Maintain sourced agreement context and scope in PROJECT.md, cite registered contracts/proposals, and record amendments without imposing a commercial workflow.
中文简介正在准备中。当前显示原文说明。
Prepare a sourced site-visit record separating direct observations, participant reports, interpretations, limitations and proposed follow-ups.
中文简介正在准备中。当前显示原文说明。
实测评分 未实测
查看安装方法安装前可以查看交给 AI 代理的指令内容。
Before acting, read the host contract, this component's declaration (skill:site-visit-report), and applicable workspace semantics. Load only the required modes from the shared catalog.
Use the host adapter and available native tools or ordinary task-specific code. Apply the receive-owned semantic document rules directly; no installed library, nested skill invocation, runner or executable reconstruction is required. Resolve context before durable work. Existing exact authorization persists; ask only for material missing information or missing permission.
Own authored event documents of kind site-visit. Use the site template. Keep direct observations, participant-reported information, interpretations, issues and proposed actions separate; give stable item labels. Record participants, date, visit scope and access/visibility/weather/testing/equipment/document limits. Inaccessible or concealed work is Not observed, never no issue observed. Do not fabricate photo identity, location, dates or certainty about concealed conditions.
Resolve the project and authorized notes/photos. Distinguish visit, source and created dates. Inspect available photos before describing their content; a filename or caption alone is not visual evidence. Link registered attachments by ID and actual resolved path. This record does not certify code, life-safety, structural, MEP, accessibility, environmental or contractual compliance; route substantive conclusions to the relevant specialist/professional workflow.
Before persistent changes, follow the native mutation sequence: Inspect → Prepare → Verify preparation → Apply → Verify result → Complete. Inspect pending work first. Finish and verify preparation before the first canonical write: separately reread every saved original and prepared file, check its complete actual bytes, establish durable saving, and inspect actual permissions, ownership and ACLs. Merely writing recovery files does not finish verification. Apply only that verified set. Mark complete only after fresh readback validates the entire affected result and its relationships. Read-only requests and inline drafts need no publication sequence.
Saving a report affects the complete site-visit document plus DOCUMENTS.csv and any explicitly authorized attachment registrations. Prepare and verify that full set before writing the first member. Notes/photos remain source read guards; no project-fact, task or decision promotion belongs to this publication set.
Prepare the report, then resolve confirmed coordinates and register through documents.register, kind site-visit. An explicit revision is a new document with supersedes; preserve old bytes. For client/authority-facing or regulated-conclusion reports, apply the existing disclaimer procedure when applicable, including the required terminal <!-- architecture-studio:requires-disclaimer --> marker; do not invent a universal disclaimer for an internal administrative draft.
Reopen the actual report and inspect requested presentation. Only after saving, offer selected project-fact/decision/task promotions with exact item IDs. Report approval alone is not promotion approval. Keep observations, reports and interpretations in their original epistemic category. No silent mutation of PROJECT.md, TASKS.csv or decision records.
site_visit.prepare means the authored preparation procedure above; it may produce an inline draft without a workspace write. Persistence uses the shared native document contract, restricted here to kind site-visit and authorized attachments. A saved record does not authorize its proposed actions or promote facts/decisions automatically.
还没有评价。欢迎分享你的使用感受。
无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。
还没有评论。来写第一条吧。
Maintain sourced agreement context and scope in PROJECT.md, cite registered contracts/proposals, and record amendments without imposing a commercial workflow.
中文简介正在准备中。当前显示原文说明。
Explain US architecture professional-practice terms, phases, deliverables, roles, delivery methods, AIA contract families, CSI documentation systems, or NCS at a high level. Use for questions such as “what is a CD set?” or “what does 50% CDs mean?”; do not use for code/jurisdiction, outline-spec, agreement-scope, or work-plan work.
中文简介正在准备中。当前显示原文说明。
Create an HTML color palette from a mood, description, or image, with swatches, color codes, pairings, and contrast checks. Use for color schemes or brand colors.
中文简介正在准备中。当前显示原文说明。
Export a project's FF&E product-library CSV as dealer-system SIF. Use to produce a .sif schedule; use sif-to-csv for the reverse direction.
中文简介正在准备中。当前显示原文说明。
Research population, income, age, housing, and employment around a site. Use for census, demographic, or local-market questions tied to a location.
中文简介正在准备中。当前显示原文说明。
Extract countable FF&E or luminaire instances from supplied drawings with position-level evidence. Use for plan quantities or symbol counts; not area takeoffs, product specs or cross-source reconciliation.
中文简介正在准备中。当前显示原文说明。