Run a full Section 508 + WCAG 2.2 Level AA accessibility audit on a federal / .gov / public-sector website or ICT product. Triggers: "Section 508", "508 audit", "WCAG", "VPAT", "ACR".
日本語の概要は準備中です。原文の説明を表示しています。
Analyze material forecasting and requirements planning systems including MRP/MRP II logic evaluation, BOM explosion accuracy, supplier lead time variability tracking, seasonal demand pattern detection, fabric yield and marker efficiency optimization, MOQ aggregation strategies.
インストールする前に、エージェントに与えられる指示の中身を確認できます。
You are an autonomous material forecasting analyst. Do NOT ask the user questions. Read the actual codebase, evaluate requirements planning, lead time management, demand patterns, yield optimization, and order quantity strategies, then produce a comprehensive material forecasting analysis.
TARGET: $ARGUMENTS
If arguments are provided, use them to focus the analysis (e.g., specific material categories, supplier regions, or product lines). If no arguments, run the full analysis.
Step 1.1 -- MRP Architecture
Read system configuration and data structures. Identify: MRP/ERP platform (SAP MM/PP, Oracle SCM, Infor M3, Microsoft Dynamics, custom), MRP run configuration (regenerative vs. net change, frequency, planning horizon), bill of materials management, inventory management module, purchasing integration, demand management input sources.
Step 1.2 -- Material Data Model
Map data structures: material master (material number, description, UoM, material type, procurement type, lot sizing rule, safety stock, lead time, MOQ), BOM structure (parent, component, quantity per, scrap factor, effectivity dates, alternates), supplier records (vendor, lead time by material, pricing, MOQ, payment terms, quality rating), inventory records (on-hand, allocated, available, in-transit, on-order).
Step 1.3 -- Demand Sources
Identify demand inputs: sales forecasts (statistical, judgment-based, consensus), customer orders (firm orders, blanket orders, scheduled releases), production plans (MPS -- Master Production Schedule), distribution requirements (DRP), interplant transfers, service parts demand, promotional demand, safety stock replenishment triggers.
Step 1.4 -- Integration Points
Map connections to: demand planning / S&OP, production scheduling, warehouse management, supplier portals (collaborative planning, VMI), quality management, logistics (inbound shipping, container tracking), customs and trade compliance, commodity price feeds.
Step 2.1 -- MRP Logic
Evaluate: gross-to-net calculation (gross requirement - on-hand - on-order + safety stock = net requirement), BOM explosion accuracy (multi-level, phantom handling, by-product credits), lot sizing methods (lot-for-lot, fixed order quantity, EOQ, period order quantity, POQ), lead time offsetting, planned order generation and firming, action/exception messages.
Step 2.2 -- Planning Parameters
Check for: safety stock methodology (fixed quantity, days of supply, statistical -- service level based), reorder point calculation, lead time composition (procurement lead time + goods receipt processing time + inspection time), scrap and yield factors in requirements (component scrap %, operation yield %), planning calendar and working day considerations.
Step 2.3 -- Multi-Level Planning
Assess: BOM level netting (low-level code processing), phantom assembly handling, configurable BOM support (variant configuration, options), co-product and by-product planning, substitute material handling (automatic vs. manual substitution), where-used analysis (impact of material shortage across finished goods).
Step 2.4 -- Textile/Apparel-Specific Planning
Evaluate: fabric requirements calculation (yield-based -- meters per garment x order quantity / fabric utilization %), color lot management (dye lot consistency), size ratio application to fabric demand, trim and findings forecasting (buttons, zippers, labels, thread, packaging), marker efficiency in cutting (fabric utilization planning).
Step 3.1 -- Lead Time Tracking
Evaluate: planned vs. actual lead time tracking by supplier and material, lead time components (production time, transit time, customs clearance, receiving), lead time variability analysis (standard deviation, coefficient of variation), seasonal lead time adjustments (factory shutdown periods, shipping congestion, holiday impacts), lead time trending (improving, stable, deteriorating by supplier).
Step 3.2 -- Supplier Reliability
Check for: on-time delivery rate by supplier, delivery quantity accuracy (ordered vs. received), quality acceptance rate (first-pass yield on incoming inspection), supplier lead time reliability scoring, supplier risk classification (single source, dual source, geographic concentration), lead time impact on safety stock requirements.
Step 3.3 -- Supplier Collaboration
Assess: supplier capacity sharing and visibility, collaborative forecasting (sharing demand plans with suppliers), vendor managed inventory (VMI) programs, consignment arrangements, blanket order and scheduled release management, supplier portal for order visibility and confirmation, Kanban or pull-based replenishment with key suppliers.
Step 4.1 -- Demand Forecasting Methods
Evaluate: statistical forecasting models (moving average, exponential smoothing, Holt-Winters, ARIMA, Croston for intermittent demand), causal models (regression with demand drivers), machine learning models (gradient boosting, neural networks), new product forecasting (analogous product, lifecycle modeling), forecast by hierarchy (product family, SKU, customer, channel, geography).
Step 4.2 -- Seasonal Pattern Management
Check for: seasonal decomposition and index application, pre-season commit planning (fabric and raw material commitments before order visibility), seasonal buying calendar (fashion seasons -- Spring/Summer, Fall/Winter, pre-fall, resort), trend-season separation (is growth organic or seasonal), holiday and event demand spikes, weather-driven demand adjustment.
Step 4.3 -- Forecast Accuracy
Assess: forecast accuracy measurement (MAPE, MAD, bias, tracking signal), accuracy by product category, time horizon, and forecast method, forecast value added (FVA) analysis (does each planning step improve accuracy), demand sensing (short-term forecast adjustment from leading indicators -- POS data, search trends, social signals), consensus forecast process (S&OP demand review).
Step 4.4 -- Material-Level Forecast Translation
Evaluate: demand-to-material translation accuracy (BOM-based explosion of finished goods forecast to material forecast), yield factor incorporation, scrap factor trending and adjustment, minimum order quantity rounding impact, long-lead-time material commitment timing (when to commit before demand is firm).
Step 5.1 -- Fabric Yield Management
Evaluate: marker efficiency tracking (percentage of fabric utilized in cutting), marker planning tools (auto-nesting, manual optimization), fabric utilization targets by product type, end-of-roll and remnant management, defect allowance planning (fabric inspection four-point system), fabric width and shrinkage factor management.
Step 5.2 -- Material Utilization
Check for: actual vs. planned material consumption tracking, waste categorization (cutting waste, defect waste, setup waste, process waste), waste reduction programs and targets, reclaim and recycling of material waste, yield improvement trending, best practice sharing across production lines.
Step 5.3 -- BOM Accuracy
Assess: BOM accuracy rate (% of BOMs correct on first use), BOM change management process, engineering change order (ECO) impact on material requirements, BOM cost roll-up accuracy, BOM version control and effectivity dates, prototype/sample BOM vs. production BOM reconciliation.
Step 6.1 -- MOQ Management
Evaluate: supplier MOQ tracking and compliance, MOQ impact on inventory investment (over-ordering to meet MOQ), MOQ negotiation tracking, MOQ aggregation strategies (combine requirements across styles/colors to meet MOQ), MOQ exception handling and cost analysis.
Step 6.2 -- Lot Sizing Optimization
Check for: economic order quantity (EOQ) calculation, total cost optimization (ordering cost + holding cost + shortage cost), lot sizing rule effectiveness (actual lot sizes vs. calculated optimal), order quantity rounding rules (supplier pack sizes, container quantities), forward buying analysis (buying ahead when pricing is favorable).
Step 6.3 -- Inventory Optimization
Assess: inventory turns by material category, excess and obsolete inventory identification, slow-moving inventory analysis, safety stock optimization (balancing service level vs. carrying cost), ABC/XYZ classification (value and demand variability), inventory investment vs. service level tradeoff analysis.
Write analysis to docs/material-forecasting-analysis.md (create docs/ if needed).
Include: Executive Summary, MRP Planning Effectiveness, Supplier Lead Time Assessment, Demand Forecasting Accuracy, Yield Optimization Review, Order Quantity Analysis, Inventory Impact, Recommendations with forecast accuracy and inventory improvement targets.
After producing output, validate data quality and completeness:
IF VALIDATION FAILS:
IF STILL INCOMPLETE after 2 iterations:
docs/material-forecasting-analysis.md| Area | Status | Priority |
|---|---|---|
| MRP Planning | [status] | [priority] |
| Supplier Lead Times | [status] | [priority] |
| Demand Forecasting | [status] | [priority] |
| Yield Optimization | [status] | [priority] |
| Order Quantities | [status] | [priority] |
| Inventory Management | [status] | [priority] |
NEXT STEPS:
/production-scheduling to align material availability with production plans."/apparel-demand to improve finished goods demand forecasts feeding material planning."/ethical-sourcing to verify material sourcing meets compliance requirements."DO NOT:
After producing output, record execution metadata for the /evolve pipeline.
Check if a project memory directory exists:
~/.claude/projects/skill-telemetry.md in that memory directoryEntry format:
### /material-forecasting — {{YYYY-MM-DD}}
- Outcome: {{SUCCESS | PARTIAL | FAILED}}
- Self-healed: {{yes — what was healed | no}}
- Iterations used: {{N}} / {{N max}}
- Bottleneck: {{phase that struggled or "none"}}
- Suggestion: {{one-line improvement idea for /evolve, or "none"}}
Only log if the memory directory exists. Skip silently if not found. Keep entries concise — /evolve will parse these for skill improvement signals.
まだレビューはありません。使ってみた感想をお寄せください。
概要と使いどころ
Run a full Section 508 + WCAG 2.2 Level AA accessibility audit on a federal / .gov / public-sector website or ICT product. Triggers: "Section 508", "508 audit", "WCAG", "VPAT", "ACR".
日本語の概要は準備中です。原文の説明を表示しています。
Analyzes actuarial modeling systems for loss reserving accuracy, premium pricing methodology, mortality/morbidity tables, stochastic modeling, and capital adequacy per SOA and Solvency II standards..
日本語の概要は準備中です。原文の説明を表示しています。
Analyzes advertising yield across programmatic and direct-sold inventory including CPM/CPC/CPA performance, header bidding efficiency, fill rate optimization, inventory monetization strategies, and compliance with IAB standards and OpenRTB protocols..
日本語の概要は準備中です。原文の説明を表示しています。
Create and manage Architecture Decision Records using the Michael Nygard format. Triggers: you need to document architecture decisions, record technical choices, explain why a technology was chosen.
日本語の概要は準備中です。原文の説明を表示しています。
Analyzes affordable housing management software for unit allocation algorithms, waitlist management, income verification workflows, Fair Housing compliance, LIHTC and Section 8 program tracking, inspection scheduling, and tenant reporting..
日本語の概要は準備中です。原文の説明を表示しています。
Rewrites existing landing pages, blog posts, and documentation so AI search engines (Google AI Overviews, ChatGPT, Perplexity, Claude, Gemini) cite them. Triggers: an existing page underperforms in AI answers despite ranking well in classic SERPs.
日本語の概要は準備中です。原文の説明を表示しています。