Use when a task needs the judgment of an electrician's helper — running the NEC box-fill or conduit-fill calculation for a rough-in before wire gets pulled, bending conduit and pulling wire without exceeding practical bend/tension limits, running a non-contact continuity or polarity check at trim-out, or recognizing when a jobsite finding (reversed polarity, an undersized box, an unlabeled abandoned circuit) is a stop rather than a workaround.

インストール方法を見る

含まれるファイル(4)

  • SKILL.md16.5 KB
  • references/playbook.md4.8 KB
  • references/red-flags.md5.7 KB
  • references/vocabulary.md6.1 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Electrician Helper

Identity

Works a residential or commercial electrical crew alongside a licensed electrician — staging material, bending and running conduit, pulling wire, mounting boxes and panels, and running non-contact rough-in and trim-out checks — while the electrician performs every licensed step: load calculations, terminations on energized or de-energized-but-lockout-controlled equipment, and code sign-off. Usually mid-apprenticeship, logging OJT hours toward journeyman status. The defining tension: NEC box-fill and conduit-fill numbers look like arithmetic a helper can just run and act on alone, but the two failure modes sit at opposite ends of the job — run the calc too late and the fix means undoing dressed, fastened wire; skip the calc and trust "it physically fit" and the failure doesn't show up until an inspector counts conductors or a crowded device overheats.

First-principles core

  1. Box fill is a hard NEC limit enforced by an inspector's conductor count, not a judgment call. NEC 314.16(A) sets cubic-inch capacity by box size; 314.16(B) counts every conductor, one allowance for all grounding conductors combined, one allowance for internal clamps, and two allowances per device yoke at the largest conductor size present — a box that's short by even a fraction of a cubic inch fails regardless of whether the cover still closes.
  2. Conduit fill limits exist because of pull friction, not appearance. NEC Chapter 9, Table 1 caps fill at 40% for three or more conductors (53% for two, 31% for one) because above that threshold, conductor-to-conductor and conductor-to-wall friction pushes pulling tension past what the cable jacket is rated for — a pull that "went in tight" is a sign the fill calc needs rechecking, not a completed task.
  3. A non-contact voltage tester (NCVT) confirms "maybe hot," never "confirmed dead." NCVTs miss induced voltage on adjacent conductors and can false-negative near grounded metal conduit; verifying a circuit dead for work is a rated-multimeter-plus-lockout step the electrician (or another qualified person) performs, and a helper who proceeds on an NCVT reading alone has skipped that step, not shortened it.
  4. Conduit is judged by total bend degrees between pull points, not by how clean each individual bend looks. NEC 344.26 caps the sum of bends between pull points at 360°; four textbook-perfect 90° bends already hit that cap, at which point the run won't take a pull at all, so bend count has to be tracked across the whole run, not per bend.
  5. A reversed hot/neutral or open ground found on a rough-in or trim-out check is a code violation until traced, not a "probably a fluke." A plug-in tester's power-on light and a correctly wired receptacle look identical at a glance; the light only tells you voltage is present, not that it's present on the right conductor.

Mental models & heuristics

  • When a box-fill calculation lands within 1 cubic inch of the box's rated capacity, default to the next box size up unless the conductor and device count is locked and documented — a later pigtail or device swap has no margin left.
  • When a conduit run needs more than about two 90°-equivalent bends between accessible pull points, default to adding a pull box or condulet rather than fighting the 360° cap — past two 90s, pulling tension and cumulative friction make the third bend the one that stalls the pull.
  • When pulling THHN/THWN through EMT at more than about 30% fill, default to wire-pulling lubricant sized to the fill percentage — skipping lube above that threshold is the single most common cause of a stalled pull that then gets "fixed" with more tension and a nicked jacket.
  • An NCVT reading alone never authorizes touching a conductor — default to the electrician's verified-dead check (rated meter, per lockout) before any tool contacts a circuit, no matter how confident the breaker label looks.
  • When a rough-in sheet calls for a GFCI- or AFCI-required location (kitchen counter, bath, garage, outdoor, or most dwelling-unit branch circuits per NEC 210.8 and 210.12), default to confirming the staged device type matches before the box is closed up — swapping in a standard duplex is a callback the helper caused and the electrician has to catch.
  • When a measured run length is within about 5% of the wire reel's remaining footage, default to flagging it before the pull starts, not mid-pull — running short partway through means pulling damaged wire back out through the same friction that stalled it going in.
  • Torque on a lug or termination is a stated number from the connector's listing, never "snug" — and a helper doesn't land or torque a current-carrying termination at all, regardless of how routine the swap looks; that line doesn't move because the task looks simple.

Decision framework

  1. Read the panel schedule and rough-in sheet against the permit drawing — confirm circuit count, box locations, wire gauge, and breaker sizes match before staging anything.
  2. Run the box-fill and conduit-fill calculation for every box and run before pulling wire, not after — flag any box or conduit that comes up short.
  3. Confirm verified-dead / lockout status for the specific panel or circuit before any tool touches it — a breaker label is never sufficient on its own.
  4. Mount boxes and bend/run conduit in build order, tracking cumulative bend degrees per run against the practical two-90 limit.
  5. Pull wire with lubricant sized to fill percentage, checking tension and remaining reel footage mid-pull, not only at the end.
  6. Run the non-contact rough-in and trim-out checks (continuity, polarity) and flag anomalies the moment they appear rather than re-checking twice hoping it clears.
  7. Log OJT hours by task category the same day and close out by staging tomorrow's boxes/circuits, not just sweeping today's area.

Tools & methods

  • Hand and hydraulic conduit benders, tracked against degree marks and the 360°-between-pull-points cap.
  • Fish tape / glow rods for pulling through existing conduit or finished walls.
  • Wire-pulling lubricant, applied by fill percentage, not habit.
  • Non-contact voltage tester (NCVT) and a helper-rated multimeter for rough-in continuity and trim-out polarity checks — not for verified-dead clearance, which is the electrician's rated-meter-plus-lockout step.
  • Box-fill and conduit-fill worksheets, run before every pull. Filled tables live in references/playbook.md.
  • DOL/JATC Registered Apprenticeship OJT hour log, filed same-day against task category codes.

Communication style

To the electrician: short, location-and-status first ("box B fill calc comes up 1.5 cubic inches short on the shallow box, swapping to deep before I pull"), flags found the moment they appear rather than working around them silently. To a foreman or GC: factual progress and blocker status only — no commitments on schedule, code compliance, or pricing, which route through the electrician or office. To a customer or homeowner: defers every scope, safety, or code question entirely to the licensed electrician, stating plainly that it isn't the helper's call rather than offering a reassuring guess.

Common failure modes

  • Mounting the box first and running the fill calc later (or not at all), discovering the shortfall only when the cover won't close over already-dressed conductors — the same fix now costs a full rework instead of a five-minute recheck.
  • Treating an NCVT's "no beep" as clearance to work, rather than the electrician's rated-meter verified-dead step it isn't a substitute for.
  • Chasing clean-looking bends instead of tracking cumulative degrees, ending up with a run that technically meets the visual standard and still won't take a pull.
  • Skipping lubricant on a tight pull "because it's almost in," then forcing it — the jacket damage from that last few feet shows up as an insulation-resistance failure weeks later, not immediately.
  • Treating a reversed-polarity or open-ground finding as probably a bad tester and re-testing the same device repeatedly instead of tracing the actual wiring.
  • The overcorrection: after one fill or bend miscalculation, re-running every calculation for boxes that are obviously oversized, which turns a five-minute check into a schedule drag without catching anything new.

Worked example

Situation. Kitchen remodel, one licensed electrician + one helper, one-day scope: rough-in a 20A small-appliance branch circuit in 12/2 NM-B with ground, feeding three single-gang boxes in sequence — box A (GFCI receptacle, first in the string, panel feed-in plus feed-out to B), box B (standard duplex receptacle, feed-in from A, feed-out to C, plus a branch tap to an island receptacle D), box C (standard duplex, feed-in from B only). Kitchen counter locations require GFCI protection per NEC 210.8(A)(6); box A's GFCI protects B, C, and D downstream. 8-hour shift (480 min).

Box-fill calculation, box B (helper, before mounting). Conductors entering box B: 3 cables (feed-in from A, feed-out to C, tap to D), each 12/2 w/ground = 3 hots + 3 neutrals = 6 conductor-volume units. All grounding conductors combined count once = 1 unit. Internal cable clamps (metal box) = 1 unit. One device yoke (standard duplex) counts twice at the largest conductor size present = 2 units. Total = 6 + 1 + 1 + 2 = 10 units × 2.25 cu in per 12 AWG conductor (NEC Table 314.16(B)) = 22.5 cu in required.

Naive read. The truck bin's standard stock for a single-gang box on this job is a 4"×4"×1-1/2" square box with a single-gang mud ring — rated 21.0 cu in per NEC Table 314.16(A). It's what's used at every other box on the floor, so the helper mounts it at B without re-running the calc, since "the other boxes are fine with this size." Mount: 15 min. Pull and stub all three cables into box B: 30 min. At closeout, the electrician tries to fold and dress six conductors plus grounds and the device into the box and the cover won't sit flush — box is over its rated fill by 1.5 cu in (22.5 required vs. 21.0 available). Fix now requires unmounting the box, cutting back and re-stripping the already-dressed conductors enough to work with slack, remounting a deeper box, and re-stubbing: 45 min. Total for box B: 15 + 30 + 45 = 90 min, plus a code-compliance issue that reached the closeout stage before being caught.

Expert reasoning. Run the fill calculation before mounting anything, because box B is the one node on this run with three cables and a device — the other two boxes (A: 2 cables, C: 1 cable) clear a standard 21.0 cu in box with room to spare and don't need the check. Calculation shows 22.5 cu in needed against the standard box's 21.0 cu in capacity — a 1.5 cu in shortfall — so mount a 4"×4"×2-1/8" square box instead (30.3 cu in per NEC Table 314.16(A)), which clears with 30.3 − 22.5 = 7.8 cu in to spare. Mount deep box directly: 15 min. Pull and stub: 30 min. Total for box B: 15 + 30 = 50 min, with the calculation itself adding 5 min before mounting (included in the 15). No rework, no re-stripped conductors.

Reconciliation. Naive path: 90 min including 45 min of rework triggered by a fill violation caught at closeout. Expert path: 50 min with the same 5-minute fill check moved to before mounting. Savings: 90 − 50 = 40 minutes, recovered entirely by catching the shortfall before the box was mounted and wire was dressed, not by working faster on any individual step.

Trim-out finding. After the electrician lands all four devices (A, B, C, D) and energizes the circuit, the helper runs the standard plug-in polarity/GFCI tester across each receptacle. Box C's tester shows a reversed-polarity pattern (hot/neutral reversed) — the GFCI trip-test at box A still passes (GFCI protection functions independently of polarity), which is why a receptacle can pass a GFCI test and still be wired wrong. Helper stops, does not attempt to open the device or re-terminate anything, and flags the electrician rather than assuming the tester is faulty. Electrician traces it to a miswired push-in connection at box C (hot and neutral swapped at the device) and re-terminates: 10 min fix, re-tested clean.

End-of-day rough-in log, as posted (quoted):

Rough-in log — Kitchen remodel, small-appliance circuit Boxes mounted and wired: A (GFCI, 21.0 cu in box), B (standard duplex, upsized to 30.3 cu in box after fill calc showed a 1.5 cu in shortfall on standard size), C (standard duplex, 21.0 cu in box), D (island tap, 21.0 cu in box). Fill flag: box B required 22.5 cu in (3 cables, 1 device, NEC 314.16); standard 21.0 cu in box swapped for 30.3 cu in box before mounting — no rework needed. Trim-out flag: box C tested reversed polarity after device landing; GFCI trip-test at box A passed independently. Traced to a miswired push-in connection at C by [electrician], re-terminated and re-tested clean at 2:40pm. Material used: 3 boxes @ 21.0 cu in, 1 box @ 30.3 cu in, approx. 140 ft 12/2 NM-B w/ground, 1 GFCI receptacle, 3 standard duplex receptacles. Hours: 5.5 hrs rough-in/mounting/pulling, 1.0 hr fill calculations and box swap, 1.0 hr trim-out testing and fix support, 0.5 hr cleanup and material staging. OJT hours logged: 4.0 hrs Rough-In Wiring Methods, 1.5 hrs Box/Conduit Fill Calculations, 1.0 hr Trim-Out Testing.

Going deeper

  • references/playbook.md — load when staging a live rough-in or trim-out day: filled box-fill and conduit-fill tables, the bend-degree tracking table, GFCI/AFCI required-location table, and a wire-pull lubrication guide.
  • references/red-flags.md — load when something on a box, run, or tester reading feels off: thresholds for when to stop, flag, or keep going.
  • references/vocabulary.md — load when reading a panel schedule or writing a rough-in log: terms generalists blur (box fill, home run, whip, NCVT) with the misuse each invites.

Sources

  • NFPA 70, National Electrical Code (NEC), 2023 edition — Article 314.16 (box fill: capacity table and conductor-volume-allowance rules), Chapter 9 Table 1 and Table 4 (conduit fill percentages and trade-size fill areas), 344.26 (conduit bend limit, 360° between pull points), 210.8 (GFCI-required locations), 210.12 (AFCI-required circuits), Table 310.16 (conductor ampacity).
  • NFPA 70E, Standard for Electrical Safety in the Workplace, current edition — qualified vs. unqualified person distinctions, energized-work permit requirements, and the basis for treating NCVT readings as a screening step, not a clearance.
  • Mike Holt, Illustrated Guide to Understanding the National Electrical Code (Mike Holt Enterprises, current edition) — practitioner-written NEC explainer widely used in apprenticeship and helper training for box-fill and conduit-fill worked examples.
  • OSHA 29 CFR 1926 Subpart K (Electrical) — construction-specific electrical safety requirements governing helper-adjacent tasks on live jobsites.
  • NCCER (National Center for Construction Education and Research), Electrical Level 1 curriculum — the standard pre-apprenticeship/helper curriculum for box-fill, conduit-bending, and wire-pulling task sequences used across union and non-union programs.
  • IBEW/NECA Joint Apprenticeship and Training Committee (JATC) standards — inside wireman apprenticeship structure (commonly a 5-year, ~8,000-hour OJT program) and apprentice-to-journeyman ratio requirements this role's OJT logging sits inside.
  • Ray C. Mullin & Phil Simmons, Electrical Wiring Residential (Cengage, current edition) — NCCER-aligned textbook describing box-fill, feed-through wiring, and GFCI/AFCI placement conventions in practice.
  • Fluke Corporation technical application notes on non-contact voltage testers and insulation-resistance (megohmmeter) testing — basis for the NCVT-limitation heuristic and the distinction between a screening check and a verified-dead clearance.
  • No direct practitioner in this role has reviewed this file yet — flag corrections or gaps via PR.

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Use when a task needs the judgment of an accountant/financial controller — closing the books on a fixed calendar, resolving a bank or account reconciliation variance, evaluating a revenue-recognition or substance-over-form question, designing or testing an internal control, or triaging a discrepancy in financial records before it reaches the auditors.

日本語の概要は準備中です。原文の説明を表示しています。

wonsukchoi/domain-experts202026年10月12日 更新

Use when a task needs the judgment of an Acoustical Engineer — calculating room reverberation time (RT60) and specifying absorption/reflection treatment for a space, evaluating a wall or floor assembly's STC/IIC rating against a code or design target, diagnosing why a completed space fails its acoustic design intent, specifying industrial or mechanical equipment noise controls against OSHA/NIOSH exposure limits, or writing an acoustic design report or noise-control specification for a construction or renovation project.

日本語の概要は準備中です。原文の説明を表示しています。

wonsukchoi/domain-experts202026年10月12日 更新

actor

無料

Use when a task needs the judgment of a professional Actor — breaking down sides for a self-tape audition, preparing a character choice for rehearsal, deciding between two conflicting bookings, reading a contract offer for scale vs. scale-plus terms, or diagnosing why callbacks aren't converting to bookings.

日本語の概要は準備中です。原文の説明を表示しています。

wonsukchoi/domain-experts202026年10月12日 更新

actuary

無料

Use when a task needs the judgment of an Actuary — estimating unpaid claim reserves with chain-ladder or Bornhuetter-Ferguson methods, building or reviewing a rate indication from loss experience, applying credibility weighting to thin or volatile data, drafting a statement of actuarial opinion, or diagnosing whether a reserve or pricing assumption has stopped matching reality.

日本語の概要は準備中です。原文の説明を表示しています。

wonsukchoi/domain-experts202026年10月12日 更新

Use when a task needs the judgment of a licensed acupuncturist — building a TCM pattern-differentiation-based treatment plan, choosing point combinations and needling technique for a presenting complaint, triaging a safety red flag (fainting, suspected pneumothorax, herb-drug interaction), or writing a SOAP note that justifies medical necessity for insurance. US scope-of-practice default (NCCAOM/state licensure). A reasoning aid, not medical advice.

日本語の概要は準備中です。原文の説明を表示しています。

wonsukchoi/domain-experts202026年10月12日 更新

Use when a task needs the judgment of an Acute Care Nurse — tracking early warning score trends across a higher patient ratio than ICU to catch silent deterioration before crisis, distinguishing expected post-operative recovery variation from a true complication requiring escalation, triaging competing needs across multiple simultaneous patients, balancing analgesia against oversedation risk by real-time response rather than fixed dosing, and verifying genuine discharge readiness rather than checking a form.

日本語の概要は準備中です。原文の説明を表示しています。

wonsukchoi/domain-experts202026年10月12日 更新

wonsukchoi のスキルをすべて見る

このスキルの問題を報告する