本文へ移動
cccskills
無料GitHub で公開

gz-big-picture

Explain what the project is and does by design, what it is becoming, the value being built, its architectural trajectory, and where design intent and built reality diverge; publish a retained, ledger-recorded report when the operator requests a high-altitude perspective.

インストール方法を見る

含まれるファイル(1)

  • SKILL.md11.5 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

gz-big-picture

Purpose and initiation

Help the operator see the forest: what does this all mean, and what does the project look like from up high? Explain what the system is and does by design, its purpose, the value being built, its trajectory, and what the architecture reveals about its strengths and unresolved problems. Treat the reader as someone investing attention and resources who needs an honest account of both the thing being built and how that investment is progressing.

Only the operator initiates a run. An agent may suggest one and explain its value; a milestone or elapsed time is a reason to suggest, not permission to start. Narrative synthesis warrants the judgment tier declared above; use the hosting harness's corresponding strong model without assuming a particular provider.

Establish the perspective

Use the requested scope and time horizon. Otherwise assess the whole project today, using the previous report as a comparison point when available. State the evidence cutoff and comparison period; a first report establishes a baseline.

Read the project's purpose, user needs, architecture, delivered behavior, and operational evidence. Follow its configured paths and source-of-truth rules. Use its actual planning material: a campaign is useful when present, not required for an adopting project. Read consequential sources behind summaries and reconcile conflicting dates or claims before relying on them. Disclose unavailable evidence and how it limits the assessment; missing evidence is not proof of failure.

Form a current view from primary evidence, then compare with prior reports. Preserve continuity without inheriting an earlier report's interpretation as fact. Explain which expectations held, which were contradicted, and what remains untested.

Write the account

Every report covers purpose, design, capabilities, value, trajectory, alignment, and uncertainty. Choose the structure that best explains this project; these are coverage obligations, not mandatory headings. Start with a readable overall assessment. Connect major efforts to the capabilities and outcomes they enable, preserve, or impair. Explain how the pieces fit together and what recurring problems suggest about the design.

Describe the system, not only its condition

A reader who has not used the project should finish the report able to say what it is, what it does, and how its parts compose. Give that description standing room: name the major components and the job each one does, show how they fit together, and state the capability surface a user actually gets — the commands, interfaces or workflows they invoke, and what each produces. Where the designed shape and the shipped one differ, say so.

Design choices carry claims. Name the claim behind each significant mechanism — what it makes impossible, guarantees, or replaces — then read the built system against the designed one. What is the design trying to look like, and what does it look like? Where the two diverge, say where and in which direction: a mechanism reaching further than it was meant to, one not yet reaching as far, one the project has outgrown. A divergence is a finding about alignment. Report it as that, at the altitude of the design, and leave its repair to the surfaces that own repairs.

Condition assessment — throughput, defect counts, queue depth, velocity — explains how the project is faring, not what it is. Keep the two in proportion. When condition material crowds out the description of the system, the reader learns the project's mood and not its shape.

Stay at altitude

Deficiencies are a valid output and never the purpose. A big-picture report says what is, what is not, what could be, and what maybe should not be — strengths and gaps together with the design's intentions, its misalignments, and what it cannot currently see about itself. Name a deficiency when it explains the shape of the whole. Do not go looking for more.

Instance-level defect hunting belongs to the surfaces that own it — triage, chores, review, a scoped R&D run. A report that enumerates defects has changed altitude and stopped doing this job. One structural observation that reframes how the reader sees the project is worth more than a catalogue, and a catalogue is the signal that the altitude slipped.

Blind spots earn their own attention, because no other surface looks for them: what does the project not measure, not ask about itself, or have no instrument for? An absence is harder to see than a fault and usually matters more.

Support interpretation with inspectable evidence and give contrary evidence appropriate weight. Distinguish intended, implemented, released, and observed capabilities when those distinctions affect the conclusion. Explain the significance of activity counts; they do not establish value by themselves. Architectural hypotheses should name their basis and uncertainty. The story may be encouraging, mixed, or adverse.

Use prose, selective tables, or a diagram where they improve understanding. Add a compact evidence appendix with source locations, dates/revisions where available, and material limitations. Keep implementation detail in that appendix unless it helps explain the project. Adapt terminology to the reader and adopting project.

The examples below teach perspective, not a fixed thesis. Instruction calibration follows the project's model-tuning guidance where available; in gzkit, see docs/governance/opus-tuning.md and docs/governance/gpt-tuning.md.

Publish and present

Write the completed Markdown report to a working file. Publish it through uv run gz report publish; consult uv run gz report publish --help for the supported arguments and configured destination. Use the big-picture series. Publication retains the report and records its identity in the ledger; use the returned artifact path when presenting the report to the operator.

Save and log when presented, without another approval round. Present the overall assessment with a link to the complete report. If publication fails, preserve the working file and report the actual failure and recovery; do not claim ledger logging succeeded. Retry using the command's documented identity and recovery semantics.

Retain every published report. Rotation advances the current view and history index; it does not delete older reports. Preserve the exact published assessment. Subsequent corrections or operator disagreements belong in a linked follow-up report, identifying what changed, rather than silently rewriting the earlier assessment.

Terminal state and boundary

The run ends with the report presented, retained, and ledger-recorded, or an explicit publication failure with its recoverable working file. Publication witnesses the assessment received; it is not operator endorsement of its conclusions.

The report supplies perspective. It does not change campaign priorities, initiate implementation, activate scheduled reporting, or attest completion. Route any subsequent work through the project's existing operator-controlled workflows.

Examples and quality

These fictional examples demonstrate altitude and evidence-aware interpretation. Their facts are illustrative, not claims about an actual repository. The evidence appendix of a real report links the sources supporting its own claims.

An engineering governance project

The project is building a way for people to retain authority and continuity while delegating engineering work to agents. Recent delivery has strengthened instruction preservation and verification. This investment makes earlier decisions more durable and deviations more visible, although much of the benefit appears as fewer failures rather than new features.

The working experience remains uneven. Repair history and observed operator interventions suggest reliable components have not yet combined into reliable coordination. That is an interpretation of those observations, not something a passing test suite can establish or refute alone. The central architectural question is how well the mechanisms cooperate at their boundaries.

InvestmentValue enabledEvidence still needed
Durable decisionsLess reconstruction between sessionsObserved continuity across real handoffs
VerificationEarlier detection of deviationsWhether consequential failures are detected
Shared workflowMore dependable delegationSuccessful use in another project

This pattern suggests looking at coordination as a whole. A different distribution of failures could change that assessment; the report should make that evidence visible.

A scientific data project

The project is becoming a reusable route from raw measurements to reproducible analyses. Its recent investment in provenance matters because researchers can now trace a result to the transformation and input version that produced it. That capability is valuable even before it produces a new scientific finding.

The strongest remaining uncertainty is applicability. Successful replay on one dataset demonstrates repeatability within that setting; it does not yet establish that laboratories with different instruments can use the system. The architecture's separation of acquisition from analysis creates room for that expansion, but observed adapter behavior would be stronger evidence than the intended interface alone.

Compared with the previous report, reproducibility may have moved from an aspiration to a demonstrated capability, while portability remains a hypothesis. That distinction explains both the value delivered and the limits of the current claim.

Assessing instructions and reports

Judge factual support separately from explanatory usefulness. Useful evaluation cases include high delivery volume with poor user outcomes, sparse adopter evidence, stale planning claims, and a prior forecast contradicted by later results. Ask whether the reader can explain what the system is and does, what the project is becoming, why the work matters, and which architectural uncertainties remain. Prescribed headings or a model's self-awarded score do not demonstrate this.

Research informing this approach:

These sources inform the writing approach; this skill does not adopt corporate reporting obligations or claim compliance with those frameworks.

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Use to mine ../airlineops for governance habits gzkit lacks; produces a parity scan report (gzkit leads, AirlineOps adopts).

日本語の概要は準備中です。原文の説明を表示しています。

tvproductions/gzkit92026年10月18日 更新

Use to file a GitHub issue when a finding needs its own work order or the operator asks; OBPI corrections stay in its change log.

日本語の概要は準備中です。原文の説明を表示しています。

tvproductions/gzkit92026年10月18日 更新

ghi-close

無料

Use to do the work a GHI describes, verify it and close the issue with evidence in one sweep.

日本語の概要は準備中です。原文の説明を表示しています。

tvproductions/gzkit92026年10月18日 更新

Use to triage the open GHI queue before planning or choosing what to pull; produces a ranked deliverable.

日本語の概要は準備中です。原文の説明を表示しています。

tvproductions/gzkit92026年10月18日 更新

git-sync

無料

Run the guarded repository sync ritual; commit-time hooks enforce the cheap gates and the pre-push hook runs gz check.

日本語の概要は準備中です。原文の説明を表示しています。

tvproductions/gzkit92026年10月18日 更新

git-sync

無料

Run the guarded repository sync ritual; the hooks your pre-commit config declares enforce the quality gates.

日本語の概要は準備中です。原文の説明を表示しています。

tvproductions/gzkit92026年10月18日 更新

tvproductions のスキルをすべて見る

このスキルの問題を報告する