMedium ImpactHigh Impact
High LikelihoodMediumHighCritical
Medium LikelihoodLowMediumHigh
Low LikelihoodLowLowMedium

Output Format

# Risk Register — {Scope}

**Last Updated:** {DD-MM-YYYY}
**Total Risks:** {n} | Open: {n} | Mitigated: {n} | Closed: {n}

## Risk Summary

| ID | Risk | Source | Likelihood | Impact | Priority | Owner | Mitigation | Status | Last Reviewed |
|----|------|--------|-----------|--------|----------|-------|-----------|--------|--------------|
| R-001 | {desc} | {spec/feature} | H/M/L | H/M/L | Critical/High/Med/Low | {name/role} | {plan} | Open/Mitigated/Closed | {date} |

## Critical Risks
{Filtered view of Critical priority — requires immediate attention}

## Risk Trends
- New risks this period: {n}
- Risks closed this period: {n}
- Overdue reviews: {risks not reviewed in 30+ days}

Rules

  • Every risk MUST have an owner (name or role, not "TBD")
  • Every risk MUST have a mitigation plan (not empty)
  • Review date updates when risk is revisited
  • Risk IDs are sequential (R-001, R-002) and never reused
  • When merging with existing register, preserve existing IDs
  • Separate risks from assumptions — only risks go in the register

Anti-Patterns

  • Don't create a risk without a mitigation plan — "TBD" is not acceptable
  • Don't reuse risk IDs — closed risks keep their IDs
  • Don't mix risks and assumptions — they're different things

Quality Checklist

  • Every risk has an owner
  • Every risk has a mitigation plan
  • Likelihood x Impact matrix applied
  • Critical risks highlighted
  • Risk IDs are sequential and unique

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Rate any product, feature, or experience on the 11-star scale (Brian Chesky's Airbnb thought experiment). Use when user says "rate this experience", "11-star", "star rating", "experience audit", "how good is this", "experience rating", "product audit", "quality assessment", or wants to evaluate product quality and identify improvement paths. Also trigger when user wants to benchmark a feature, assess where a product stands, or map out what "great" looks like - even if they don't explicitly say "11-star".

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

Generate A/B copy variants grounded in Eugene Schwartz's awareness and market-sophistication stages and John Caples' tested-headline discipline. Every variant declares its angle, the awareness stage it targets, and a falsifiable hypothesis, and the skill recommends which pair to test first and what delta counts as signal. Use when the user says "A/B test this", "write variants", "give me options", "test different angles", "copy variants", "ab copy", "test this headline", "multiple versions", "which version is better", or wants to test copy before publishing. For reviewing copy that already exists, see copy-review. For sample size and stopping rules, see growth-experiment. For diagnosing a page rather than its words, see page-cro. For full paid ad sets by platform, see ad-campaign-writer.

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

Write measurable acceptance criteria for requirements or user stories. Use when the user says "write acceptance criteria", "definition of done", "how do we test this", "fit criteria", "given when then", "Gherkin scenarios", "what does done look like", "testable conditions", "how will we know this works" - even if they don't explicitly say "acceptance criteria".

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

Build a strategic account plan for winning, retaining, or expanding a named account. Use when the user says "build an account plan", "strategic account planning", "how do I grow this account", "account expansion strategy", "whitespace analysis", "QBR prep", "key account review", "map the stakeholders in this account", "land and expand plan", "how do I break into [company]", or wants a structured strategy for a specific account.

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

Write paid ad copy for LinkedIn, Google, Meta, and YouTube. Produces multiple variants per platform, each targeting a different Eugene Schwartz awareness level and Cialdini persuasion principle. Use when the user asks for ad copy, ad variants, "write LinkedIn ads", Google ads, Meta ads, paid social copy, ad headlines, or wants creative for a paid campaign. Reads brand voice, ICP, and positioning from knowledge/. For organic social posts, see linkedin-post or social-calendar. For the landing page the ad points at, see landing-page-writer. For testing variants, see ab-copy-writer.

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

Design clean and consistent APIs. Use when the user says "design an API", "API design review", "design these endpoints", "REST API for X", "GraphQL schema", "API contract", "how should this endpoint work", "review my API design", or wants to create or improve an API interface - even if they don't explicitly say "API design".

日本語の概要は準備中です。原文の説明を表示しています。

qa-aman/claude-skills202026年9月10日 更新

qa-aman のスキルをすべて見る

このスキルの問題を報告する