analyze
免费Risk analysis and approach selection before planning. Use when requirements are ambiguous, approaches vary, or work touches hub/bridge nodes. Skip for typo fixes.
中文简介正在准备中。当前显示原文说明。
Run integration and e2e tests after unit tests pass. Use after /supergraph:fix when unit tests are green.
中文简介正在准备中。当前显示原文说明。
查看安装方法安装前可以查看交给 AI 代理的指令内容。
Integration + e2e tests. Validates modules work together. Run AFTER unit tests pass.
/supergraph:integration | plan auth-login | plan auth-login task 3
$TEST_CMD green)/supergraph:fix completed"🔗 /supergraph:integration — running integration and e2e tests..."
Read from plan ## Environment Context or .supergraph-env. Missing → STOP, run /supergraph:scan first.
$TEST_CMD
If unit tests FAIL → STOP: "Unit tests must pass before integration. Run /supergraph:fix first."
Check for integration configuration:
| Config | Command |
|---|---|
jest.integration.config.js | npx jest --config jest.integration.config.js |
vitest.integration.config.ts | npx vitest --config vitest.integration.config.ts |
pytest.ini with [integration] or -m integration | pytest -m integration |
cypress.config.js / cypress.config.ts | npx cypress run |
docker-compose.test.yml | docker compose -f docker-compose.test.yml up --abort-on-container-exit |
*.integration.test.ts / *.integration.spec.ts pattern | npx jest --testPathPattern="integration" |
If none found → skip: "No integration/e2e config found — skipping."
Max 3 retries. On failure:
4b. Serena (optional): See serena/SKILL.md:Setup — find_referencing_symbols/get_diagnostics_for_file per failing module to surface mismatches. Skip if unavailable.
Trace failure to source module, fix, re-run.
docs/qa/test-matrix-<feature>.md) covering Happy path, Sad path, Boundary, Network 500 error injection, Auth/RBAC, and IDOR (scaffold via bash plugins/supergraph/skills/browser-agent/scripts/init-qa.sh matrix <feature> [ui|api|fullstack])./supergraph:browser-agent to run autonomous user-flow tests via native Rust CDP (anti-bot bypass, zero Playwright).agent-browser or project e2e test script. Max 2 retries (e2e is inherently flaky). Annotate flaky tests — do not block merge on known-flaky external network tests.For CBM_PROJECT via codebase-memory-mcp (see references/codebase-memory-contract.md) — search_graph/trace_path + recipes dependencies/cross-boundary/test-gaps; fall back to Serena/filesystem if empty.
Pass → mark in-progress tasks Status: completed.
Fail after 3 retries → mark stuck, append failure log.
✅ /supergraph:integration complete
- Unit: PASS | Integration: PASS|FAIL|SKIP | E2E: PASS|FAIL|SKIP
- Cross-module flows: N/M covered | Surprising connections: [list/none]
- Plan status: updated|none
- Next: /supergraph:verify → /supergraph:review
@flaky-annotated e2e tests/supergraph:verify → /supergraph:review还没有评价。欢迎分享你的使用感受。
无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。
还没有评论。来写第一条吧。
Risk analysis and approach selection before planning. Use when requirements are ambiguous, approaches vary, or work touches hub/bridge nodes. Skip for typo fixes.
中文简介正在准备中。当前显示原文说明。
Proactive architecture review — explore codebase structure, generate a self-contained HTML report with Mermaid diagrams and candidate improvements, then grill the findings. Use when planning a large refactor, onboarding to an unfamiliar codebase, or before a major architectural change.
中文简介正在准备中。当前显示原文说明。
Autonomous human-like browser control and professional QA/QC testing. Powered by agent-browser (Rust native CDP, zero Playwright) with ISTQB test matrix generation, automated testcase execution, console/network error tracing, and defect reporting.
中文简介正在准备中。当前显示原文说明。
Persistent token-compression mode (~75% reduction) — now always-on by default. Strips filler while keeping code exact.
中文简介正在准备中。当前显示原文说明。
Database migration best practices for schema changes, data migrations, rollbacks, and zero-downtime deployments across PostgreSQL, MySQL, and common ORMs (Prisma, Drizzle, Kysely, Django, TypeORM, golang-migrate).
中文简介正在准备中。当前显示原文说明。
Anti-slop frontend skill for landing pages, portfolios, and redesigns. The agent reads the brief, infers the right design direction, and ships interfaces that do not look templated. Real design systems when applicable, audit-first on redesigns, strict pre-flight check.
中文简介正在准备中。当前显示原文说明。