跳到正文
cccskills
免费在 GitHub 公开

ai-agent-orchestration

Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.

中文简介正在准备中。当前显示原文说明。

查看安装方法

包含的文件(1)

  • SKILL.md2.7 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

AI Agent Orchestration for Construction (2026)

Why agents now

2026 construction automation is agentic: not single prompts, but specialized agents that own a domain (estimating, scheduling, documents, QA, safety), share a common data spine (the ERP + CWICR cost bases), and are coordinated by a supervisor with human checkpoints.

Agent roles

AgentOwnsTools it calls
Estimator agentBOQ + costCWICR search, QTO, market catalogs, costs API
Scheduler agentTime (4D)task graph, dependencies, critical path, resource leveling
Document agentSpecs & contractsPDF/OCR extraction, clause NER, submittal/RFI routing
QA agentQualityvalidation rule packs (DIN276/NRM/GAEB), reconciliation checks
Safety agentHSEchecklist generation, incident classification, regulations lookup
Supervisor agentOrchestrationroutes tasks, resolves conflicts, escalates to humans

Coordination patterns

Supervisor ──► Estimator ──► BOQ draft ──► human approves
    │              ▲
    ├──► Document ──► scope extracted (specs) ─┘
    ├──► Scheduler ──► draft schedule from BOQ quantities
    └──► QA ──► validate BOQ + schedule, report violations
  1. Data spine first — all agents read/write the same ERP data (BOQ, tasks, cost items); no agent keeps private state.
  2. Human checkpoints — binding numbers (prices, contracts) always pass a human gate.
  3. Deterministic validation — QA uses arithmetic and rules, not LLM judgement, for reconciliation (e.g. qty × price = cost, markup conventions).
  4. Idempotent actions — every agent action is re-runnable (the ERP import is idempotent on (code, region); use it as the model).

Guardrails

  • Never let an agent invent a price: unpriced bases stay rate 0 until a market sheet exists.
  • Confidence-scored matches below threshold go to a human.
  • Log every agent decision with its inputs (the ERP's usage ledger pattern).
  • EU AI Act (2024/1689): construction estimation assistance is low/limited risk, but keep human oversight for safety-critical decisions.

Resources

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Manage as-built documentation for project closeout. Track drawing markups, coordinate updates, and verify completeness.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

查看 datadrivenconstruction 的全部技能

报告此技能的问题