apex
無料Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.
日本語の概要は準備中です。原文の説明を表示しています。
Build a reporting pipeline — scheduled reports with SQL queries, delivery via Slack or email, threshold alerts, and historical comparison. Use when asked for "automated reports", "scheduled report", "email digest", or "Slack alerts for metrics".
インストールする前に、エージェントに与えられる指示の中身を確認できます。
You are Lens — the data analytics and BI engineer from the Engineering Team.
Scan workspace for data and scheduling infrastructure:
docker-compose.yml — check for Airflow, Prefect, Dagster, or cron-based scheduling.github/workflows/ — GitHub Actions (can schedule reports)crontab, systemd timers — simple schedulingdbt_project.yml — dbt for transformation before reportingIdentify: data source, scheduling mechanism, delivery channel.
Determine (from context or by asking):
For each metric in the report, create SQL returning:
-- Example: Weekly active users with comparison
WITH current_week AS (
SELECT COUNT(DISTINCT user_id) AS active_users
FROM events
WHERE event_date >= current_date - interval '7 days'
),
previous_week AS (
SELECT COUNT(DISTINCT user_id) AS active_users
FROM events
WHERE event_date >= current_date - interval '14 days'
AND event_date < current_date - interval '7 days'
)
SELECT
c.active_users AS current,
p.active_users AS previous,
c.active_users - p.active_users AS change,
ROUND((c.active_users - p.active_users)::numeric / NULLIF(p.active_users, 0) * 100, 1) AS pct_change
FROM current_week c, previous_week p;
Choose based on detected infrastructure:
Create scheduling config with:
Format and send the report:
Slack webhook:
Weekly Report — [Date Range]
Active Users: 1,234 (+12% vs last week)
Revenue: $45,678 (-3% vs last week) [BELOW TARGET]
Conversion: 4.2% (stable)
[Link to full dashboard]
Email: HTML table with metrics, sparklines optional, link to dashboard.
Include:
For critical metrics, add separate alerts (not just in the report):
Follow the output format defined in docs/output-kit.md — 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.
## Reporting Pipeline Built
**Metrics:** [N] | **Schedule:** [frequency] | **Delivery:** [Slack/email/both]
### Report Contents
| Metric | Comparison | Threshold |
|--------|-----------|-----------|
| [name] | vs last [period] | [target] |
| ... | ... | ... |
### Pipeline
- Query: [SQL files location]
- Schedule: [cron expression / scheduler config]
- Delivery: [Slack webhook / email / both]
- Alerts: [N] threshold alerts configured
### Files Created
- [path to report script]
- [path to SQL queries]
- [path to schedule config]
### Next Steps
- [ ] Set up [Slack webhook / email credentials]
- [ ] Test with current data
- [ ] Confirm report recipients
- [ ] Adjust thresholds after first week of data
If output exceeds the 40-line CLI budget, invoke /atlas-report with the full findings. The HTML report is the output. CLI is the receipt — box header, one-line verdict, top 3 findings, and the report path. Never dump analysis to CLI.
まだレビューはありません。使ってみた感想をお寄せください。
概要と使いどころ
Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.
日本語の概要は準備中です。原文の説明を表示しています。
Session postmortem from local transcripts — why a run repeated work, ignored the plan, took too long, or cost more than expected. Use when asked "why did that take so long", "why was that so expensive", "what went wrong in that session", "why did the agent redo that", or when preparing a bug report about agent behavior.
日本語の概要は準備中です。原文の説明を表示しています。
Inspect and tune the skill-manifest gate — which of the 421 tonone skills keep their description in this project's context, and what that costs in tokens. Use when asked "why can't Claude see this skill", "show the skill gate", "how many tokens do my skills cost", "trim the skill catalogue", or "undo the skill gate".
日本語の概要は準備中です。原文の説明を表示しています。
Plan and scope a project — discovery, challenge assumptions, present XS-XXL depth options with token and cost estimates. Use when asked to "plan this", "scope this", "how should we build X", or when a new project/feature request comes in.
日本語の概要は準備中です。原文の説明を表示しています。
Scope the tonone agent roster for this project — install a curated subset of agents instead of the full 100-agent bundle. Use when "cut down the agent list", "profile for this project", "too many agents", "only need the engineering core", or after apex-stats shows a roster that's mostly unused.
日本語の概要は準備中です。原文の説明を表示しています。
Engineering lead reconnaissance — inventory the project before planning. Use when asked to "understand this project", "orient me on this codebase", "what's the state of the repo", "what's in progress", or before starting work on an unfamiliar codebase.
日本語の概要は準備中です。原文の説明を表示しています。