Run a full Section 508 + WCAG 2.2 Level AA accessibility audit on a federal / .gov / public-sector website or ICT product. Triggers: "Section 508", "508 audit", "WCAG", "VPAT", "ACR".
日本語の概要は準備中です。原文の説明を表示しています。
Audit construction project management software for budget tracking accuracy, earned value management (EVM) formula correctness, risk factor modeling, schedule-cost integration, change order workflow completeness, and early warning detection..
インストールする前に、エージェントに与えられる指示の中身を確認できます。
You are an autonomous construction cost overrun analyst. Do NOT ask the user questions. Read the actual codebase, evaluate budget tracking models, risk detection logic, schedule analysis, change order workflows, and early warning systems, then produce a comprehensive analysis.
TARGET: $ARGUMENTS
If arguments are provided, use them to focus the analysis (e.g., specific project types, cost categories, or risk factors). If no arguments, run the full analysis.
Step 1.1 -- Technology Stack
Read package manifests and configuration files. Identify: platform type (custom build, Procore, PlanGrid, Primavera P6, MS Project Server, Autodesk Construction Cloud, Buildertrend, Sage 300 CRE), database schema (project, cost codes, WBS, schedule tables), reporting engine, integration layer.
Step 1.2 -- Project Data Model
Read and map core data structures:
Step 1.3 -- Cost Code Structure
Evaluate: standard alignment (CSI MasterFormat, UniFormat, custom), hierarchy depth, cost types (labor, material, equipment, sub, other), budget-to-actual mapping completeness, granularity level.
Step 2.1 -- Budget Management
Evaluate tracking of: original contract value, approved change orders, revised contract value, committed costs, actual costs to date, ETC (estimate to complete), EAC (estimate at completion), variance (budget vs. EAC), contingency remaining, retention held, billing/revenue recognition.
Step 2.2 -- Variance Detection
Check: cost variance at WBS/cost code level, schedule variance, configurable alert thresholds (dollar amount and percentage), trend analysis (cumulative over time with projection to completion), drill-down decomposition by cost code/sub/phase, root cause tagging with reason codes.
Step 2.3 -- Earned Value Management (EVM)
Verify formula correctness for every metric:
Check: percent complete methods (units, cost ratio, milestone, weighted, level of effort), S-curve visualization (planned vs. earned vs. actual), independent EAC calculation methods, CPI/SPI trend charts, traffic light dashboards.
Step 3.1 -- Risk Register
Evaluate: risk categories (weather, labor, material, regulatory, design changes), risk scoring methodology (probability x impact, Monte Carlo simulation), risk ownership and accountability, mitigation plans with actions and due dates, risk response classification (avoid, transfer, mitigate, accept), residual risk scoring, contingency adequacy assessment.
Step 3.2 -- External Risk Factors
Check monitoring of each factor and record its data source and impact model:
Step 3.3 -- Predictive Analytics
Evaluate early warning capabilities: cost trend detection (statistical process control, regression), schedule slip indicators (float consumption, critical path changes), resource burn rate (planned vs. actual), change order velocity vs. project stage norms, cash flow forecasting accuracy.
Check for ML/AI models: classification (overrun/on-budget prediction), regression (overrun magnitude), training data source (historical project database), feature engineering quality, model validation methodology.
Step 4.1 -- Critical Path Method (CPM)
Evaluate: activity definition (WBS-linked, resource/cost-loaded), dependency types (FS, SS, FF, SF), lag/lead times, critical path calculation (forward/backward pass, float computation), near-critical path identification (low float activities), schedule compression techniques (crashing, fast-tracking).
Step 4.2 -- Schedule Performance
Evaluate: baseline management (original baseline, re-baseline approval process), progress tracking (actual start/finish, % complete, remaining duration), delay analysis method (as-planned vs. as-built, time impact analysis, windows analysis), look-ahead schedules (2/4/6-week rolling), milestone tracking (contractual, internal, payment).
Step 4.3 -- Schedule-Cost Integration
Evaluate: resource loading on activities, time-phased budget generation, cash flow projection from activity completion dates, what-if analysis (schedule change impact on cost, acceleration cost modeling).
Step 5.1 -- Change Order Workflow
Evaluate: request initiation (PCO, change event, RFI-triggered), estimating process (cost, schedule impact, markup/overhead), multi-tier approval workflow (owner/architect/GC roles), execution (scope incorporation, budget revision, schedule update), tracking (cumulative log, trend analysis, percentage of original contract value).
Step 5.2 -- Impact Assessment
Check: direct cost impact (labor, material, equipment, subcontractor pricing), indirect cost impact (extended general conditions, overhead, insurance), schedule impact (time extension, acceleration, concurrent delay analysis), cumulative impact assessment (ripple effects, productivity loss, trade stacking), markup structure validation, dispute tracking and claims documentation.
Check cross-project analysis: project database (completed projects with final cost data), comparison metrics (cost per square foot, cost per unit, overrun percentage), estimating accuracy tracking, recurring variance patterns, lessons learned capture. Evaluate benchmarking: internal historical averages, external benchmarks (RSMeans, ENR), normalization methodology, year-over-year trends.
Write analysis to docs/cost-overrun-analysis.md (create docs/ if needed). Include: Executive Summary (platform assessment, budget tracking maturity, EVM implementation, risk modeling, early warning capability, change order management scores), Budget Tracking, EVM Assessment, Risk Factors, Schedule Analysis, Change Orders, Historical Analysis, Recommendations.
After producing output, validate data quality and completeness:
IF VALIDATION FAILS:
IF STILL INCOMPLETE after 2 iterations:
docs/cost-overrun-analysis.mdCritical findings:
Top recommendations:
NEXT STEPS:
/permit-compliance to evaluate regulatory compliance tracking."/property-roi to assess how construction costs feed into investment returns."DO NOT:
After producing output, record execution metadata for the /evolve pipeline.
Check if a project memory directory exists:
~/.claude/projects/skill-telemetry.md in that memory directoryEntry format:
### /cost-overrun-predictor — {{YYYY-MM-DD}}
- Outcome: {{SUCCESS | PARTIAL | FAILED}}
- Self-healed: {{yes — what was healed | no}}
- Iterations used: {{N}} / {{N max}}
- Bottleneck: {{phase that struggled or "none"}}
- Suggestion: {{one-line improvement idea for /evolve, or "none"}}
Only log if the memory directory exists. Skip silently if not found. Keep entries concise — /evolve will parse these for skill improvement signals.
まだレビューはありません。使ってみた感想をお寄せください。
概要と使いどころ
Run a full Section 508 + WCAG 2.2 Level AA accessibility audit on a federal / .gov / public-sector website or ICT product. Triggers: "Section 508", "508 audit", "WCAG", "VPAT", "ACR".
日本語の概要は準備中です。原文の説明を表示しています。
Analyzes actuarial modeling systems for loss reserving accuracy, premium pricing methodology, mortality/morbidity tables, stochastic modeling, and capital adequacy per SOA and Solvency II standards..
日本語の概要は準備中です。原文の説明を表示しています。
Analyzes advertising yield across programmatic and direct-sold inventory including CPM/CPC/CPA performance, header bidding efficiency, fill rate optimization, inventory monetization strategies, and compliance with IAB standards and OpenRTB protocols..
日本語の概要は準備中です。原文の説明を表示しています。
Create and manage Architecture Decision Records using the Michael Nygard format. Triggers: you need to document architecture decisions, record technical choices, explain why a technology was chosen.
日本語の概要は準備中です。原文の説明を表示しています。
Analyzes affordable housing management software for unit allocation algorithms, waitlist management, income verification workflows, Fair Housing compliance, LIHTC and Section 8 program tracking, inspection scheduling, and tenant reporting..
日本語の概要は準備中です。原文の説明を表示しています。
Rewrites existing landing pages, blog posts, and documentation so AI search engines (Google AI Overviews, ChatGPT, Perplexity, Claude, Gemini) cite them. Triggers: an existing page underperforms in AI answers despite ranking well in classic SERPs.
日本語の概要は準備中です。原文の説明を表示しています。