跳到正文
cccskills
免费在 GitHub 公开

"biz-lean-six-sigma"

"Apply Lean and Six Sigma principles to eliminate waste and reduce process variation. Use this skill when the user needs to improve operational efficiency, identify the seven wastes (TIMWOOD), run DMAIC improvement projects, or streamline workflows — even if they say 'our process is too slow', 'where are we wasting resources', or 'how do we reduce defects'.".

中文简介正在准备中。当前显示原文说明。

实测评分 未实测

查看安装方法

包含的文件(4)

  • SKILL.md5.0 KB
  • examples/sample_scenario.md5.9 KB
  • references/spc-basics.md9.9 KB
  • references/value-stream-mapping.md12.3 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Lean Six Sigma

Overview

Lean eliminates waste (non-value-adding activities). Six Sigma reduces variation (defects and inconsistency). Combined, they improve speed AND quality. Lean answers "are we doing unnecessary things?" Six Sigma answers "are we doing necessary things consistently?"

Framework

IRON LAW: Value Is Defined by the CUSTOMER, Not the Producer

An activity adds value ONLY if: (1) the customer is willing to pay for it,
(2) it transforms the product/service, AND (3) it's done right the first time.
If any condition fails, the activity is waste — eliminate or minimize it.

The Seven Wastes (TIMWOOD)

WasteDefinitionExample
TransportationUnnecessary movement of materialsMoving inventory between warehouses
InventoryExcess stock beyond immediate need6 months of raw materials sitting idle
MotionUnnecessary movement of peopleWalking across factory floor to get tools
WaitingIdle time between process stepsOrders waiting for approval
Over-productionMaking more than neededPrinting 1000 reports when 100 are read
Over-processingMore work than the customer requiresTriple-checking a non-critical form
DefectsOutput that requires rework or disposalSoftware bugs, manufacturing rejects

DMAIC Improvement Cycle (Six Sigma)

  1. Define: What is the problem? Who is the customer? What is the target metric?
  2. Measure: What is the current performance? Collect data on defect rate, cycle time, variation.
  3. Analyze: What causes the problem? Use root cause analysis (5 Whys, fishbone diagram, Pareto chart).
  4. Improve: What changes will fix it? Design and test solutions.
  5. Control: How to sustain the improvement? Implement monitoring, SOPs, control charts.

Kaizen (Continuous Improvement)

Small, incremental improvements made continuously by frontline workers:

  • Daily standup to identify one improvement
  • Implement immediately if possible
  • Document and share across teams

Output Format

# Lean Six Sigma Analysis: {Process}

## Current State
- Process: {description}
- Key metric: {defect rate / cycle time / cost}
- Current performance: {baseline data}

## Waste Identification (TIMWOOD)
| Waste Type | Found? | Description | Impact |
|-----------|--------|-------------|--------|
| Transportation | Y/N | {detail} | H/M/L |
| Inventory | Y/N | ... | ... |
| Motion | Y/N | ... | ... |
| Waiting | Y/N | ... | ... |
| Over-production | Y/N | ... | ... |
| Over-processing | Y/N | ... | ... |
| Defects | Y/N | ... | ... |

## Root Cause Analysis
{5 Whys or fishbone diagram for top waste}

## Improvement Plan (DMAIC)
| Phase | Action | Owner | Timeline |
|-------|--------|-------|----------|
| Define | {problem statement} | ... | ... |
| Measure | {data collection plan} | ... | ... |
| Analyze | {root cause method} | ... | ... |
| Improve | {solution} | ... | ... |
| Control | {monitoring plan} | ... | ... |

## Expected Impact
- {metric}: {current} → {target} ({X% improvement})

Examples

Correct Application

Scenario: Lean analysis of a restaurant kitchen order process

  • Waiting waste: Orders wait 8 min for expeditor to batch them → Change to real-time ticket system (saves 6 min/order)
  • Motion waste: Chef walks 15m to reach cold storage per order → Relocate prep station fridge (saves 2 min)
  • Defect waste: 12% order error rate → Implement kitchen display system with visual confirmation (target 3%)
  • Root cause (5 Whys): Errors → handwritten tickets �� poor handwriting → no standardized format �� no digital order system

Incorrect Application

  • Identified "the market is declining" as a waste → Market conditions are external, not process waste. TIMWOOD applies to internal processes only.

Gotchas

  • 8th waste — unused talent: Often added to TIMWOOD. Employees with ideas that aren't heard or skills that aren't utilized.
  • Lean can go too far: Eliminating ALL inventory (zero buffer) creates fragility. Some "waste" is strategic buffer. Balance efficiency with resilience.
  • Six Sigma requires data: Without baseline measurements, you can't calculate improvement. Invest in measurement before jumping to solutions.
  • Cultural resistance: Lean/Six Sigma requires frontline buy-in. Top-down mandates without worker involvement fail.

References

  • For value stream mapping methodology, see references/value-stream-mapping.md
  • For statistical process control (SPC), see references/spc-basics.md

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

"Implement and select ad bidding strategies from manual CPC to automated target-CPA and target-ROAS. Use this skill when the user needs to choose a bidding strategy, set up automated bidding, or optimize bid parameters — even if they say 'what bidding strategy should I use', 'target CPA setup', or 'smart bidding configuration'.".

中文简介正在准备中。当前显示原文说明。

charlieviettq/awesome-agent-skill262026年7月20日 更新

"Optimize advertising budget allocation across campaigns using marginal returns analysis. Use this skill when the user needs to distribute budget across multiple campaigns, optimize spend pacing, or maximize overall ROAS under budget constraints — even if they say 'how to split my ad budget', 'campaign budget optimization', or 'diminishing returns on ad spend'.".

中文简介正在准备中。当前显示原文说明。

charlieviettq/awesome-agent-skill262026年7月20日 更新

"Build CTR prediction models for estimating ad click-through rates from features. Use this skill when the user needs to predict click probability, build an ad ranking model, or evaluate ad creative performance — even if they say 'predict click rate', 'ad relevance scoring', or 'which ad will get more clicks'.".

中文简介正在准备中。当前显示原文说明。

charlieviettq/awesome-agent-skill262026年7月20日 更新

"Implement Generalized Second Price auction for ad slot allocation and pricing. Use this skill when the user needs to understand search ad auctions, compute ad positions and costs-per-click, or analyze bidding dynamics — even if they say 'how does Google Ads auction work', 'ad rank calculation', or 'second price auction for ads'.".

中文简介正在准备中。当前显示原文说明。

charlieviettq/awesome-agent-skill262026年7月20日 更新

"Implement VCG mechanism for incentive-compatible ad slot allocation with truthful bidding. Use this skill when the user needs to design a truthful auction mechanism, compute externality-based payments, or understand why platforms may prefer GSP over VCG — even if they say 'truthful auction design', 'VCG payments', or 'incentive-compatible mechanism'.".

中文简介正在准备中。当前显示原文说明。

charlieviettq/awesome-agent-skill262026年7月20日 更新

"Explain blockchain fundamentals including distributed ledger architecture, consensus mechanisms, and block structure. Use this skill when the user needs to understand blockchain concepts, evaluate whether blockchain fits a use case, or design a blockchain-based solution — even if they say 'how does blockchain work', 'do I need blockchain', or 'distributed ledger'.".

中文简介正在准备中。当前显示原文说明。

charlieviettq/awesome-agent-skill262026年7月20日 更新

查看 charlieviettq 的全部技能

报告此技能的问题