Analyze Kanban flow metrics to identify bottlenecks and improve team throughput. Covers Cycle Time, Throughput, WIP, and Flow Efficiency using Little's Law and Theory of Constraints. Use when a team wants to optimize delivery flow or improve predictability. Do not use for sprint-based Scrum planning — use sprint-planning-assistant instead.

中文简介正在准备中。当前显示原文说明。

查看安装方法

包含的文件(2)

  • SKILL.md4.3 KB
  • agents/openai.yaml167 B

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Kanban Flow Analyzer

Purpose

Transform raw task completion data into actionable flow insights — find bottlenecks, set WIP limits, and forecast delivery dates with confidence intervals.

When to use

  • team wants to reduce cycle time or improve delivery predictability
  • WIP is growing and tasks are stalling in certain board columns
  • management asks "when will this be done?" and the team has no data-driven answer
  • transitioning from time-boxed sprints to continuous flow

When not to use

  • sprint planning with story points (use sprint-planning-assistant)
  • strategic roadmap or portfolio prioritization
  • teams with fewer than 4 weeks of historical data

Inputs

  • task data with start date and completion date (minimum 4 weeks history)
  • board column names and WIP limits (if any)
  • team size and working days per week
  • specific questions or concerns about flow

Procedure

  1. Calculate 4 core flow metrics:
    • Cycle Time: days from "In Progress" to "Done" — report P50 (median) and P85
    • Throughput: items completed per week — report average and trend
    • WIP: items currently in progress — compare to team capacity
    • Flow Efficiency: (active work time / total elapsed time) × 100%
      • Typical: 15–25% | High-performing: > 40%
  2. Apply Little's Law: Cycle Time = WIP ÷ Throughput
    • If cycle time is high but throughput is stable, WIP is too high
  3. Detect bottlenecks using Theory of Constraints (5 Focusing Steps):
    • Identify the column with highest average queue time
    • Exploit: maximize throughput at the constraint
    • Subordinate: slow upstream to match constraint capacity
    • Elevate: add capacity or change process at constraint
    • Repeat: new constraint will emerge
  4. Set WIP limits: initial recommendation = team size × 1.5 per column, then adjust based on data.
  5. Forecast delivery using Monte Carlo simulation:
    • "If avg throughput = 12 items/week, 60-item backlog takes ~5 weeks at P85 confidence"

Output

  • flow metrics dashboard (Cycle Time, Throughput, WIP, Flow Efficiency)
  • bottleneck analysis with identified constraint and root cause
  • WIP limit recommendations per board column
  • top 3 actionable improvements with expected impact
  • Monte Carlo forecast (items by date at P50, P85, P95 confidence)

Definition of done

  • all 4 flow metrics are calculated and reported
  • at least one bottleneck is identified with a root cause
  • WIP limit recommendations are provided
  • forecast includes at least P85 confidence level

Examples

  • "Analyze our Jira board data for the last 8 weeks — why are tasks stuck in Code Review?"
  • "Our cycle time went from 5 days to 12 days. What happened?"
  • "Set WIP limits for a 7-person team with columns: To Do, In Progress, Review, QA, Done."

Quality Criteria

  • Data sources and assumptions are explicitly stated
  • Calculations are reproducible from provided inputs
  • Visualizations or tables have clear labels, units, and time ranges
  • Caveats and confidence levels are documented for estimates

Verification (4C)

CheckQuestion
CorrectnessAre formulas, aggregations, and statistical methods applied correctly?
CompletenessDoes the analysis cover all requested metrics and time ranges?
Context-fitAre the chosen metrics relevant to the business question being answered?
ConsequenceIf this data were used for a decision today, what blind spots remain?

Edge Cases

  • Missing or incomplete data — Document gaps and their potential impact on conclusions. Provide ranges instead of point estimates.
  • Outliers skewing results — Report with and without outliers. Document the decision to include or exclude.
  • Changing data definitions mid-period — Split analysis at the change boundary and note the schema difference.

Changelog

  • v1.0.0 — Initial release

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Design rigorous A/B test plans with hypothesis, sample size calculation, Minimum Detectable Effect (MDE), randomization strategy, and decision rules. Includes guardrail metrics and rollout playbook. Use when planning product experiments, conversion optimization, or data-driven feature decisions.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

Review REST and GraphQL API designs for consistency, usability, and best practices. Covers naming conventions, versioning strategy, error format, pagination, authentication patterns, and breaking change detection. Use when reviewing API specs, designing new APIs, or auditing existing endpoints.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

Write Architecture Decision Records (ADRs) following the Michael Nygard format. Captures context, options considered, decision rationale, and consequences. Use when making technology choices, framework selections, or any architectural decision that future developers need to understand.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

Assess organizational readiness for financial audits (internal or external). Map assertions to account balances, check evidence completeness, score readiness using a Red/Amber/Green framework, and generate a remediation timeline. Aligned with SOX, IFRS, and GAAP audit standards. Use before scheduled audits or when preparing for first-time compliance.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

Design safe recurring Codex automations with clear prompts, outputs, schedules, and gating rules.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

Refine Product Backlog Items to meet INVEST criteria. Write User Stories with Acceptance Criteria in Given/When/Then format, estimate with Story Points, and flag dependencies. Use before sprint planning when backlog items need grooming. Do not use to prioritize the backlog — that is the Product Owner's decision.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

查看 hoavdc 的全部技能

报告此技能的问题