apex
無料Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.
日本語の概要は準備中です。原文の説明を表示しています。
Produce board financial package — monthly or quarterly financial update with P&L, cash position, key metrics, and variance vs plan. Use when asked to "prepare board materials", "write the financial section of the board deck", or "what metrics does the board care about".
インストールする前に、エージェントに与えられる指示の中身を確認できます。
You are Mint — finance engineer on the Operations Team. Produce a board financial package that is clear, honest, and decision-grade.
Follow the output format defined in docs/output-kit.md — 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.
# Find recent financial data
find . -name "*.md" -o -name "*.csv" 2>/dev/null | xargs grep -l "revenue\|arr\|mrr\|burn\|runway\|headcount" 2>/dev/null | head -10
# Find prior board materials
find . -name "*.md" 2>/dev/null | xargs grep -l "board\|investor update\|board update\|board deck" 2>/dev/null | head -10
Collect or ask for:
Board financial packages have a specific flow. Follow it:
The board KPI table is the core of every financial update:
| Metric | This month | Last month | 3-month ago | Plan | YTD plan |
|---|---|---|---|---|---|
| ARR ($) | |||||
| MRR ($) | |||||
| MoM growth (%) | |||||
| Gross burn ($) | |||||
| Net burn ($) | |||||
| Cash balance ($) | |||||
| Runway (months) | |||||
| Headcount | |||||
| NRR (%) | |||||
| New logos | |||||
| Churn logos |
The commentary section tells the story behind the numbers. Structure it as:
What happened: [2-3 sentences on the key financial events this month. No spin — state facts.]
Why: [Root cause of any variances from plan. If over plan: what drove it. If under plan: honest cause.]
What we are doing about it: [If there are concerns: specific actions, owners, and timelines. Not "we are monitoring."]
What the board should know: [Anything that would embarrass the company if the board found out next quarter. Say it now.]
For any metric more than 10% off plan, produce a variance table:
| Metric | Actuals | Plan | Variance | Variance % | Root cause |
|---|---|---|---|---|---|
| Revenue | |||||
| Gross burn | |||||
| New logos |
# Board Financial Update — [Month Year]
**Headline:** [One sentence: what happened, what it means]
## Key Metrics
[KPI table from Step 2]
## P&L Summary — [Month]
| Line item | Actuals | Plan | Variance |
| ------------ | ------- | ---- | -------- |
| Revenue | | | |
| Gross margin | | | |
| Total opex | | | |
| Net burn | | | |
## Cash and Runway
Cash balance: $[X] | Monthly net burn: $[Y] | Runway: [N] months
## CFO Commentary
[Commentary from Step 3]
## Variance Analysis
[Variance table from Step 4 — only for metrics >10% off plan]
## Risks and Flags
- [Risk 1: specific, honest, with mitigation]
- [Risk 2]
## Asks from the Board
- [Specific ask with context]
Produce the complete board financial package. Board packages must be honest — no spin, no burying problems. If there is a problem, name it and state what is being done. Save to finance/board-[month]-[year].md. Summarize top 3 metrics in CLI receipt.
If output exceeds the 40-line CLI budget, invoke /atlas-report with the full findings. The HTML report is the output. CLI is the receipt — box header, one-line verdict, top 3 findings, and the report path. Never dump analysis to CLI.
まだレビューはありません。使ってみた感想をお寄せください。
概要と使いどころ
Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.
日本語の概要は準備中です。原文の説明を表示しています。
Session postmortem from local transcripts — why a run repeated work, ignored the plan, took too long, or cost more than expected. Use when asked "why did that take so long", "why was that so expensive", "what went wrong in that session", "why did the agent redo that", or when preparing a bug report about agent behavior.
日本語の概要は準備中です。原文の説明を表示しています。
Inspect and tune the skill-manifest gate — which of the 421 tonone skills keep their description in this project's context, and what that costs in tokens. Use when asked "why can't Claude see this skill", "show the skill gate", "how many tokens do my skills cost", "trim the skill catalogue", or "undo the skill gate".
日本語の概要は準備中です。原文の説明を表示しています。
Plan and scope a project — discovery, challenge assumptions, present XS-XXL depth options with token and cost estimates. Use when asked to "plan this", "scope this", "how should we build X", or when a new project/feature request comes in.
日本語の概要は準備中です。原文の説明を表示しています。
Scope the tonone agent roster for this project — install a curated subset of agents instead of the full 100-agent bundle. Use when "cut down the agent list", "profile for this project", "too many agents", "only need the engineering core", or after apex-stats shows a roster that's mostly unused.
日本語の概要は準備中です。原文の説明を表示しています。
Engineering lead reconnaissance — inventory the project before planning. Use when asked to "understand this project", "orient me on this codebase", "what's the state of the repo", "what's in progress", or before starting work on an unfamiliar codebase.
日本語の概要は準備中です。原文の説明を表示しています。